The Insurrectional Project
Web PDFImposed PDFRaw TXT (OCR)
THE INSURRECTIONAL PROJECT  Alfredo M. Bonanno
Translated from Talian by Jean Weir in collaboration with John Moore and Leigh Stracross  Elephant Editions- London - 2000 KKA Publications- San Francisco, CA - 2001 Quiver Distro- Santa Cruz, CA - 2006
The Insurrectional Project 3  PREFACE  If we refuse to let our lives be organised by others we must have the capacity to organise ourselves, that s, we must be able o *put together the elements necessary to act as a coherent functioning whole’. For anarchists, individuals who ardently desire the climination of every trace of tyranny and domestication, this has been experimented in a myriad of forms according to prevailing social and economic conditions, and marked by each one’s particular concept of wholeness. If this could once be interpreted—t  some-—to mean a  big organisation to oppose big industry, today social disintegration and uncer- tainty have gone further than any eritique i relegating such undertakings to the pages of history. We are left with the exquisite dilemma: if my freedom depends on the freedom of all does not the freedom of all depend on my acting to free ‘myself? And ifall the exploited are not acting to free themselves —as a tangible composite whole—how can | function, i.¢. organise myself to destroy the real- ity that oppresses me without delay? In other words, how can I act as a whole. that secks to expand and enhance itself to infinity? Having refused the sop of participation, voluntary work and progressive change with which the democratic ideology seeks to satiate its bloated subjects, 1 am left with myself and my un- ‘mediated strength. I seek my accomplices: two or three, hundreds or hundreds of thousands, to upset and attack the present social order right now—in the tiny act that gives immediate joy, indicating that sabotage is possible for everyone; or in great moments of mass destruction where creativity and anger combine in unpredictable collusion. I am therefore faced with the problem of creating a project whose immediate aim is destruction, which in turm creates space for the  What holds things together and puts my actions in context cannot therefore be a fixed formal organisation, but the development of the capacity to onganise myself, alone and with others, where numbers are not an aim, but are always potentially present. In other words, I must create an insurrectional project which already contains all the clements of a revolutionary perspective: the decision to act now: analysis of the present time taking account of the profound transformations capital is undergoing globally and which have had an effect on
Alfredo M. Bonanno  the whole concept of struggle; choice of objectives, means, ideas, desires; the ‘means of making these known to others in my search for affiity; the creation of occasions for confrontation and debate, and much more besides. Projectuality becomes force inmovement, a propelling element within the whole insurrectional flux,  The following texts come to us from a series of meetings that took place in Greece some years ago. A sub-heading of one of the sections has since reached notoreity after being chosen by the ltalian carabinieri in 1996 to name the phantom armed organisation they subsequently accused dozens of anarchists of belonging to. This should not divert us from our understanding of the tex, which could be seen as  starting point, an invitation to consider and experiment in the insurrectional adventure.  Jean Weir
The Insurrectional Project 5  INTRODUCTION  In January 1993 I was invited to Greece along with another comrade 10 hold a number of talks at the Athens Polytechnic and the Law Faculty of Salonika.  “The texts published here are: an outline of the talks I intended to give. a transeription of the tapes of the Salonika conference and a transcription of an interview with the Athens daily Elefiherotipia. As the first of these texts was. intended to be a guide to the conferences, I worked it out in detail along with the Greek comrades in time for it to be translated and handed out to those present. “This was necessary due to the difficulties of on the spot interpretation.  1 published the texts in May 1993 in number 72 of Anarchismo, with the ttle ‘Recent Developments in Capitalisny”.  The three picces have a homogeneity that still makes them worth publishing together, as they all concern capitalistrestructuring and the forms of insurrectionalist struggle that anarchists ar proposing against it  A curious thing happened. The penultimate section of the fist picce  published here isstill entitled ‘Revolutionary anarchist insurrectionalist organi- sation”. The origin of this now infamous heading is rather strange and deserves comment. In fact | had originally entitied the subsection “Informal anarchist insurrectionalist organisation’, but we came up against difficulties when trying 1o translate the term ‘informal”. It was impossible to solve them before my ar- sival in Greece, so the comrades suggested replacing the term “informal” with the more generic one, ‘revolutionary.  forgot o restore the word ‘informal when  published the textin Ialy, although it is nearer to what I am talking about n that particular section.  1do not feel I can make such a correction now given all the nonsense that the specialists of the Attomey Generals office in the courts of Rome, led by Public Prosecutor Marini, have come out with  think it might be useful to give a brief description of the way the minds of the ltalian judiciary and Carabinieri have laboured on this text.  On September 17, 1997, dozens of anarchists were arrested in ltaly on charges of kidnapping, robbery, murder, pos  sion of arms, etc., initiating what
5 Alfredo M. Bonanno  came to be known as the Marini Frame-up’. These separate charges were trans- formed into one combined charge, .. that of belonging to a clandestine armed organisation entitled the ORAL The name had been taken from the paragraph ‘mentioned above: Revolutionary anarchist insurrectionalist organisation.  ‘This trial is sill going on, and could drag on for years to come given the various legal stages which make up the process. We were freed from prison fourteen months after being arrested thanks to a simple procedural error: the Attorney’s Office genius in Rome had been so busy trying to justify a phantom “armed gang’ that they forgot to follow their own rules. The resultis that although still facing charges that carry life imprisonment those who, like myself,  id not have sentences pending are now all at liberty. As the enthralled reader will discover, the following texts contain o  theory relative to a specific armed organisation, but are an examination of the  insurrectionalist method of organising. This is based on affinity groups com- posed of anarchists, the elaboration of a common revolutionary project, their linking together in an informal organisation, the constitution of base nuclei in a  situation of mass  struggle and, finally, the way these structures could be linked together.  1 realise that for the obtuse mentality of a Carabinieri educated to sceing the enemy as a negative copy of himself and his organisation, nothing under the sun could exist thatis not equipped with an organisation chart leaders, strategies and objectives. And up to this point I can even understand a tenden- tious reading of the text in question. But what I cannot understand, and what no reader will surely be able to cither,is how such a text came to be given the task  of constituting the foundations of a clandestine armed organisation. This is sill  simmering away in the mind of the Public Prosecutor, who will stop at nothing 1o demonstrate our guilt  Stop at nothing. Precisely, even to the point of denying all the evidence. 1o the contrary. And in fact, as appears from the trial documents and even from the succinct phrasing of the arrest warrants, they must have had a few doubts on the subject. However, these were evidently cast aside due 10 the greater precedence of their need to justify the unjustifisble: If it is true that Bonanno is theorising a specific armed clandestine organisation (ORAI) in this picce (‘Recent Developments in Capitalism’), then we, the Prosecution and Carab-
The Insurrectional Project  inieri, declare that he cannot have gone to Greece to talk about it publicl  university auditorium. That would be illogical. And as the text in question must ‘mean what we, Prosecution and Carabinieri, say it means, then we must conclude that Bonanno did not go to Greece, did not give these conferences, and did not write this text as an outline and memorandum for what he was about to say in public... A logical conclusion! Only it ignores one thing: that in both Athens and Salonika hundreds of people were present at these conferences. There are tape recordings not just of the conferences but of the whole debate. Both the conferences and the Salonika debate have been transcribed and presented in a book published in Greece. And, finally, there are even photographs published along with my interview (the third of the pieces published here) on February 25 1993 in the Athens daily Elefiherotipia.  But why do the prosecution want to read something —the theorisation of an inesxistent armed band complete with name —into this text, even at the risk of making themselves ridiculous? There is a simple answer: because they would not otherwise be able to sentence dozens of anarchists for conspiracy—a conspiracy that clearly does not exist. It would then remain for them only to prove individual charges which would have to be dealt with separately, accord- ing to the rules of the penal code, ctc.  ‘The aceusers know perfectly well that the second alternative would not be casy for them. They are well aware that most of the charges arc based on the spurious aceusations of a young girl bribed by them, that s why they are so persistent in wanting to read something that is not there into this fext.  In fact, the concept of informal organisation proposed in the text in question does not in any way resemble that of an armed clandestine organisa- tion. We are in two different worlds. The closed organisation (necessarily so if we are talking of clandestiniy), is an instrument like any other, and in certain conditions of the class clash it might even be useful as defensive or offensive ‘means fone finds oneselfin dire straits. The economic and social structure would have to change profoundly in order for it to become useful as a means today. Capital would have to turn back on its steps to the conditions of production that existed in the Eighties when there was a strong, centralised working class and a fixed transmission belt of left wing unions and parties —all things which clearly 1o longer exist. The closed organisational model, which only indirectly wants
5 Alfredo M. Bonanno  the struggle to generalise and does nothing in that direction other than make its actions known through the media—and we know how hat functions —cor- responds in many respects to the ideological conditions that sum up the union and the party. If we refuse to be likened to poli  al partics, we must also refuse to be compared to organisations whose aim is numerical growth, increasing the ‘number of is actions and setting tself up as the mainstay of the class struggle.  Of course, if anarchists were to get involved in constituting a specific. closed organisation, they would do it in quite a different way to the classic sclerotic one of the Marxist-Leninists. And there is no doubt that, in its time, Azione Rivoluzionaria was an attempt in that direction. But it soon moved away from  and closed itself up in the logic of recruiting and joining arms with the other  initial tragectory in the direction of a generalisation of the struggle,  combatant organisations on the scene at the time. I am not saying that they did not make any interesting proposals, especially in their early documents. What | ‘am saying is that, not only did these proposals not stand up to criticism but by withdrawing  o position of defence they ended up anniilating themselves by becoming more and more clandestine, that’s all. The best comrades, it was said atthe time, are those in prison. One simply had to end up in prison to become a better comrade.  “The problem is simple. When we work out an analysis we cannot put our own personal positions aside. These inevitably come to permeate the analysis without our meaning it to. And when the latter is written in prison, it is obvious that that is where it has come from. Morcover, when a comrade sces his imme- diate reality to be radically compromised he conveys this in the analyses he is working on, as well as in the kind of intervention and methods he proposes. By imprisoning himself in the stifling viewpoint of a clandestine organisation his. way of thinking becomes clandestine even to himself, almost without realizing it  1t has been said that if one were to find oneself in a pre-revolutionary phase (although no one could explain how we were to recognise this phase), the only road possible would be that of the more or less closed armed organisation. It was later scen that all attempts at “being different” simply ended up aborting. themselves in the classic condition of closure. It does not oceur to anyone today that we are in a pre-revolutionary phase, s if we were to accept the idea of a
The Insurrectional Project 9  specific armed organisation it would simply be a question of our own personal decision, nothing more. A choice like any other. And I say that with no expecta- tions concerning the accusations in the trial in Rome.  ‘At this point I could quote something I wrote years ago, in an article in 1979 t0 be exact—enitled “On Clandestine Or-  published in Anarchismo- ganisation”, which is also available in my book The Illogical Revolution (pages 88-90), but it seems pointless to me. While many might simply have forgotten these words from the past, I myself do not know what to do with them. 1 do ot even want to read them again, because they belong to a period that s quite different to the present. As far as [ can remember, they referred to the fact that the critique of the closed clandestine organisation is not simply an affirmation of individualism. Cri  ism docs not have a weakening cffect, it strengthens. But something strange occurs when those under criticism are comrades who participate in, or support, a closed form of organisation, even in theory. The eritique is taken as a personal attack or something aimed at weakening one’s conditions. And when you are faced with a comrade with years of prison hang- ing over them, you run the risk of being lynched. I do not think that the concept of the generalisation of the struggle, including armed struggle, is the refusal of organisation. Nor do I think that to criticise the closed clandestine organisation means to ‘expose oneself to massacre’. Such generalisations do not interest  ‘The informal organisation of afinity groups and the consequent devel- opment of base nuclei in specific mass struggles, are the organisational forms 1 consider most useful today for the generalisation of the struggle, armed or otherwise.  Alfvedo M. Bonanno Catania, 10 October 1998
0 Alfredo M. Bonanno  RECENT DEVELOPMENTS IN CAPITALISM  From the late Seventies until the carly Eighties, industry in the leading capitalist countries was in crisis. The relationship between plant and productiv- ity had never been worse. Struggles led by the trades unions, as well as those of the proletariat in general (especially in their more violent manifestations under the leadership of the various revolutionary working class structures), had led to a rise in labour costs quite out of proportion to capital’s income. Incapable of adjusting, lacking the strength to reduce labour and employment costs drastically, it seemed as though the whole system wa  moving towards its natural collapse.  But by the first half of the Eighties rapid change had set in, with in- dustrial restructuring taking an electronic direction. The primary and secondary productive sectors (industry and agriculture) were in decline, with consequent reductions in employment. The tertiary (services) scctor had expanded out of all proportion, absorbing some of the laid-off work force, thus attenuating the social backlash that the capitalists had feared more than anything else.  In short, the much-feared riots and revolutions did not take place. There was no intolerable pressure from the reserve amy of the proletariat. Instead, everything quietly adapted to changes in the structures of production.  Heavy industry replaced old plans with robotised ones capable of reaching hitherto undreamed of levels of lexi  lity and low levels of investment. Labour costs deereased without this leading to any fall in demand because the services sector held well, assuring levels of income that were sufficient o inflate the capitalist system as a whole. Most of the sacked workers managed to find some way of getting by in the new flexible and permi  ive capitalist world  The new productive and democratic mentality  None of this would have been possible without the emergence of anew. flexible mentality at the work place: a reduction in the need for professional qualifications and an increase in the demand for small, auxiliary jobs. This coincided with a consolidation of the democratic mentality.
The Insurrectional Project 1  The middle classes” myths of carcers and improvements in workers’ wages disappeared for good. All this was possible thanks to articulated inter- ventions at every level: a) In the schools, in the adoption of less rigid teaching ‘methods better suited to building a ‘malleable” personality in young people. “This was to enable them to adapt o an uncertain fture of the kind that would have filled their parents with horror; b) In the political management of the most advanced capitalist countries. Authoritarianism gave way 1o democratisation, involving people in ficttious electoral and referenda procedures; ¢) In produc- tion where, as we have said, the disappearance of professional qualifications has ‘made producers tame and flexible.  ‘This ll took place according to the spirit of the times. Dreams of philo- sophical and scientific certainty gave way to a ‘weak” model, based not on risk and courage but on adjustment in the short-term, on the principle that nothing is certain but anything can be fixed.  As well as contributing to the disappearance of the old and in many aspects out-of-date, authoritarianism, the democratic mentality also led to a ten- dency to compromise at every level. This resulted in a moral degradation where the dignity of the oppressed was exchanged for a guaranteed but uncomfortable survival. Struggles receded and weakened.  Obstacles faced by the insurrectional struggle against post-industrial capital- ism and the State  ‘Undoubedly one obstacle to be faced i precisely this amorphous, flex- ible mentality outlined bove. This cannot be compared to the old-style reliance on social security;  simplya desire o find a niche in which to survive, work as little as possible, accept all the rules of the system and disdain ideals and projects, dreams and utopias. The laboratories of capital have done an exemplary job in this sense. School, factory, culture and sport have united to produce individuals who are domesticated in every respect, incapable of suffering or knowing their enemies, unable to dream, desire, struggle or act to transform reality  Another obstacle, which is related to the irst,consists of pushing pro- duction to the margins of the post-industrial complex as a whole. The dismem- bering of the class of producers is no longer a nebulous project, it has become a reality. And the division into numerous small sectors which often work against
2 Alfredo M. Bonanno  ach other is increasing this marginalisation. This i  as workers” parties and trades unions, obsolete. Recent years have witnessed a  fast making the traditional structures of worker resistance, such  progressive disappearance of the old-style trade-unionism, including that which once aspired to revolution and self-management. But, more importantly, we have witnessed the collapse of the communism which claimed to have builta socialist State—realised through police control and ideological repression.  It cannot be said that any organisational strategy capable of responding 1o the new conditions of capitalist productive and social reality in general has emerged.  Developments that might have arisen from proposals made by insurrectionalist anarchists, especially those moving in the direction of informal relations between individuals and groups based on affinity, have not yet been fully taken on board. They have often received a tepid welcome by comrades due to a certain, in some ways understandable, reluctance to abandon the old ways of thinking and apply new methods of organisation.  ‘W will say something about this further on as it s central to the struggle against the new structures of repression and total control produced by Capital and the State.  Restructuring technology  ‘The present technological revolution based on information technology. lasers, the atom, subatomic particles, new materials such as optic fibres which allow energy transportation and consumption at speeds and over distances once unthinkable, genetic modification conceming not only agriculture and animals but also man, etc., has not stopped at changing the world. It has done more. It has produced conditions that make it seem impossible to plan or make plans for the foreseeable future, not only s far as those who intend to maintain the present state of affairs are concerned, but also by those who intend to destroy them.  “The main reason for this s that the new technologics, which are now interacting and becoming part of the context that has been developing over at least the past 2,000 years, could produce unpredictable results. And some of these results could be totally destructive, far beyond the devastating effects of an atomic explosion,
The Insurrectional Project 13  Hence the need for a project aimed at the destruction of technology as a whole in its first, essential phase, and which bases all its political and social approaches on this imperative.  Political, economic and military restructuring Profound changes are also taking place in the cconomic sector. These  changes are affecting the political situation in advanced capitalist countries, with  consequent effects on the military sector.  New frontiers in post-industrial capitalism are emerging from wide- spread processes and re-arrangements that are continually in flux. The static concept of production tied to heavy machinery in huge factories capable of producing a multiplicity of consumer goods has been surpassed by the ingenious idea of swift change and increasing competition in specialised production with stylish, individual, personalised products. The post-industrial product does not require skilled labour but s set up on the production line directly, simply by reprogramming the robots to produce it. This has meant incredible reduction in storage and distribution costs and climinated obsolescence and stockpiling of unsold products.  “This development ereated great new possibilites for capital around the. beginning of the Eighties, and by the end of the decade it had become the norm. So the political situation had to change to correspond with the new economic  This explains the considerable changes that took place at the end of the cighties and the beginning of the ninetics. There has been a move towards careful selection of the managerial strata, which must be able 10 see 0 the require- ‘ments of this new form of production. That explains why advanced industrial countries such as the US and Great Britain went through a period of increased authoritarianism in government, then moved on to amore versatile, flexible form  of political management corresponding to the economic necessities of various  countries which are now all coordinated globally.  The collapse of actual socialism and the rebirth of various forms of national-  Any advance from the countries of actual socialism beyond cautious,
14 Alfredo M. Bonanno  reciprocal suspicion was unthinkable in the old capitalist reality. But the birth of the new computerised, automated capitalism has not only made advances possible but has forced these counties to change radically, pushing them to an irreversible as it was indecent collapse.  Rigid authoritarian regimes based on ideological calembours such as proletarian internationalism and the like are finding it difficult to comply with the needs imposed by a production structure that is now coordinated globally.  Ifthey do not want to get stuck in a precarious, marginal situation, the few remaining authoritarian regimes will have to resolutely democratise their political management. Inflexibility forces the great international partners of industrial development to stiffen and declare war one way or the other.  Itisin g  sense that the role of the army has also changed consider- ably. It has intensified internal repression, and at the same time taken on the role of global policeman that was first developed by the US. This will probably continue for a number of years unil other erises interrupt and require new yet equally precarious and dangerous forms of equilibrium.  Accordingly, the resurgence of nationalism is bringing with it one posi- tive albeit limited element, and one that is extremely dangerous. Its immediate and specific effect consists in the overturning and dismemberment of the big States. Any movement that goes in this dircction is to be hailed as positive, even if on the surface it presents itself as being a carrier of traditional, conservative. values  ‘The other factor, the one thatis extremely dangerous, s the risk of wars  spreading between the small States, declared and fought with unprecedented ferocity and causing tremendous suffering in the name of miserable principles and just as miserable alternatives.  Many of these wars will lead to a more efficient and structured form of post-industrial capitalism. Many will be controlled and piloted by the mult- national giants themselves. But basically they represent a transitory condition, a kind of epileptic fit, following which social conditions could evolve in the dircetion of the climination of any trace of the old State organisms.  At the moment we can only guess how this might happen, starting off from an examination of conditions today.
The Insurrectional Project is  Possible developments of the insurrectional mass struggle in the direction of anarchist communism  ‘The end of the great trades union organisations’ function of resistance and. defence —corresponding with the collapse of the working class —has allowed us t0’see another possibilty for the organisation of the struggle. This could start from the real capacity of the excluded, i.¢., of the great mass of exploited, producers ‘and non-producers, who already find themselves beyond the area of guaranteed wages, or who will in the near future,  “The proposal of a kind of intervention based on affinity groups and their coordination and aimed at creating the best conditions for mass insurrection often comes up against a brick wall even amongst the comrades who are interested in it. Many consider it o be out of date, valid at the end of the last century but decidedly out of fashion today. And that would be the case had the conditions of production, in particular the structure of the factory, stayed as they were a hundred and fifty years ago. The insurrectionalist project would undoubtedly be inappropriate were such structures and ther corresponding organisations for trade union resistance stilin existence. But these no longer exist, and the mental- ity that went with them has also disappeared. This mentality could be summed up by respect for one’s job, taking a pride in one’s work, having a career. This, along with the sense of belonging to a producer’s group in which to associate and resist and form trade union links which could even become the means for addressing more problematic forms of struggle such as sabotage, anti-fascist activity and so on, are all things of the pas.  Al these conditions have disappeared for good. Everything has changed  radically. What we could call the factory mentality has ceased to exist.  ‘The trade union has become a gymnasium for carceri  s and politicians. ‘Wage bargaining has become a filer for facilitating the adaptation of the cost of labour to the new structures of capital. Disintegration s extending rapidly beyond the factory to the whole social fabric, breaking bonds of solidarity and  all significant human relationships, turning people into faceless strangers, au- tomata immersed in the unliveable confusion of the big cities or in the deathly silence of the provinces. Real interests have been substituted by virtual images ereated for the purpose of guarantecing the minimum cohesion necessary to hold  the social mechanism as a whole together. Television, sport, concerts, art and
16 Alfredo M. Bonanno  cultural acti;  ies constitute a network for those who passively wait for things.  1o happen, such as the next riot, the next crisis, the next civil war, or whatever.  “This s the situation we need to bear in mind when talking of insurrection. ‘We insurrectionalist and revolutionary anarchists are not referring to something that is sill to come about, but to something that is already happening. We are not referring to a remote, far off model, which, like dreamers, we are trying to bring back to life, unaware of the massive transformations that are taking place at the present moment. We live in our time. We are the children of the end of the millennium, actors taking part in the radical transformation of the society we se before us.  Not only do we consider insurrectionalist struggle to be possible bu, faced with the complete disintegration of traditional forms of resistance, we think thatitis the condition towards which we should be moving if we do not want to end up accepting the terms imposed by the enemy and becoming lobotomised slaves, insignificant pawns of the mechanisms of the information technology that will be our master in the near future.  ‘Wider and wider strata of the excliuded are moving away from consensus, and consequently from accepting reality or having any hope of a better fture. ‘Social strata who once considered themselves to be stable and not at risk are now living in a precariousness they will never be able to escape from by dedication  1o work and moderation in consumerism.  Revolutionary anarchist insurrectionalist organisation  We believe that instead of foderations and groups organised in the traditional sense—part of the economic and social structures of a reality that o longer exists—we should be forming affinity groups based on the strength of mutual personal knowledge. These groups should be capable of carrying out specific coordinated actions against the enemy.  As far as the practical aspects are concemed, we imagine there would be collaboration between groups and individuals to find the means, documen- tation and everything clse necssary for carrying out such actions. As far as analyses are concerned, we are attempting to circulate as many as possible in our publications and through meetings and debates on specific questions. An
The Insurrectional Project 17  insurrectionalist organisational structure does not rotate around the central idea of the periodic congrss typical of the big syndicalist organisations or the of- ficial movement federations. s points of reference are supplied by the entirety of the situations in the struggle, whether they be attacks on the class enemy or ‘moments of reflection and theoretical quest.  Affinity groups could then contribute to the forming of base nuclei. The aim of these structures isto take the place of the old trades unions resistance or-  ganisations on the anarch  including those who i  syndicalist ideology—in  the ambit of intermediate struggles. The base nuclei’s field of action would be  any situation where class domination enacts a separation between included and excluded.  Base nuclei are nearly always formed as a consequence of the propulsive actions of insurrectionalist anarchists, but they are not composed of anarchists alone. At meetings, anarchists should undertake their task of outlining class objectives to the utmost.  A number of base nuclei could form coordinating structures with the same aim. These specific organisational structures are based on the principles of permanent conflictuality, sclf-management and attack.  By permanent conflictuality we mean uninterrupted struggle against elass domination and those responsible for bringing it about.  By self:management we mean independence from all parties, trades unions or patronage, as well as finding the means necessary for organising and carrying out the struggle on the basis of spontancous contributions alone.  By attack we mean the refsal of any negotiation, mediation, reconcili- ation or compromise with the enemy.  ‘The field of action of affinity groups and base nuclei s that of mass.  struggles.  ‘These struggles are nearly always intermediary, which means they do. not have a direct, immediately destructive ffect. They often propose simple objectives, but have the aim of gaining more strength in order to better develop the struggle towards wider objectives.  Nevertheless,the final aim of these intermediate struggles is always at- tack It however obviously possible for individual comrades or affinity groups 1o strike at individuals o organisations of Capital and the State independently
18 Alfredo M. Bonanno  of any more complex relationship.  ‘Sabotage has become the main weapon of the exploited in their struggle in the scenario we sce extending before our very eyes. Capitalism is creating conditions of control and domination a levels never scen before through informa- tion technology which could never be used for anything other than maintaining power.  Wiy we are insurrectionalist anarchists — Because we are struggling along with the excluded to alleviate and ultimately abolish the conditions of exploitation imposed by the included.  —Because we consider it possible o contribute to te development of struggles that are appearing spontancously everywhere, turning them into mass insurrections, that s to say, actual revolutions.  —Because we want to destroy the capitalist order of the world which, thanks to computer science restructuring, has become technologically useful to no one but the managers of class domination.  — Because we are for the immediate, destructive attack against the structures, individuals and organisations of Capital and the State.  —Because we constructively crificise all those who are in situations of com.-  promise with power in their belief that the revolutionary struggl  impossible at the present time. — Because rather than wait, we have decided to proceed to action, even if the time is not ripe. — Because we want to put an end to this state of afairs right away, rather than wait until conditions make its transformation possible.  ‘These are the reasons why we are anarchists, revolutionaries and insur- rectionalists.
The Insurrectional Project 19  ANARCHISTS IN THE FACE OF THE NEW CAPITALIST ORDER  Comrades, before starting this talk, a couple of words i order to get o know each other better. In conferences a barrier s nearly always created beween whoever is talking and those who are listening. So, in order to overcome this obstacle. we must try to come to some agreement because we are here to do something together, not simply to talk on the one hand and listen on the other. And this common interest needs to be clearer than ever given the questions about ta be discussed this evening. Often the complesxity of the analyses and the difficulty of the problems that are being tackled separate the person who is talking from those who are lstening, pushing many comrades into a passive dimension. The same thing happens when we read a difficult book which only interests us up 10 a point, a book with a title such as Anarchism and Post  dustrial Society, for example. I must confess thatif I were to see such a book in a shop window, I’m not sure I’d buy it  That is why we need to come to some agreement. I think that behind the facade of the problem under discussion, undoubtedly a complex one, the fact that we are anarchists and revolutionary comrades means we should be able to find some common ground. This should permit us to acquire certain analytical instruments with which to better understand reality, so be able to act upon it more effectively than before. As a revolutionary anarchist I refuse to inhabit two separate worlds: one of theory and another of practice. As an anarchist revolutionary, my theory is my practice, and my practice my theory.  ‘Such an introduction might not go down well, and it will certainly not please those who support the old theories. But the world has changed. We are faced with a new human condition today, a new and painful reality. This can leave no room for intellectual closure or analytical aristocracies. Action is no. longer something that is separate from theary, and this will continue to be the case. That is why it is important to talk about the transformation of capitalism et again. Because the situation we see before us has already undergone rapid restructuring,
20 Alfredo M. Bonanno  ‘When we find ourselves in a situation like this, we tend to let ourselves. be seduced by words. And weall know anarchists’ vocation for words. Of course we are for action too. But tonight it is a question of words alone, so we run the sk of getting drunk on them. Revolution, insurrection, destruction, are all words. Sabotag Ihave heard various questions asked. Sometimes they were asked in bad faith,  —there, another word. Over the past few days spent here among you  as far as | could tell. But translation from one language to another comes into it, and I don’t want to be malevolen. 1 just want to say that it is important ot to deceive oneself that my analysis provides the solution to the social problem. do not believe any of the comrades 1 have spoken to over the past few days have the solution either. Nor does the anarcho-syndicalist comrade with his analyses based on the centrality of the working class, or the other comrades whoas far as | can understand do not seem to agree with him and are proposing an intervention of an insurrectionalist nature. No, none of these hypotheses can claim to possess the truth. If anarchism teaches anything it teaches us to be wary of anyone who claims to0 hold the truth. Anyone who does so, even if they call themselves an imply aim to formulate a critique of the existent, and if we sometimes get carried away  anarchist,is always a priest as far as | am concerned. Any discourse must  with words, it is the desire 1o act that gets the better of us. Let us stop here and start thinking again. The destruction of the existent that opprsses us will be a long road. Our analyses are no more than a small contribution so that we can continue our destructive revolutionary activity together in ways that make any small talk simply a waste of time.  So, what can we do? Anarchists have been asking themselves this for a long time: how can we come into contact with the masses? to use a term which often comes up in this kind of discussion, and which I have also heard on various occasions over the past fow days. Now, ths problem has been faced in two different ways. In the past, throughout the history of anarchism, it has been faced by using the concept of propaganda, that i, by explaining who we are to the masses. This, as we can easily see, is the method used by political parties the world over. Such a method, the use of traditional anarchist propaganda, s in difficulty today in my opinion, just as the spreading of any other ideology is. It is not so much that people don’t want to have anything to do with ideology any longer as that capitalist estructuring is making it pointless. And I must say here
The Insurrectional Project 21  publicly that anarchists are having difficulty in understanding this new reality, and that it is the subject of an ongoing debate within the international anarchist ‘movement. The end of ideology is leading to a situation wher traditional anar- chist propagand is becoming pointless. As the effectivencss (or il  ion, we do notknow which) of propaganda disappears,the road o direct contact with people is opening up. This is a road of conerete struggles, srugeles we have already ‘mentioned,everyday questions, butof course one can’t exceed one’s imitations. Anarchists are a very small minority. It s not by making a lot of noise,or by using advertising techniques that they will be able to make themselves heard by the people. So it is not  question of choosing the most suitable means of com- ‘munication—because this would take us back to the problem of propaganda and therefore ideology, again—but rather of choosing the most suitable means of struggle. Many anarchists belicve th  to be direct attack, obviously within the limits of their possibilities, without imagining themselves to be anyone’s fly coachman,  L ask you to reflect for a moment on the state of Capitalism at the beginning of the Eightics. Capitalism was in difficulty. It was facing increased labour expenditure, a restructuring of fixed plans at astronomically high costs, a rigid market, and the possibility of social struggles developing in response to [  Capitalism changed. It overcame all its difficultics in a way that could never  And then, think about the conditions six or seven years later. How quickly  have been predicted, achieving an unprecedented programme of economic and imperialist management of the world. Perhaps it does not seem 5o at the moment, but this programme aimed at closing the circle of power is well underway. What has happened? How was a situation so wrought with difficulties able to pick up So quickly and radically?  ‘We all know what happened, it is not the technical side of it that sur- prises us. Basically, a new technology has been i  erted into the productive process. Labour costs have been reduced, productive programmes replaced, new forces used in production: we know all this. That is not the aspet of capitalist restructuring that surprises us. No, what astounds us is the latter’s ingenious use of the working class. Because this has always formed the main difficulty for capitalism. Capitalist geniality has succeeded in attacking and dismantling the working class, spreading them all over the country, impoverishing, demor-
2 Alfredo M. Bonanno  alising and nullifying them. Of course it was affaid to do this at first, Capital was always afraid to venture along that road, because reductions in the price of labour have always marked the outbreak of social struggles. But,as s academic representatives had been insisting for some time, the danger no longer e  at least it is disappearing. It is now even possible to lay people off, so long as you do it by changing production sectors, so long as others are being prepared And all the  social forces: parties, unions, social workers, the forces of repression, all levels  1o develop an open mentality and are beginning to discuss thin  of school, culture, the world of the spectacle, the media, have been rallied to tackle Capitalism’s new task. This constitutes a worldwide erusade such as has never been scen before, aimed at modelling the new man, the new worker. ‘What s the main characteristic of this new man? He is not violent, be- cause he is democratic. He discusses things with others,is open to other people’s opinions, secks to associate with others, joins unions, goes on strike (symbolic ones, of course). But what has happened to him? He has lost his identity. He does not know who he really is any longer. He has lost his identity as one of the exploited. Not because exploitation has disappeared, but because he has been presented with a new image of things in which he is made to feel he is a participant. Moreover, he feels a sense of responsibility. And in the name of this social solidarity he is ready to make new sacrifices: adapt, change his job, lose his skills, disqualify himself s a man and a worker. And that is what Capitalism  has systematically been asking of him over the past ten years, because with the  new capitalist restructuring there is no need for qualifications, but simply for a ‘mere aptitude for work, flexibility and speed. The eye must be faster than the ‘mind, decisions limited and rapid: restricted choices, few buttons to be pressed, ‘maximum speed in execution. Think of the importance that video games have in this project, to give but one example. So we see that worker centrality has.  disappeared miserably. Capital s capable of separating the included from the  excluded, that i, of distinguishing those who are involved in power from those who will be excluded forever. By “‘power’we mean not only State management, but also the possibility of gaining access to better living conditions.  But what supports this divide? What guarantees the separation? This lies i the different ways that needs are perceived. Because, if you think about it  for a moment, under the old-style form of exploitation, exploited and exploiter
The Insurrectional Project 23  both desired the same thing. Only the one had, and the other did not. If the construction of this divide were to be fully realised, there will be two different Kinds of desire, a desire for completely different things. The excluded will only desire what they know, what is comprehensible to them and not what belongs to the included whose desires and needs they will no longer be able to comprehend because the cultural equipment necessary to do so will have been taken from them for ever.  “This is what Capitalism is building: an automaton in flesh and bone. constructed in the laboratories of power. Today’s world, based on information technology, knows perfectly well that it will never be able to take the machine 1o the level of man, because no machine will ever be able to do what a man can, So they are lowering man to the level of the machine. They are reducing his capacity to understand, gradually levelling his cultural heritage to the absolute ‘minimum, and creating uniform desires in him.  ‘So when did the technological process we are talking about begin? Did it begin with cybernetics as has been suggested? Anyone who has any experi- ence of such things knows that if poor Norbert Wiener has any responsibility at all it lies in the fact that he started to play around with electronic tortoises. In actual fact, modern technology was born a hundred years ago when an innocent English mathematician started toying with arithmetic and developed binary calculus. Now, following on from that it is possible to identify the various steps in moden technology. But there is one precise moment in which a qualitative leap takes place: when electronics came to be used as the basis upon which the new technology (and consequently the technology for perfecting clectronics) was built. And it  impossible to predict how things wil evolve, because no one can foresce what the consequences of this entry into a new technological phase will be. We must understand that it is not possible to think in terms of cause and effect. For example, it is naive to say that the great powers have the  atomic potential to blow up the world, even though this s so. This idea, 5o ter- ifying and apocalypc, belongs to the old concept of technology based on the hypothesis of cause and effect: the bombs explode, the world is destroyed. The problem we are talking about here opens up the prospect of  far more danger- ous situation beeause it is no longer a matter of speculation but something that  already exists and is developing further. And this development s not based on
2 Alfredo M. Bonanno  the principle of cause and ffect but on the weaving of unpredictable relations. Just one simple technological discovery, such as a new substance for energy conservation for example, could lead to a series of destructive technological relations which no one in all conscience, no scientist, would be able to predict It might cause a series of destructive relations which would not only affect the new technologies, but also the old ones, putting the whole world in chaos. This is what is different, and it has nothing to do with cybemetics, which is only the distant relative of the present nightmare.  In the light of all this we have been asking ourselves for  long time now: how can we attack the enemy if we do not know it in depth? But, if you think about i, the answer s not all that difficult. We very much enjoy attacking the police, for example, but no one becomes a policeman in order to do 0. One informs oneself: how do the police operate? What kind of truncheons do they use? We put together the small amount of knowledge required for us to roughly understand how the police work. In other words, if we decide to attack the police. we simply limit ourselves to obtaining a certain amount of knowledge about them. In the same way, it is not necessary to become engineers in order to aftack the new technology, we can simply acquire some basic knowledge, a few practical indications that make it possible for us to attack it. And from this consideration ‘another, far more important one, emerges: that the new technology is not abstract, itis something concrete. For instance, the international commaunication syster is a conerete fact. In order to build abstract images in our heads it needs to spread itself throughout the country. This is the way the new materials are being used. let us say in the construction of cables for data transmission. And it is here that it is important to know technology, not how it works in the productive aspec, but how it i spread throughout the country. That is to say, where the dircting centres (which are multiple) are to be found and where the communication chan- nels are. These, comrades, are not abstract ideas but physical things, objects that occupy space and guarantee control. It quite’s  mple to intervene with sabotage in this instance. Whatis difficult is finding out where the cables are. ‘We have seen the problem of finding the documentation and rescarch  required to attack: at some point this becomes indispensable. At some point, knowledge of technology becomes essential. In our opinion this will be the  greatest problem that revolutionaries will have to face over the next few years.
The Insurrectional Project 25  Ido not know ifany use will be made of the compute in the society of the future, the self-managed society many comrades refer to, justas it  impos- sible to know whether any use will be made of a considerable number of the new technologies. I fact, it is impossible to know anything about what will happen in this hypothetical society of the future. The only thing I can know, up to a point. concerns the present, and the effects of the use of the new technologics. But we have already gone into ths, so there is no point in repeating ourselves. The task of anarchists is o attack, but not on behalf of their own organisational interests o quantitative growth. Anarchists have no social or organisational identity to defend. Their structures are always of an informal character so their attack, when it takes place, is not to defend themselves (or worse still o propagandise themselves), but to destroy an enemy who i striking everyone. And itis in this decision to attack that theory and practice weld together,  An historically unprecedented kind of capitalism is appearing on the horizon. When we hear of neo-liberalism, thisis in fact what is meant, When we hear talk of global dominion, this is the project that i being refrred to, not the old concept of power, not the old imperialism. It was in the face of this project and its immense capacity to dominate that real socialism collapsed. No such thing would ever have happened in the context of the old capitalism. There is no longer any need for the world to be divided into two opposing blocs. The new  capitalist imperialism s of an administrative kind. Its project is to manage the  world for a small nucleus of included, a the cost of the great mass of excluded.  And with these projects in mind, all possible means are already being used—the new ones we have mentioned, along with the old ones, as old as the world, such s war, repression, barbarity, according to the situation. In this way, n the former Yugoslavia for example, a ferocious war is being waged aimed at reducing a people’s capacities as far as possible. Then there will be an intervention in this situation of absolute destruction in the form of a lttle humanitarian aid which will seem like an enormous amount of help in such conditions of absolute and total misery.  ‘Think of what the state of countries like the former Yugoslavia would be like without the war. A great powder-keg at the gates of western Europe, on our borders, alongside the European Community. A powder-keg ready to explode, social contradictions which no cconomic intervention would ever be
2 Alfredo M. Bonanno  able to raise to the level of western consumerism. The only solution was war, the oldest device in the world, and that has been applied. American and world ittle doubt that they will intervene in the former Yugoslavia because the probability of rebellion in  imperialism are intervening in Somalia and Irag, but there i  this area must be reduced to zero. So, old means are being used along with new ones, according to the situation, according to the economic and socil context involved.  And one of the oldest weapons in the great arsenal of horrors i racism. On the question of racism and all the misdeeds related to it (neo-nazism, fas- cism, etc.), let’s look for a moment at the differentiated development of capital- ist restructuring. In order to understand the problem it is necessary to see how capitalist restructuring cannot solve allis problenss just by waving a magic wand. It is faced with many different situations all over the world, each with various levels of social tension. Now, these situations of social tension are making what is lurking in the depths of each one of us rise to the surface, things that we have. always put aside, exorcised. Essential factors such as racism, nationalism, the fear of the different, the new, Aids, the homosexual, are all latent impulses in us. Our cultural superstructure, our revolutionary consciousness, when it puts on its Sunday clothes, obliterates them, hides them all. Then, when we take off our Sunday best, all these things start o reappear. The beast of racism is always present, and Capitalism is always ready to use it.In ituations such as that which exists in Germany where social tensions have developed rapidly over the past few years, this phenomenon is in constant development. Capital controls rac- ism and uses certain aspets of it, but it is also affaid of it i that the overall ‘management of world power is of a democratic, tolerant and possibilist nature.  From the point o view of utlisation, anything (¢.&., ideology, fear) can exist—it is all part of capital’s projet. We cannot say with certainty that post-industrial  capitalismis against racism. We can seea fow of its main characteristics, such as  its democratic nature, then suddenly discover that in the context of one specific  country the same technologically advanced capitalism is using methods that  were used a hundred years ago: racism, persecution of Jews, nationalism, attacks on cemeteries, the most hateful and abominable things man can devise. Capital is manifold, its ideology always Machiavellian: it uses both the strength of the lion and the cuning of the fox.
The Insurrectional Project 27  But the main instrument of capitalism the world over are the new technologics. We must think about this a lttle, comrades, in order to dispel so ‘much confusion. And in doing so we must also consider the possible use of such technology on our part, in changed social conditions, in a post-revolutionary situation. We have already seen how there has been a great qualtative leap from the old technologies to the new—by new technologies we mean those based on computers, lasers, the atom, subatomic particles, new materials, human, animal and vegetable genetic manipulation. These technologics are quite different fiom, and have litle to do with, the old ones. The latier limited themselves to transforming material, to modifying reality. On the contrary, the new technolo- gies have penetrated reality. They do not simply transform it, they create it, instigating not just molecular changes, possible molecular transformation, but above all creating a mental transformation. Think of the use that is normally made of teley  jon. This instrument of communication has got inside us, into  our brains It i modifying our very capacity 10 see, to understand reality. It is  ‘modifying relations in time and space. It is modifying the possibility to step out of ourselv  s and change reality. In fact, the vast majority of anarchists do not  think it possible to make use of this assemblage of modern technologies. Tknow that there s an ongoing debate about this. However,this debate  is based on a misunderstanding. That  . itis trying to treat two things that are radically different in the same way. The old revolutionary dream, let us say of ‘Spanish anarcho-syndicalism, was that of attacking and defeating power so that the working class could take over the instruments of production and use them in the future society in a way that was more just and free. Now it would be im- possible to make a fairer and more free use of these new technologies, because they do not stand passively before us like the old technologies of yesterday, but are dynamic. They move, penetrate decp inside us, have already penetrated us. I we do not hurry to attack, we will no longer be able to understand what we. need in order to do 5o, and rather than us taking the technologies over, it will be the technologies that take us over. It will not be a case of social revolution but of the technological revolution of capital. This is why a revolutionary use of these new technologies is impossible. The misconception s similar to the old one concerning the possible revolutionary use of war, which many well-known  fell prey to when the fist world war broke out. A revolutionary use of
2 Alfredo M. Bonanno  waris impossible, because waris always an instrument of death. A revolutionary use of the new technologi  is impossible, because the new technologies will always be instruments of death. So all that s left to do is to destroy them—to attack, now, not in the future, not when the project has been completed, not when those who are deceiving themselves stop doing so, but sabotage now, attack now. This is the conclusion we have reached. It is at the moment of the  destructive attack that one clarifies what we said to begin with. It  atthis point that theory conjoins with practice, and the analysis of post-industrial capitalism becomes an instrument with which to attack capitalism. It becomes an instru- ‘ment for insurrectionalist and revolutionary anarchism in order to direct one’s attention to what —the men and the things —makes this project of restructuring of Capitalism possible, and whose responsibilities are clear.  Today as never befre, striking at the root of nequality means attacking. that which makes the unequal distribution of knowledge possible dircctly. And that is because, for the first time, reality itself s knowledge, for the first time Capitalism is knowledge. Whereas the centres where knowledge was elaborated, the univer  ties, for example, were once cloistered places o be consulted at specific times of need, today they are at the centre of capitalist restructuring, the centre of repressive restructuring. So, a distribution of knowledge is possible. | insist on saying that this is an urgent problem, because it i possible to grasp any difference when one sees it. But when a net separation between two different Kinds of knowledge which have no communication between them occurs —the knowledge of the included and that of the excluded—it will be too late. Think of the project of lowering the quality of schooling. Think how mass schooling, once an instrument for gaining knowledge, has been transformed over the past twenty years into an instrument of disqualification. The level of knowledge has been lowered, whereas a restricted minority of privileged continue to acquire ather knowledge, in speciali  d masters degrees organised by Capital.  ‘This, in my opinion, demonstrates the need and urgency for attack yet again. Attack, yes. But not blind attack. Not desperate, illogical atack. Projectual, revolutionary attack, with eyes wide open in order to understand and to act. For example, the situations where capital exists, and is being realised in time and space, are not all the same. There are some contexts in which insurrection is more
The Insurrectional Project 2  advanced than others, yet there is sill a great possibility for mass struggles to take place internationally.Itisstill possible to intervene in intermediate struggles, thatis, in struggles that are circumscribed, even locally, with precise objectives that are bo from some specific problem. These should not be considered to be of secondary importance. Such kinds of struggle also disturb Capitalism’s universal project, and our intervention in them could be considered an element ofresistance, putting a brake on the fragmentation of the class structure. | know that many comrades here this evening have experienced such things, and have participated directly in specific struggles  So. we need to invent new instruments. These instruments must be capable of affecting the reality of the struggles without the mediation of trade union or party leadership. They must propose clear, even though limited, objec- tives, ones that are specific, not universal, so in themselves are not revolutionary. ‘We must point to specific abjectives because people need to feed their childrn. ‘We cannot expect everyone to sacrifice themselves in the name of universal anarchism. Limited objectives, then, where our presence as anarchists has the prcise task of urging people to struggle directly in their own interests because it is only through direet, autonomous struggle that these objectives can be reached. And once the aim has been reached the nucleus withers and disappears. The comrades then start again, under different conditions.  ‘What comrades are we talking about? What anarchists are we talking about? Many of us are anarchists, but how many of us are available for real concrete activity? How many of us here today stop short at the threshold of the issue and say: we are present in the struggle, we suggest our project, then the workers, the exploited, do what they like. Our task is done. We have put our conscience at rest. Basically, what is the task of the anarchist if it is not propa- ‘ganda? As anarchists, we have the solution to all social problems. So we present ourselves to the people who suffer the consequences of the problem, suggest our solution, and go home. No, this kind of anarchism is about to disappear out for ‘good. The last remaining mummies belong to history. Comrades must take the responsibiliy for struggles upon themselves dircctly and personally because the objective against which the exploited need to struggle in certain situations, and against which they ofien do not, is a common one because we are exploited just as they are. We are not privileged. We do not live in two different worlds. There
30 Alfredo M. Bonanno  is o serious reason as to why they (the so-called masses) should attack before. we do. Nor do I see any reason why we should only feel ourselves authorised to attack in their presence. The ideal, certainly, is mass struggle. But i the face ible and  decide to attack personally, directly, not wait for signs of mass struggle. Because  of the project of capitalist restructuring anarchists should feel respor  this might never happen. So this is where the destructive act takes place. Itis at this point that the circle closes. What are we waiting for?  So, individual acts of destruction too. But here an important objection has been raised: what does one gain by smashing a computer? Does that perhaps Solve the problem of technology? This question, an important one, was presented 10 us when we worked out the hypothesis of social sabotage. It was said: what resultis obtained by destroying a pylon? First ofall the question of sabotage is ot aimed so much at the terminal points of technology as at the communications network. So, we are back to the problem of knowledge of the way technology is distributed over the country, and, if you allow me to digress for a moment I want to point to a serious problem that arises here. I allow myself to use the term “serious problem’ because a comparison has been made between what a elandestine armed organisation thinks they are doing by striking a specific person, and what, instead, an anarchist insurrectionalist structur thinks it is doing by striking a technological realisation, maintaining that, al said and done, there is ot much difference. There i a difference, and it i a very important one. But it is not a question of the difference between people and things. It s an even more important difference, because the aims of the clandestine armed organisation contain the error of centrism. By striking the person, the organisation believes it is strking the centre of Capital. This kind of error is impossible in an anarchist insurrectionalist organisation, because when i  trikes a technological realisa- tion (or someone responsible for this realisation), it is fully aware that it is not striking any centre of Capitalism.  During the first half of the Eighties, huge mass struggles took place against nuclear power plants in Italy. One of the most important of these was the struggle against the missile base in Comiso. In this context we realised ‘base nuclei” For three years we struggled alongside the local people. This was a mass struggle, which for various reasons did not succeed in preventing the construc- tion of the base. But that is not the only kind of struggle we consider  s just
The Insurrectional Project 3  one of the possible ones we participate in as insurrectionalist anarchists, one of the many intermediary struggles possible.  In another direction, in the years that followed, over four hundred attacks took place against structures conneeted to the clectric power supply in  ialy. Sabotage agai  t coal-fired electric power stations, the destruction of high- voltage pylons, some of them huge ones that supplied a whole region. Some of these struggles transformed themselves into mass struggles: there was mass intervention in some of the projeets of sabotage, in others there was not. On a. dark night in the countryside, anonymous comrades would blow up a pylon. ‘These attacks were spread over the whole country, and in my opinion possessed two essential characteristics: they constituted an casily realisable attack against Capital, in that they did not use highly destructive technology and, secondly,  they are easily copied. Anyone can take a walk in the night. And then, it is also  healthy. So anarchists have not passively waited for the m  s to awaken, they have considered doing something themselves. In addition to the four hundred attacks we know about, one could guess that at least another four hundred could have taken place as the State conceals these actions because it is afraid of them. It would be impassible to control a capillary-style spreading of sabotage all over the country. No army in the world is capable of controlling such activity. As far s 1 know, not one comrade has been arrested in connection with the known four hundred attacks.  I would like to wind up here because I think I have been talking long enough. Our insurrectionalist choic is anarchist. As well as being let us say a characterological choice, a choice of the heart, it s also a choice of reason, a resultof analytical reflection. What we know about global capitalistrestructuring today tells us that there is no other way open to anarchists but that of immediate, destructive intervention. That s why we are insurrectionalists and are against all deology and chatter. That is why we are against any ideology of anarchism, andall chatter about anarchism. The ime for pub talk is over. The enemy is right  outside this great hall, visible forall to see. Itis simply a question of deciding to  attack it. | am certain that insurrectionalist anarchist comrades will know how 1o choose the timing and the means for doing so, because with the destruction of this enemy, comrades, it is possible to realise anarchy.
32 Alfredo M. Bonanno  ANARCHISTS AND HISTORY  What is your identity and that of anarchism?  Today, particularly following the collapse of actual socialism, wide perspectives are opening up for revolutionary anarchism. This should be intended both as an analyticalinstrument, a means for understanding reality, and as an organisational point of reference for people carrying out social struggles in everyday practice.  What is the position of the Italian anarchist movement in today s society?  “The ltalian sitvation s very different from the Greek, partly because laly has witnessed twenty years of authoritarian revolutionism, i.e., Marxist-Leninist armed groups. The failure of this authoritarian strategy, the aim of which was the conquest of power, has led people to think that all revolutionary struggle is in ltaly are faced with a very difficult task today, because on the one hand this problem needs to be clarified, and on the other itis  doomedto failure. So anarchi  necessary to explain o people what one means by revolutionary struggle, which  for anarchists is the destruction of power. And they cannot limit themselves to  explaining all this merely in words. It also needs to be done by means of the conerete practice of social struggles, something that s still to happen.  What image do Halian people have of anarchists?  ‘When Italian society has an image of anarchism and anarchists 1 say when it has, because often they do not even know what anarchists are—it is either an image that dates back about 100 years or one supplied by the media. Media im- ages often confuse anarchists, autonomists and other marginal components of society such as the lumpen-proletariat in revol, even to the point of sometimes calling hooligans anarchists.  This happens in spite of the fact that the anarchist movement has a long history in Italy?
The Insurrectional Project 33  It is also due to a certain incapacity on the part of anarchists themselves. But it  should be said that it is not easy to destroy an opinion that television constructs in a day, in one single programme. You must understand that the historical in- heritance of the Italian anarchist movement is hardly known, as it is confined 1o the anarchist minority and academic study. The information that most peaple receive s limited to the mass media. Due to such conditions, which are the same  in Greece,  not possible to modify the situation from one day to the next, a lot of work is required here.  Is ause of the media considered 0 be partof the insurrectional project?  ‘This is a very important question, and demonstrates the radical difference between two revolutionary strategies. On the one hand the authoritarian one, that of the old Marxists whose aim was to realise spectacular actions —the case which caused the greatest str being the Moro kidnapping—using the media and, through this instrument of sensationalism, make mass propaganda. According do possible to use the media. A limited, subtle dialogue can only be  to insurrectionalist anarchists this s definitely a losing strategy. Anarchis not think i  held ata theoretical level, as we are doing novw. It cannot exist at a practical level during social struggles, because then, more than at any other time, the media ‘merely carry out the role of supporting the enemy. Insurrectionalist anarchists do not believe it is possible for objective, neutral information to exist.  Bt are all people prey to the media? Could these means of information not play an important role in making anarchists better known?  I don’t believe anything is absolute. In revolutionary activity choices are made that naturally have both positive and negative aspects. When they find them- selves in social struggles, insurrectionalist anarchists have chosen to refuse this ‘means of communication. OF course that has its price in terms of transmission of the image, but I think that there are more important issues involved such as Keeping the media away from the social struggle, although that does not prevent them from carrying out their job of mystification. But here it is a question of
34 Alfredo M. Bonanno  revolutionary responsibility, and in Italy more than a few journalists have been attacked personally as a result. So, there is nothing absolute about making such judgements, only practical choices to be made.  It has been argued that Europe is presently moving through a cultural Middle Ages. What is your opinion on this?  “This is a complex question, which in order to answer requires at least a couple of words of introduction of a cultural nature. The very concept of a “cultural Middle Ages” shows the limitations of certain information. The Middle Ages is seen negatively, as the “dark ages”, which was not the case. The erisis of ideology has also led to a crisis in the idea of progress, upon which the Mar  st analysis. in particular was based. It s sufficient to think of Lukacs and his theory that reality s proceeding in a determinist and historicist way towards a better future. In the past this ideological concept was also shared by various anarchists, and it was in error. Reality is not moving in a progressive dircction, and the condi- tions of barbarity are always present. There s not one thing in history that can ‘guarantee otherwise. We cannot look at any specific period and say: barbarity is over, fascism i finished with for good. We live with fascism, we can sce this. better thanks to the crisis in ideology that has opened our eyes a little, but only alittle. So, as far as this question s concerned I am of the opinion that we find ourselves, not in the Middle Ages, because the Middle Ages were not barbarian, butin a situation where barbarity is currently possible. So, no, I don’t agree with the idea that we are going through a historical period similar o the Middle Agy  ‘We are constantly living in a condition of possible barbarity, but also of possible  freedom. It s up 10 us to choose which road we want 1o take, and this is the aim  of revolutionary activity: understanding which road is the road to freedom, and finding the means 1o take it.  Concerning the crisis in ideology and the position of Fukuyama re the end of history, the end of ideas—have we reached the end of history or do we have any ideas that are capable of giving us information? And ifso, what do we then mean by the concept “the end of history”
The Insurrectional Project 3s  ‘Thatis a very articulate question. We need to determine what we mean by history. Notby chance s there a rlationship between neo-liberalism and history, because the old liberalism was historicist, that s, it supported the ideology of history: That kind of history  finished. No matter what the philosophers say, the crisis in the idea of progrss concerned a single line proceeding forward through reality and.  time, necessarily leads to a crisis in the ideology of history, not merely a crisis of history. So, it is not just a matter of a cisis in ideas, because the new liberalism is affaid of a future lack of social control and is circulating the fear of ‘the end. ofhistory” at the level of public opinion, Their aim is to limit people through an ideology of history which, like any ideology, is an instrument of control. So, we. have not reached any end historically at al. The fact that we are reaching the end of the millennium just increases the confusion. A neo-millenarianism is being  putinto circulation for irational reasons. This  avery dangerous social terrain where we can see a development of all the religious integralisms, including the Christian version, in the name of an abstract need to save man. So, it is not a question of “the end of history”, but rather of the end of historicism which, like any new ideology of world domination does not know what to do yet. It realises  that it does not yet have the ideally adapted theoretical instruments necessary, whereas academia, i.¢. the world—Japanese and American—university has nothing better to do than produce amenitics of this kind.  Does history have a cyclical or a linear pattern?  “This is also a difficult question. But are all your readers philosophers? I do not know how much depth analysis could be useful, however I will start by estab- lishing that we cannot separate the idea of history from the idea of progress.  ‘The ides of progress comes from the revolutionary bourgeoisie who lent them- selives to the conquest of power. We need to understand that the idea of progress is an idea of power, of the management of power. Now, the idea of progress. requires a linear conception of history, something that was expressed very well by Marx. He thought that the revolutionary clash between the bourgeaisic and the proletariat would necessarily end up with the victory of the proletariat, because the latter were destined to realise history. In this he applied the idea of his philosophical mentor, Hegel, who said that the objective idea of the world
36 Alfredo M. Bonanno  would realise philosophy and would render it useless, so people would no longer need to think. And we have seen how the State did think in place of people in the countries of actual socialism. And these apparently innocent philosophical ideas stilllurk amongst small university groups and are discussed by very seri- ous people, savants worried about people’s destiny. Then they come out of the universities, move about in reality and contribute to building the concentration ‘camps, determining full-scale massacres, historical tragedies of vast proportions, wars and genocide.  Now, having established this we can return to the problem of the linear concept of history. What do anarchists put in i  place? They suggest inverting Marx’s sentiment, that the sleep of reason breeds monsters. On the conirary, anarchists maintain that it is in fact reason that breeds monsters. That is to say the reason of the philosophers, the politicians, the programmers of power, do-  ‘minion, and also of historical ideology. So, as long s it is possible to build States and support exploitation, war and social death, a concept of linear history will be possible. When all that changes, or begins to change, we will finally realise that there is no such thing as lincar history but that, according to the intuition of your ancient Greek philosophers (who remain unchallenged today), reality is of a circular movement wherein the barbarity of the past can present itself at any time. In this circular movement nothing s ever old or new, but rather everything is always different—which does not mean that it is more, or less, progressive. That is why it is necessary to begin again cach time, identify the enemy, the class enemy, the social enemy, power, and attack t, always with new  ‘means. Itis something of the work of Sisyphus, and anarchists have this quality of Sisyphus, of always starting at the beginning again, because, like him, they never give up. And with this moral strength of theirs they are superior to the  gods. just like Sisyphus.  What do you think of the reappearance of nationalism?  ‘There is not only a reappearance of nationalism, but  reappearance of the most ferocious barbarity of the past. For instance, atleast according to what the news- papers report, twenty thousand women have been raped in Bosnia. But not in the same way as with all the other armi  i the world, because rape is a normal
The Insurrectional Project 37  practice of any army, but rather as a deliberate means of fathering Serbians, i.c. asakind of genetic programming. Such an idea really goes back to the beginning of time and confronts us with tragic considerations. For example, it could be that we (including anarchists) made a mistake concerning man’s original goodness and the notion that it was society that made him become bad. We will probably all have to reconsider these concepts. We need to become more intellectually acute, and not be amazed cach time these events re-oceur in istory, and stop placing our hopes in peoples” goodness. Nationalism rises up again because it exists in each one of s, because racism is inside every one of us. The fear of the black man is inside us, in those obscure regions that we are affaid to pen- etrate, where there is the fear of the different, the foreigner, the Aids sufferer, the homosexual. These fears exist inside all of us, anarchists included, and we need to talk about them, not hide them under ideology, under great words such as revolution, insurrection, freedom. Because all these beautiful words, if they are developed and brought about in reality by men who are afraid of the dif- ferent, run the risk of becoming the instruments of the power of the future, not instruments of liberation.  What do the American ghetto riots such as the one in Los Angeles signif?  ‘The collapse of actual socialism has brought the apparent universal domination of the Americans to the fore. I say apparent because it is not just the Americans. 1 we make the mistake, as [ seem to see being made during the course of these. talks in various towns in Greece over the past few days, of aiming all our erifi- cism at the Americans, we will not be able to understand the general character of the new imperialism. Yes, we have American domination, but also that of the European Community and the Japanese economic colossus. But this riumvirate. is different to the power structures of the past. They do not relate to each other in terms of the competition that existed before the collapse of the Soviet empire, but share economic relations of imperialist administration, that s, the construction and maintenance of world domination.  For example, the situation in the former Yugoslavia is only compre- hensible through an analysis of the new world imperialism-—not only Yankee, but also European. Just think, west Germany has planned to invest thousands
38 Alfredo M. Bonanno  of billions of marks over the next ten years to raise cast Germany to the level of western consumerism. And that concerns just 17 million people. Now, if such a project were 1o be made for the whole of the East, from Russia to the former  Yugoslavia, an impossible sum would be required. No world power i existence  is capable of bringing about such an operation, and world imperialism is aware of this  ‘What s the solution then? War. That s why there is no American inter- vention in the former Yugoslavia, because a ferocious, destructive war such as the one now taking place will throw the Serbian, Croatian, and Bosnian peaple into conditions of such acute poverty that even the slightest intervention, any. tiny act of humanitarian aid, will be seen as something positive. Think of such a situation existing without the war. Combative peoples at the gates of Eastern Europe, on the border with Greece. Combative peoples in extreme poverty, with a great capacity for revolutionary social action: what a danger for the European Community! Unfortunately I believe the use of war as an instrument of imperialist ‘management could well be extended, and other examples of this can be seen.  ‘The question of the riots within the American empire is quite differen. ‘We must bear in mind that it is not just a question of America, because similar events have also taken place in other countries. More than ten years ago there were riots in Brixton. Then in Switzerland, there was the revolt in Zurich, and in Germany, in Hamburg. Under the conditions of advanced capitalism and prcisely due to the process of expulsion of the old proletariat from the factory, there s an increasingly wide strata of new poor who have nothing to lose, and who constitute a threat that is ready to explode at any moment.  T should be said however that the significance of these explosions should not be overestimated. It is true that anarchists have always been in favour of such revolts. Whenever possible, they have participated in them, anywhere—in Society orin prison, and always on the side of the weakest. But today they must avoid the theoretical isk of puting the social rebels of the fture in the place of the worker centrality of yesterday. Society is a complex problem, which has nothing in its centre. There s not one small part of saciety that is capable of realising the revolution, not even the Los Angeles rioters. Even if we sympathise with them, even if we are alongside them. But we must adit that they are just one clement, a sort of involuntary anticipation of possible fture mass insurrec-
The Insurrectional Project 39  tions, not the main element. And this needs to be said clearly, against all those who deliberately accuse us of forgetting the roles of the other social srata.  What relationship is there between the recent scandals in ltaly and Greece, and the new management of power?  ‘The problem of the ltalian and Greck scandals is important, and it is no coinci- dence that these have come to lightat the present time, because they correspond to profound changes in the management of power. The new global capitalism,  more obvious in some places than others—for example it is more evident in the United States, less o in Greece—needs a political managerial class, not one characterised by ideological agreement, but one technically suited to the ‘managerial needs of global imperialism.  For example, a management of power similar to that of the ex-USSR, o a kind of national socialism, would of necessity have had recourse to mass arrests, mass exceutions, and would have resolved the problem of a revolt in a few days. A democratic management must use other means. Replacing the head of government s a difficult thing to do, and scandals are an excellent means of achieving the replacement of the old social leadership by the new technocratic  Can you tell us anything about the Gladio in Iialy?  As Machiavelli once wrote, anything s legitimate in the political arena. In Italy the Gladio scandal is the Christian Democrats” esponse to the denunciation of their clandestine activity afier the war, which cameto lightn the Soviet archives years later. Yes, I said it was the Christian Democrats’ response... Contrary to what i belicved, it was not the Communist Party that denounced the armed ac- tivity of the USA and the Christian Democrats. It was the Christian Democrats themselves who justified their activities in terms of the defence of capitalist ideals, in a desperate attempt to save the old political leadership by building a “revolutionary’ purity to show that people who had taken up arms in the past  should not be made to pay by Capital. Contrary to the logic of other cconomic
a0 Alfredo M. Bonanno  scandals, the Gladio s an exercise in inverse logic. Whereas the economic scan- dals are aimed at destroying the old leadership, the Gladio operation tried to save it. Nevertheless this proved impossible, because the needs of world imperialism  are greater, and end up by taking over.  Ina Greek anarchist paper of 1896 there is an interesting artcle on ecology: What do you think about the fact that today Capital tself uses ecology as a means of restructuring?  First we need to put this into context, given that you’ve made reference to a paper from the nincteenth century. Anarchism is not a political movement and never has been. It is a social movement, a carrier of social ideas, and so has always, right from its birth, dealt with the entirety of social problems. If one looks at anarchist papers of the last century, one can find not only the question of ecology addressed but also any other problem that concerns man. The anarchists were the first 1o talk about free love, eroticism, homosexuality, about all the aspects that concern daily life. Thi  one of the strengths of anarchism, and has led to the anarchist movement being considered, today as in the past,a great reservoir ofideas into which everyone can dip, and from which Capital tself has derived many concepts. But anarchists are aware of this. They have always put their ideas at the disposal of others, because, as Proudhon said, the worst kind of property is intellectual property. Anarchists have never ben affaid that Capital ‘might steal their ideas, because they have always known that they are capable of moving beyond them. So, if at the end of the last century anarchists were  ecologists in a particular way, in that they were the only ones to be ccologists,  now that Power has *become ecologically-minded” and ccology has become a leading industry, anarchists are no longer ecologists the same as before. They o longer say that it is necessary to save nature, but rather that in order to save nature it is necessary to destroy both those who are polluting it, and those who want to save it using State means.
The Insurrectional Project a1  How do you see yourself?  ‘That is a question that I was asked before many years ago now here in Greece, in a very different political situation. The physical conditions were also very different then. At the time I replied: a comrade among comrades. Now that I am older my reply i the same: a comrade among comrades.

Anti-copyright 2006 - please reproduce and appropriate at wil This book can be downloaded as a PDF fle from [ wvani-politcs.net |


THE
INSURRECTIONAL
PROJECT

Alfredo M. Bonanno

Translated from Talian by Jean Weir
in collaboration with John Moore and Leigh Stracross

Elephant Editions- London - 2000
KKA Publications- San Francisco, CA - 2001
Quiver Distro- Santa Cruz, CA - 2006
The Insurrectional Project 3

PREFACE

If we refuse to let our lives be organised by others we must have the
capacity to organise ourselves, that s, we must be able o *put together the
elements necessary to act as a coherent functioning whole’. For anarchists,
individuals who ardently desire the climination of every trace of tyranny and
domestication, this has been experimented in a myriad of forms according to
prevailing social and economic conditions, and marked by each one’s particular
concept of wholeness. If this could once be interpreted—t

some-—to mean a

big organisation to oppose big industry, today social disintegration and uncer-
tainty have gone further than any eritique i relegating such undertakings to the
pages of history. We are left with the exquisite dilemma: if my freedom depends
on the freedom of all does not the freedom of all depend on my acting to free
‘myself? And ifall the exploited are not acting to free themselves —as a tangible
composite whole—how can | function, i.¢. organise myself to destroy the real-
ity that oppresses me without delay? In other words, how can I act as a whole.
that secks to expand and enhance itself to infinity? Having refused the sop of
participation, voluntary work and progressive change with which the democratic
ideology seeks to satiate its bloated subjects, 1 am left with myself and my un-
‘mediated strength. I seek my accomplices: two or three, hundreds or hundreds
of thousands, to upset and attack the present social order right now—in the tiny
act that gives immediate joy, indicating that sabotage is possible for everyone;
or in great moments of mass destruction where creativity and anger combine
in unpredictable collusion. I am therefore faced with the problem of creating a
project whose immediate aim is destruction, which in turm creates space for the

What holds things together and puts my actions in context cannot
therefore be a fixed formal organisation, but the development of the capacity
to onganise myself, alone and with others, where numbers are not an aim, but
are always potentially present. In other words, I must create an insurrectional
project which already contains all the clements of a revolutionary perspective: the
decision to act now: analysis of the present time taking account of the profound
transformations capital is undergoing globally and which have had an effect on
Alfredo M. Bonanno

the whole concept of struggle; choice of objectives, means, ideas, desires; the
‘means of making these known to others in my search for affiity; the creation
of occasions for confrontation and debate, and much more besides. Projectuality
becomes force inmovement, a propelling element within the whole insurrectional
flux,

The following texts come to us from a series of meetings that took
place in Greece some years ago. A sub-heading of one of the sections has since
reached notoreity after being chosen by the ltalian carabinieri in 1996 to name
the phantom armed organisation they subsequently accused dozens of anarchists
of belonging to. This should not divert us from our understanding of the tex,
which could be seen as starting point, an invitation to consider and experiment
in the insurrectional adventure.

Jean Weir
The Insurrectional Project 5

INTRODUCTION

In January 1993 I was invited to Greece along with another comrade
10 hold a number of talks at the Athens Polytechnic and the Law Faculty of
Salonika.

“The texts published here are: an outline of the talks I intended to give.
a transeription of the tapes of the Salonika conference and a transcription of an
interview with the Athens daily Elefiherotipia. As the first of these texts was.
intended to be a guide to the conferences, I worked it out in detail along with the
Greek comrades in time for it to be translated and handed out to those present.
“This was necessary due to the difficulties of on the spot interpretation.

1 published the texts in May 1993 in number 72 of Anarchismo, with
the ttle ‘Recent Developments in Capitalisny”.

The three picces have a homogeneity that still makes them worth
publishing together, as they all concern capitalistrestructuring and the forms of
insurrectionalist struggle that anarchists ar proposing against it

A curious thing happened. The penultimate section of the fist picce

published here isstill entitled ‘Revolutionary anarchist insurrectionalist organi-
sation”. The origin of this now infamous heading is rather strange and deserves
comment. In fact | had originally entitied the subsection “Informal anarchist
insurrectionalist organisation’, but we came up against difficulties when trying
1o translate the term ‘informal”. It was impossible to solve them before my ar-
sival in Greece, so the comrades suggested replacing the term “informal” with
the more generic one, ‘revolutionary.

forgot o restore the word ‘informal when published the textin Ialy,
although it is nearer to what I am talking about n that particular section.

1do not feel I can make such a correction now given all the nonsense
that the specialists of the Attomey Generals office in the courts of Rome, led
by Public Prosecutor Marini, have come out with

think it might be useful to give a brief description of the way the minds
of the ltalian judiciary and Carabinieri have laboured on this text.

On September 17, 1997, dozens of anarchists were arrested in ltaly on
charges of kidnapping, robbery, murder, pos

sion of arms, etc., initiating what
5 Alfredo M. Bonanno

came to be known as the Marini Frame-up’. These separate charges were trans-
formed into one combined charge, .. that of belonging to a clandestine armed
organisation entitled the ORAL The name had been taken from the paragraph
‘mentioned above: Revolutionary anarchist insurrectionalist organisation.

‘This trial is sill going on, and could drag on for years to come given
the various legal stages which make up the process. We were freed from prison
fourteen months after being arrested thanks to a simple procedural error: the
Attorney’s Office genius in Rome had been so busy trying to justify a phantom
“armed gang’ that they forgot to follow their own rules. The resultis that although
still facing charges that carry life imprisonment those who, like myself,

id not
have sentences pending are now all at liberty.
As the enthralled reader will discover, the following texts contain o

theory relative to a specific armed organisation, but are an examination of the

insurrectionalist method of organising. This is based on affinity groups com-
posed of anarchists, the elaboration of a common revolutionary project, their
linking together in an informal organisation, the constitution of base nuclei in a

situation of mass

struggle and, finally, the way these structures could be linked
together.

1 realise that for the obtuse mentality of a Carabinieri educated to
sceing the enemy as a negative copy of himself and his organisation, nothing
under the sun could exist thatis not equipped with an organisation chart leaders,
strategies and objectives. And up to this point I can even understand a tenden-
tious reading of the text in question. But what I cannot understand, and what no
reader will surely be able to cither,is how such a text came to be given the task

of constituting the foundations of a clandestine armed organisation. This is sill

simmering away in the mind of the Public Prosecutor, who will stop at nothing
1o demonstrate our guilt

Stop at nothing. Precisely, even to the point of denying all the evidence.
1o the contrary. And in fact, as appears from the trial documents and even from
the succinct phrasing of the arrest warrants, they must have had a few doubts
on the subject. However, these were evidently cast aside due 10 the greater
precedence of their need to justify the unjustifisble: If it is true that Bonanno
is theorising a specific armed clandestine organisation (ORAI) in this picce
(‘Recent Developments in Capitalism’), then we, the Prosecution and Carab-
The Insurrectional Project

inieri, declare that he cannot have gone to Greece to talk about it publicl

university auditorium. That would be illogical. And as the text in question must
‘mean what we, Prosecution and Carabinieri, say it means, then we must conclude
that Bonanno did not go to Greece, did not give these conferences, and did not
write this text as an outline and memorandum for what he was about to say in
public... A logical conclusion! Only it ignores one thing: that in both Athens
and Salonika hundreds of people were present at these conferences. There are
tape recordings not just of the conferences but of the whole debate. Both the
conferences and the Salonika debate have been transcribed and presented in a
book published in Greece. And, finally, there are even photographs published
along with my interview (the third of the pieces published here) on February 25
1993 in the Athens daily Elefiherotipia.

But why do the prosecution want to read something —the theorisation
of an inesxistent armed band complete with name —into this text, even at the
risk of making themselves ridiculous? There is a simple answer: because they
would not otherwise be able to sentence dozens of anarchists for conspiracy—a
conspiracy that clearly does not exist. It would then remain for them only to
prove individual charges which would have to be dealt with separately, accord-
ing to the rules of the penal code, ctc.

‘The aceusers know perfectly well that the second alternative would
not be casy for them. They are well aware that most of the charges arc based on
the spurious aceusations of a young girl bribed by them, that s why they are so
persistent in wanting to read something that is not there into this fext.

In fact, the concept of informal organisation proposed in the text in
question does not in any way resemble that of an armed clandestine organisa-
tion. We are in two different worlds. The closed organisation (necessarily so if
we are talking of clandestiniy), is an instrument like any other, and in certain
conditions of the class clash it might even be useful as defensive or offensive
‘means fone finds oneselfin dire straits. The economic and social structure would
have to change profoundly in order for it to become useful as a means today.
Capital would have to turn back on its steps to the conditions of production that
existed in the Eighties when there was a strong, centralised working class and a
fixed transmission belt of left wing unions and parties —all things which clearly
1o longer exist. The closed organisational model, which only indirectly wants
5 Alfredo M. Bonanno

the struggle to generalise and does nothing in that direction other than make
its actions known through the media—and we know how hat functions —cor-
responds in many respects to the ideological conditions that sum up the union
and the party. If we refuse to be likened to poli

al partics, we must also refuse
to be compared to organisations whose aim is numerical growth, increasing the
‘number of is actions and setting tself up as the mainstay of the class struggle.

Of course, if anarchists were to get involved in constituting a specific.
closed organisation, they would do it in quite a different way to the classic
sclerotic one of the Marxist-Leninists. And there is no doubt that, in its time,
Azione Rivoluzionaria was an attempt in that direction. But it soon moved away
from

and closed itself up in the logic of recruiting and joining arms with the other

initial tragectory in the direction of a generalisation of the struggle,

combatant organisations on the scene at the time. I am not saying that they did
not make any interesting proposals, especially in their early documents. What |
‘am saying is that, not only did these proposals not stand up to criticism but by
withdrawing

o position of defence they ended up anniilating themselves by
becoming more and more clandestine, that's all. The best comrades, it was said
atthe time, are those in prison. One simply had to end up in prison to become a
better comrade.

“The problem is simple. When we work out an analysis we cannot put
our own personal positions aside. These inevitably come to permeate the analysis
without our meaning it to. And when the latter is written in prison, it is obvious
that that is where it has come from. Morcover, when a comrade sces his imme-
diate reality to be radically compromised he conveys this in the analyses he is
working on, as well as in the kind of intervention and methods he proposes. By
imprisoning himself in the stifling viewpoint of a clandestine organisation his.
way of thinking becomes clandestine even to himself, almost without realizing
it

1t has been said that if one were to find oneself in a pre-revolutionary
phase (although no one could explain how we were to recognise this phase), the
only road possible would be that of the more or less closed armed organisation.
It was later scen that all attempts at “being different” simply ended up aborting.
themselves in the classic condition of closure. It does not oceur to anyone today
that we are in a pre-revolutionary phase, s if we were to accept the idea of a
The Insurrectional Project 9

specific armed organisation it would simply be a question of our own personal
decision, nothing more. A choice like any other. And I say that with no expecta-
tions concerning the accusations in the trial in Rome.

‘At this point I could quote something I wrote years ago, in an article
in 1979 t0 be exact—enitled “On Clandestine Or-

published in Anarchismo-
ganisation”, which is also available in my book The Illogical Revolution (pages
88-90), but it seems pointless to me. While many might simply have forgotten
these words from the past, I myself do not know what to do with them. 1 do
ot even want to read them again, because they belong to a period that s quite
different to the present. As far as [ can remember, they referred to the fact that
the critique of the closed clandestine organisation is not simply an affirmation
of individualism. Cri

ism docs not have a weakening cffect, it strengthens.
But something strange occurs when those under criticism are comrades who
participate in, or support, a closed form of organisation, even in theory. The
eritique is taken as a personal attack or something aimed at weakening one’s
conditions. And when you are faced with a comrade with years of prison hang-
ing over them, you run the risk of being lynched. I do not think that the concept
of the generalisation of the struggle, including armed struggle, is the refusal of
organisation. Nor do I think that to criticise the closed clandestine organisation
means to ‘expose oneself to massacre’. Such generalisations do not interest

‘The informal organisation of afinity groups and the consequent devel-
opment of base nuclei in specific mass struggles, are the organisational forms
1 consider most useful today for the generalisation of the struggle, armed or
otherwise.

Alfvedo M. Bonanno
Catania, 10 October 1998
0 Alfredo M. Bonanno

RECENT DEVELOPMENTS
IN CAPITALISM

From the late Seventies until the carly Eighties, industry in the leading
capitalist countries was in crisis. The relationship between plant and productiv-
ity had never been worse. Struggles led by the trades unions, as well as those
of the proletariat in general (especially in their more violent manifestations
under the leadership of the various revolutionary working class structures),
had led to a rise in labour costs quite out of proportion to capital’s income.
Incapable of adjusting, lacking the strength to reduce labour and employment
costs drastically, it seemed as though the whole system wa

moving towards
its natural collapse.

But by the first half of the Eighties rapid change had set in, with in-
dustrial restructuring taking an electronic direction. The primary and secondary
productive sectors (industry and agriculture) were in decline, with consequent
reductions in employment. The tertiary (services) scctor had expanded out of
all proportion, absorbing some of the laid-off work force, thus attenuating the
social backlash that the capitalists had feared more than anything else.

In short, the much-feared riots and revolutions did not take place. There
was no intolerable pressure from the reserve amy of the proletariat. Instead,
everything quietly adapted to changes in the structures of production.

Heavy industry replaced old plans with robotised ones capable of
reaching hitherto undreamed of levels of lexi

lity and low levels of investment.
Labour costs deereased without this leading to any fall in demand because the
services sector held well, assuring levels of income that were sufficient o inflate
the capitalist system as a whole. Most of the sacked workers managed to find
some way of getting by in the new flexible and permi

ive capitalist world

The new productive and democratic mentality

None of this would have been possible without the emergence of anew.
flexible mentality at the work place: a reduction in the need for professional
qualifications and an increase in the demand for small, auxiliary jobs. This
coincided with a consolidation of the democratic mentality.
The Insurrectional Project 1

The middle classes” myths of carcers and improvements in workers’
wages disappeared for good. All this was possible thanks to articulated inter-
ventions at every level: a) In the schools, in the adoption of less rigid teaching
‘methods better suited to building a ‘malleable” personality in young people.
“This was to enable them to adapt o an uncertain fture of the kind that would
have filled their parents with horror; b) In the political management of the most
advanced capitalist countries. Authoritarianism gave way 1o democratisation,
involving people in ficttious electoral and referenda procedures; ¢) In produc-
tion where, as we have said, the disappearance of professional qualifications has
‘made producers tame and flexible.

‘This ll took place according to the spirit of the times. Dreams of philo-
sophical and scientific certainty gave way to a ‘weak” model, based not on risk
and courage but on adjustment in the short-term, on the principle that nothing
is certain but anything can be fixed.

As well as contributing to the disappearance of the old and in many
aspects out-of-date, authoritarianism, the democratic mentality also led to a ten-
dency to compromise at every level. This resulted in a moral degradation where
the dignity of the oppressed was exchanged for a guaranteed but uncomfortable
survival. Struggles receded and weakened.

Obstacles faced by the insurrectional struggle against post-industrial capital-
ism and the State

‘Undoubedly one obstacle to be faced i precisely this amorphous, flex-
ible mentality outlined bove. This cannot be compared to the old-style reliance
on social security;

simplya desire o find a niche in which to survive, work as
little as possible, accept all the rules of the system and disdain ideals and projects,
dreams and utopias. The laboratories of capital have done an exemplary job in
this sense. School, factory, culture and sport have united to produce individuals
who are domesticated in every respect, incapable of suffering or knowing their
enemies, unable to dream, desire, struggle or act to transform reality

Another obstacle, which is related to the irst,consists of pushing pro-
duction to the margins of the post-industrial complex as a whole. The dismem-
bering of the class of producers is no longer a nebulous project, it has become a
reality. And the division into numerous small sectors which often work against
2 Alfredo M. Bonanno

ach other is increasing this marginalisation.
This i

as workers” parties and trades unions, obsolete. Recent years have witnessed a

fast making the traditional structures of worker resistance, such

progressive disappearance of the old-style trade-unionism, including that which
once aspired to revolution and self-management. But, more importantly, we have
witnessed the collapse of the communism which claimed to have builta socialist
State—realised through police control and ideological repression.

It cannot be said that any organisational strategy capable of responding
1o the new conditions of capitalist productive and social reality in general has
emerged.

Developments that might have arisen from proposals made by
insurrectionalist anarchists, especially those moving in the direction of informal
relations between individuals and groups based on affinity, have not yet been
fully taken on board. They have often received a tepid welcome by comrades
due to a certain, in some ways understandable, reluctance to abandon the old
ways of thinking and apply new methods of organisation.

‘W will say something about this further on as it s central to the struggle
against the new structures of repression and total control produced by Capital
and the State.

Restructuring technology

‘The present technological revolution based on information technology.
lasers, the atom, subatomic particles, new materials such as optic fibres which
allow energy transportation and consumption at speeds and over distances once
unthinkable, genetic modification conceming not only agriculture and animals
but also man, etc., has not stopped at changing the world. It has done more. It
has produced conditions that make it seem impossible to plan or make plans for
the foreseeable future, not only s far as those who intend to maintain the present
state of affairs are concerned, but also by those who intend to destroy them.

“The main reason for this s that the new technologics, which are now
interacting and becoming part of the context that has been developing over at
least the past 2,000 years, could produce unpredictable results. And some of
these results could be totally destructive, far beyond the devastating effects of
an atomic explosion,
The Insurrectional Project 13

Hence the need for a project aimed at the destruction of technology as
a whole in its first, essential phase, and which bases all its political and social
approaches on this imperative.

Political, economic and military restructuring
Profound changes are also taking place in the cconomic sector. These

changes are affecting the political situation in advanced capitalist countries, with

consequent effects on the military sector.

New frontiers in post-industrial capitalism are emerging from wide-
spread processes and re-arrangements that are continually in flux. The static
concept of production tied to heavy machinery in huge factories capable of
producing a multiplicity of consumer goods has been surpassed by the ingenious
idea of swift change and increasing competition in specialised production with
stylish, individual, personalised products. The post-industrial product does not
require skilled labour but s set up on the production line directly, simply by
reprogramming the robots to produce it. This has meant incredible reduction in
storage and distribution costs and climinated obsolescence and stockpiling of
unsold products.

“This development ereated great new possibilites for capital around the.
beginning of the Eighties, and by the end of the decade it had become the norm.
So the political situation had to change to correspond with the new economic

This explains the considerable changes that took place at the end of
the cighties and the beginning of the ninetics. There has been a move towards
careful selection of the managerial strata, which must be able 10 see 0 the require-
‘ments of this new form of production. That explains why advanced industrial
countries such as the US and Great Britain went through a period of increased
authoritarianism in government, then moved on to amore versatile, flexible form

of political management corresponding to the economic necessities of various

countries which are now all coordinated globally.

The collapse of actual socialism and the rebirth of various forms of national-

Any advance from the countries of actual socialism beyond cautious,
14 Alfredo M. Bonanno

reciprocal suspicion was unthinkable in the old capitalist reality. But the birth
of the new computerised, automated capitalism has not only made advances
possible but has forced these counties to change radically, pushing them to an
irreversible as it was indecent collapse.

Rigid authoritarian regimes based on ideological calembours such as
proletarian internationalism and the like are finding it difficult to comply with
the needs imposed by a production structure that is now coordinated globally.

Ifthey do not want to get stuck in a precarious, marginal situation, the
few remaining authoritarian regimes will have to resolutely democratise their
political management. Inflexibility forces the great international partners of
industrial development to stiffen and declare war one way or the other.

Itisin g

sense that the role of the army has also changed consider-
ably. It has intensified internal repression, and at the same time taken on the
role of global policeman that was first developed by the US. This will probably
continue for a number of years unil other erises interrupt and require new yet
equally precarious and dangerous forms of equilibrium.

Accordingly, the resurgence of nationalism is bringing with it one posi-
tive albeit limited element, and one that is extremely dangerous. Its immediate
and specific effect consists in the overturning and dismemberment of the big
States. Any movement that goes in this dircction is to be hailed as positive, even
if on the surface it presents itself as being a carrier of traditional, conservative.
values

‘The other factor, the one thatis extremely dangerous, s the risk of wars

spreading between the small States, declared and fought with unprecedented
ferocity and causing tremendous suffering in the name of miserable principles
and just as miserable alternatives.

Many of these wars will lead to a more efficient and structured form
of post-industrial capitalism. Many will be controlled and piloted by the mult-
national giants themselves. But basically they represent a transitory condition,
a kind of epileptic fit, following which social conditions could evolve in the
dircetion of the climination of any trace of the old State organisms.

At the moment we can only guess how this might happen, starting off
from an examination of conditions today.
The Insurrectional Project is

Possible developments of the insurrectional mass struggle in the direction of
anarchist communism

‘The end of the great trades union organisations’ function of resistance and.
defence —corresponding with the collapse of the working class —has allowed us
t0'see another possibilty for the organisation of the struggle. This could start from
the real capacity of the excluded, i.¢., of the great mass of exploited, producers
‘and non-producers, who already find themselves beyond the area of guaranteed
wages, or who will in the near future,

“The proposal of a kind of intervention based on affinity groups and their
coordination and aimed at creating the best conditions for mass insurrection often
comes up against a brick wall even amongst the comrades who are interested
in it. Many consider it o be out of date, valid at the end of the last century but
decidedly out of fashion today. And that would be the case had the conditions
of production, in particular the structure of the factory, stayed as they were a
hundred and fifty years ago. The insurrectionalist project would undoubtedly
be inappropriate were such structures and ther corresponding organisations for
trade union resistance stilin existence. But these no longer exist, and the mental-
ity that went with them has also disappeared. This mentality could be summed
up by respect for one’s job, taking a pride in one’s work, having a career. This,
along with the sense of belonging to a producer’s group in which to associate
and resist and form trade union links which could even become the means for
addressing more problematic forms of struggle such as sabotage, anti-fascist
activity and so on, are all things of the pas.

Al these conditions have disappeared for good. Everything has changed

radically. What we could call the factory mentality has ceased to exist.

‘The trade union has become a gymnasium for carceri

s and politicians.
‘Wage bargaining has become a filer for facilitating the adaptation of the cost
of labour to the new structures of capital. Disintegration s extending rapidly
beyond the factory to the whole social fabric, breaking bonds of solidarity and

all significant human relationships, turning people into faceless strangers, au-
tomata immersed in the unliveable confusion of the big cities or in the deathly
silence of the provinces. Real interests have been substituted by virtual images
ereated for the purpose of guarantecing the minimum cohesion necessary to hold

the social mechanism as a whole together. Television, sport, concerts, art and
16 Alfredo M. Bonanno

cultural acti;

ies constitute a network for those who passively wait for things.

1o happen, such as the next riot, the next crisis, the next civil war, or whatever.

“This s the situation we need to bear in mind when talking of insurrection.
‘We insurrectionalist and revolutionary anarchists are not referring to something
that is sill to come about, but to something that is already happening. We are
not referring to a remote, far off model, which, like dreamers, we are trying to
bring back to life, unaware of the massive transformations that are taking place
at the present moment. We live in our time. We are the children of the end of
the millennium, actors taking part in the radical transformation of the society
we se before us.

Not only do we consider insurrectionalist struggle to be possible bu,
faced with the complete disintegration of traditional forms of resistance, we think
thatitis the condition towards which we should be moving if we do not want to
end up accepting the terms imposed by the enemy and becoming lobotomised
slaves, insignificant pawns of the mechanisms of the information technology
that will be our master in the near future.

‘Wider and wider strata of the excliuded are moving away from consensus,
and consequently from accepting reality or having any hope of a better fture.
‘Social strata who once considered themselves to be stable and not at risk are now
living in a precariousness they will never be able to escape from by dedication

1o work and moderation in consumerism.

Revolutionary anarchist insurrectionalist organisation

We believe that instead of foderations and groups organised in the
traditional sense—part of the economic and social structures of a reality that
o longer exists—we should be forming affinity groups based on the strength
of mutual personal knowledge. These groups should be capable of carrying out
specific coordinated actions against the enemy.

As far as the practical aspects are concemed, we imagine there would
be collaboration between groups and individuals to find the means, documen-
tation and everything clse necssary for carrying out such actions. As far as
analyses are concerned, we are attempting to circulate as many as possible in
our publications and through meetings and debates on specific questions. An
The Insurrectional Project 17

insurrectionalist organisational structure does not rotate around the central idea
of the periodic congrss typical of the big syndicalist organisations or the of-
ficial movement federations. s points of reference are supplied by the entirety
of the situations in the struggle, whether they be attacks on the class enemy or
‘moments of reflection and theoretical quest.

Affinity groups could then contribute to the forming of base nuclei. The
aim of these structures isto take the place of the old trades unions resistance or-

ganisations on the anarch

including those who i

syndicalist ideology—in

the ambit of intermediate struggles. The base nuclei’s field of action would be

any situation where class domination enacts a separation between included and
excluded.

Base nuclei are nearly always formed as a consequence of the propulsive
actions of insurrectionalist anarchists, but they are not composed of anarchists
alone. At meetings, anarchists should undertake their task of outlining class
objectives to the utmost.

A number of base nuclei could form coordinating structures with the
same aim. These specific organisational structures are based on the principles
of permanent conflictuality, sclf-management and attack.

By permanent conflictuality we mean uninterrupted struggle against
elass domination and those responsible for bringing it about.

By self:management we mean independence from all parties, trades
unions or patronage, as well as finding the means necessary for organising and
carrying out the struggle on the basis of spontancous contributions alone.

By attack we mean the refsal of any negotiation, mediation, reconcili-
ation or compromise with the enemy.

‘The field of action of affinity groups and base nuclei s that of mass.

struggles.

‘These struggles are nearly always intermediary, which means they do.
not have a direct, immediately destructive ffect. They often propose simple
objectives, but have the aim of gaining more strength in order to better develop
the struggle towards wider objectives.

Nevertheless,the final aim of these intermediate struggles is always at-
tack It however obviously possible for individual comrades or affinity groups
1o strike at individuals o organisations of Capital and the State independently
18 Alfredo M. Bonanno

of any more complex relationship.

‘Sabotage has become the main weapon of the exploited in their struggle
in the scenario we sce extending before our very eyes. Capitalism is creating
conditions of control and domination a levels never scen before through informa-
tion technology which could never be used for anything other than maintaining
power.

Wiy we are insurrectionalist anarchists
— Because we are struggling along with the excluded to alleviate and ultimately
abolish the conditions of exploitation imposed by the included.

—Because we consider it possible o contribute to te development of struggles that
are appearing spontancously everywhere, turning them into mass insurrections, that
s to say, actual revolutions.

—Because we want to destroy the capitalist order of the world which, thanks to
computer science restructuring, has become technologically useful to no one but
the managers of class domination.

— Because we are for the immediate, destructive attack against the structures,
individuals and organisations of Capital and the State.

—Because we constructively crificise all those who are in situations of com.-

promise with power in their belief that the revolutionary struggl

impossible
at the present time.
— Because rather than wait, we have decided to proceed to action, even if the
time is not ripe.
— Because we want to put an end to this state of afairs right away, rather than
wait until conditions make its transformation possible.

‘These are the reasons why we are anarchists, revolutionaries and insur-
rectionalists.
The Insurrectional Project 19

ANARCHISTS IN THE FACE OF
THE NEW CAPITALIST ORDER

Comrades, before starting this talk, a couple of words i order to get o know each
other better. In conferences a barrier s nearly always created beween whoever
is talking and those who are listening. So, in order to overcome this obstacle.
we must try to come to some agreement because we are here to do something
together, not simply to talk on the one hand and listen on the other. And this
common interest needs to be clearer than ever given the questions about ta be
discussed this evening. Often the complesxity of the analyses and the difficulty
of the problems that are being tackled separate the person who is talking from
those who are lstening, pushing many comrades into a passive dimension. The
same thing happens when we read a difficult book which only interests us up
10 a point, a book with a title such as Anarchism and Post

dustrial Society,
for example. I must confess thatif I were to see such a book in a shop window,
I'm not sure I'd buy it

That is why we need to come to some agreement. I think that behind
the facade of the problem under discussion, undoubtedly a complex one, the fact
that we are anarchists and revolutionary comrades means we should be able to
find some common ground. This should permit us to acquire certain analytical
instruments with which to better understand reality, so be able to act upon it
more effectively than before. As a revolutionary anarchist I refuse to inhabit
two separate worlds: one of theory and another of practice. As an anarchist
revolutionary, my theory is my practice, and my practice my theory.

‘Such an introduction might not go down well, and it will certainly not
please those who support the old theories. But the world has changed. We are
faced with a new human condition today, a new and painful reality. This can
leave no room for intellectual closure or analytical aristocracies. Action is no.
longer something that is separate from theary, and this will continue to be the
case. That is why it is important to talk about the transformation of capitalism
et again. Because the situation we see before us has already undergone rapid
restructuring,
20 Alfredo M. Bonanno

‘When we find ourselves in a situation like this, we tend to let ourselves.
be seduced by words. And weall know anarchists’ vocation for words. Of course
we are for action too. But tonight it is a question of words alone, so we run the
sk of getting drunk on them. Revolution, insurrection, destruction, are all words.
Sabotag
Ihave heard various questions asked. Sometimes they were asked in bad faith,

—there, another word. Over the past few days spent here among you

as far as | could tell. But translation from one language to another comes into
it, and I don’t want to be malevolen. 1 just want to say that it is important ot to
deceive oneself that my analysis provides the solution to the social problem.
do not believe any of the comrades 1 have spoken to over the past few days have
the solution either. Nor does the anarcho-syndicalist comrade with his analyses
based on the centrality of the working class, or the other comrades whoas far as |
can understand do not seem to agree with him and are proposing an intervention
of an insurrectionalist nature. No, none of these hypotheses can claim to possess
the truth. If anarchism teaches anything it teaches us to be wary of anyone who
claims to0 hold the truth. Anyone who does so, even if they call themselves an
imply
aim to formulate a critique of the existent, and if we sometimes get carried away

anarchist,is always a priest as far as | am concerned. Any discourse must

with words, it is the desire 1o act that gets the better of us. Let us stop here and
start thinking again. The destruction of the existent that opprsses us will be a
long road. Our analyses are no more than a small contribution so that we can
continue our destructive revolutionary activity together in ways that make any
small talk simply a waste of time.

So, what can we do? Anarchists have been asking themselves this
for a long time: how can we come into contact with the masses? to use a term
which often comes up in this kind of discussion, and which I have also heard on
various occasions over the past fow days. Now, ths problem has been faced in
two different ways. In the past, throughout the history of anarchism, it has been
faced by using the concept of propaganda, that i, by explaining who we are to
the masses. This, as we can easily see, is the method used by political parties
the world over. Such a method, the use of traditional anarchist propaganda, s in
difficulty today in my opinion, just as the spreading of any other ideology is. It
is not so much that people don’t want to have anything to do with ideology any
longer as that capitalist estructuring is making it pointless. And I must say here
The Insurrectional Project 21

publicly that anarchists are having difficulty in understanding this new reality,
and that it is the subject of an ongoing debate within the international anarchist
‘movement. The end of ideology is leading to a situation wher traditional anar-
chist propagand is becoming pointless. As the effectivencss (or il

ion, we do
notknow which) of propaganda disappears,the road o direct contact with people
is opening up. This is a road of conerete struggles, srugeles we have already
‘mentioned,everyday questions, butof course one can't exceed one’s imitations.
Anarchists are a very small minority. It s not by making a lot of noise,or by
using advertising techniques that they will be able to make themselves heard by
the people. So it is not question of choosing the most suitable means of com-
‘munication—because this would take us back to the problem of propaganda
and therefore ideology, again—but rather of choosing the most suitable means
of struggle. Many anarchists belicve th

to be direct attack, obviously within
the limits of their possibilities, without imagining themselves to be anyone’s fly
coachman,

L ask you to reflect for a moment on the state of Capitalism at the
beginning of the Eightics. Capitalism was in difficulty. It was facing increased
labour expenditure, a restructuring of fixed plans at astronomically high costs,
a rigid market, and the possibility of social struggles developing in response to
[

Capitalism changed. It overcame all its difficultics in a way that could never

And then, think about the conditions six or seven years later. How quickly

have been predicted, achieving an unprecedented programme of economic and
imperialist management of the world. Perhaps it does not seem 5o at the moment,
but this programme aimed at closing the circle of power is well underway. What
has happened? How was a situation so wrought with difficulties able to pick up
So quickly and radically?

‘We all know what happened, it is not the technical side of it that sur-
prises us. Basically, a new technology has been i

erted into the productive
process. Labour costs have been reduced, productive programmes replaced, new
forces used in production: we know all this. That is not the aspet of capitalist
restructuring that surprises us. No, what astounds us is the latter's ingenious
use of the working class. Because this has always formed the main difficulty
for capitalism. Capitalist geniality has succeeded in attacking and dismantling
the working class, spreading them all over the country, impoverishing, demor-
2 Alfredo M. Bonanno

alising and nullifying them. Of course it was affaid to do this at first, Capital
was always afraid to venture along that road, because reductions in the price of
labour have always marked the outbreak of social struggles. But,as s academic
representatives had been insisting for some time, the danger no longer e

at least it is disappearing. It is now even possible to lay people off, so long as
you do it by changing production sectors, so long as others are being prepared
And all the

social forces: parties, unions, social workers, the forces of repression, all levels

1o develop an open mentality and are beginning to discuss thin

of school, culture, the world of the spectacle, the media, have been rallied to
tackle Capitalism’s new task. This constitutes a worldwide erusade such as has
never been scen before, aimed at modelling the new man, the new worker.
‘What s the main characteristic of this new man? He is not violent, be-
cause he is democratic. He discusses things with others,is open to other people’s
opinions, secks to associate with others, joins unions, goes on strike (symbolic
ones, of course). But what has happened to him? He has lost his identity. He
does not know who he really is any longer. He has lost his identity as one of
the exploited. Not because exploitation has disappeared, but because he has
been presented with a new image of things in which he is made to feel he is a
participant. Moreover, he feels a sense of responsibility. And in the name of this
social solidarity he is ready to make new sacrifices: adapt, change his job, lose
his skills, disqualify himself s a man and a worker. And that is what Capitalism

has systematically been asking of him over the past ten years, because with the

new capitalist restructuring there is no need for qualifications, but simply for a
‘mere aptitude for work, flexibility and speed. The eye must be faster than the
‘mind, decisions limited and rapid: restricted choices, few buttons to be pressed,
‘maximum speed in execution. Think of the importance that video games have
in this project, to give but one example. So we see that worker centrality has.

disappeared miserably. Capital s capable of separating the included from the

excluded, that i, of distinguishing those who are involved in power from those
who will be excluded forever. By “‘power’we mean not only State management,
but also the possibility of gaining access to better living conditions.

But what supports this divide? What guarantees the separation? This
lies i the different ways that needs are perceived. Because, if you think about it

for a moment, under the old-style form of exploitation, exploited and exploiter
The Insurrectional Project 23

both desired the same thing. Only the one had, and the other did not. If the
construction of this divide were to be fully realised, there will be two different
Kinds of desire, a desire for completely different things. The excluded will only
desire what they know, what is comprehensible to them and not what belongs to
the included whose desires and needs they will no longer be able to comprehend
because the cultural equipment necessary to do so will have been taken from
them for ever.

“This is what Capitalism is building: an automaton in flesh and bone.
constructed in the laboratories of power. Today’s world, based on information
technology, knows perfectly well that it will never be able to take the machine
1o the level of man, because no machine will ever be able to do what a man can,
So they are lowering man to the level of the machine. They are reducing his
capacity to understand, gradually levelling his cultural heritage to the absolute
‘minimum, and creating uniform desires in him.

‘So when did the technological process we are talking about begin? Did
it begin with cybernetics as has been suggested? Anyone who has any experi-
ence of such things knows that if poor Norbert Wiener has any responsibility at
all it lies in the fact that he started to play around with electronic tortoises. In
actual fact, modern technology was born a hundred years ago when an innocent
English mathematician started toying with arithmetic and developed binary
calculus. Now, following on from that it is possible to identify the various steps
in moden technology. But there is one precise moment in which a qualitative
leap takes place: when electronics came to be used as the basis upon which the
new technology (and consequently the technology for perfecting clectronics)
was built. And it

impossible to predict how things wil evolve, because no
one can foresce what the consequences of this entry into a new technological
phase will be. We must understand that it is not possible to think in terms of
cause and effect. For example, it is naive to say that the great powers have the

atomic potential to blow up the world, even though this s so. This idea, 5o ter-
ifying and apocalypc, belongs to the old concept of technology based on the
hypothesis of cause and effect: the bombs explode, the world is destroyed. The
problem we are talking about here opens up the prospect of far more danger-
ous situation beeause it is no longer a matter of speculation but something that

already exists and is developing further. And this development s not based on
2 Alfredo M. Bonanno

the principle of cause and ffect but on the weaving of unpredictable relations.
Just one simple technological discovery, such as a new substance for energy
conservation for example, could lead to a series of destructive technological
relations which no one in all conscience, no scientist, would be able to predict
It might cause a series of destructive relations which would not only affect the
new technologies, but also the old ones, putting the whole world in chaos. This
is what is different, and it has nothing to do with cybemetics, which is only the
distant relative of the present nightmare.

In the light of all this we have been asking ourselves for long time
now: how can we attack the enemy if we do not know it in depth? But, if you
think about i, the answer s not all that difficult. We very much enjoy attacking
the police, for example, but no one becomes a policeman in order to do 0. One
informs oneself: how do the police operate? What kind of truncheons do they
use? We put together the small amount of knowledge required for us to roughly
understand how the police work. In other words, if we decide to attack the police.
we simply limit ourselves to obtaining a certain amount of knowledge about them.
In the same way, it is not necessary to become engineers in order to aftack the
new technology, we can simply acquire some basic knowledge, a few practical
indications that make it possible for us to attack it. And from this consideration
‘another, far more important one, emerges: that the new technology is not abstract,
itis something concrete. For instance, the international commaunication syster is
a conerete fact. In order to build abstract images in our heads it needs to spread
itself throughout the country. This is the way the new materials are being used.
let us say in the construction of cables for data transmission. And it is here that
it is important to know technology, not how it works in the productive aspec,
but how it i spread throughout the country. That is to say, where the dircting
centres (which are multiple) are to be found and where the communication chan-
nels are. These, comrades, are not abstract ideas but physical things, objects that
occupy space and guarantee control. It quite's

mple to intervene with sabotage
in this instance. Whatis difficult is finding out where the cables are.
‘We have seen the problem of finding the documentation and rescarch

required to attack: at some point this becomes indispensable. At some point,
knowledge of technology becomes essential. In our opinion this will be the

greatest problem that revolutionaries will have to face over the next few years.
The Insurrectional Project 25

Ido not know ifany use will be made of the compute in the society of
the future, the self-managed society many comrades refer to, justas it

impos-
sible to know whether any use will be made of a considerable number of the new
technologies. I fact, it is impossible to know anything about what will happen in
this hypothetical society of the future. The only thing I can know, up to a point.
concerns the present, and the effects of the use of the new technologics. But we
have already gone into ths, so there is no point in repeating ourselves. The task
of anarchists is o attack, but not on behalf of their own organisational interests
o quantitative growth. Anarchists have no social or organisational identity to
defend. Their structures are always of an informal character so their attack,
when it takes place, is not to defend themselves (or worse still o propagandise
themselves), but to destroy an enemy who i striking everyone. And itis in this
decision to attack that theory and practice weld together,

An historically unprecedented kind of capitalism is appearing on the
horizon. When we hear of neo-liberalism, thisis in fact what is meant, When we
hear talk of global dominion, this is the project that i being refrred to, not the
old concept of power, not the old imperialism. It was in the face of this project
and its immense capacity to dominate that real socialism collapsed. No such
thing would ever have happened in the context of the old capitalism. There is no
longer any need for the world to be divided into two opposing blocs. The new

capitalist imperialism s of an administrative kind. Its project is to manage the

world for a small nucleus of included, a the cost of the great mass of excluded.

And with these projects in mind, all possible means are already being used—the
new ones we have mentioned, along with the old ones, as old as the world, such
s war, repression, barbarity, according to the situation. In this way, n the former
Yugoslavia for example, a ferocious war is being waged aimed at reducing a
people’s capacities as far as possible. Then there will be an intervention in this
situation of absolute destruction in the form of a lttle humanitarian aid which
will seem like an enormous amount of help in such conditions of absolute and
total misery.

‘Think of what the state of countries like the former Yugoslavia would
be like without the war. A great powder-keg at the gates of western Europe,
on our borders, alongside the European Community. A powder-keg ready to
explode, social contradictions which no cconomic intervention would ever be
2 Alfredo M. Bonanno

able to raise to the level of western consumerism. The only solution was war,
the oldest device in the world, and that has been applied. American and world
ittle doubt that they
will intervene in the former Yugoslavia because the probability of rebellion in

imperialism are intervening in Somalia and Irag, but there i

this area must be reduced to zero. So, old means are being used along with new
ones, according to the situation, according to the economic and socil context
involved.

And one of the oldest weapons in the great arsenal of horrors i racism.
On the question of racism and all the misdeeds related to it (neo-nazism, fas-
cism, etc.), let’s look for a moment at the differentiated development of capital-
ist restructuring. In order to understand the problem it is necessary to see how
capitalist restructuring cannot solve allis problenss just by waving a magic wand.
It is faced with many different situations all over the world, each with various
levels of social tension. Now, these situations of social tension are making what
is lurking in the depths of each one of us rise to the surface, things that we have.
always put aside, exorcised. Essential factors such as racism, nationalism, the
fear of the different, the new, Aids, the homosexual, are all latent impulses in
us. Our cultural superstructure, our revolutionary consciousness, when it puts
on its Sunday clothes, obliterates them, hides them all. Then, when we take off
our Sunday best, all these things start o reappear. The beast of racism is always
present, and Capitalism is always ready to use it.In ituations such as that which
exists in Germany where social tensions have developed rapidly over the past
few years, this phenomenon is in constant development. Capital controls rac-
ism and uses certain aspets of it, but it is also affaid of it i that the overall
‘management of world power is of a democratic, tolerant and possibilist nature.

From the point o view of utlisation, anything (¢.&., ideology, fear) can exist—it
is all part of capital’s projet. We cannot say with certainty that post-industrial

capitalismis against racism. We can seea fow of its main characteristics, such as

its democratic nature, then suddenly discover that in the context of one specific

country the same technologically advanced capitalism is using methods that

were used a hundred years ago: racism, persecution of Jews, nationalism, attacks
on cemeteries, the most hateful and abominable things man can devise. Capital
is manifold, its ideology always Machiavellian: it uses both the strength of the
lion and the cuning of the fox.
The Insurrectional Project 27

But the main instrument of capitalism the world over are the new
technologics. We must think about this a lttle, comrades, in order to dispel so
‘much confusion. And in doing so we must also consider the possible use of such
technology on our part, in changed social conditions, in a post-revolutionary
situation. We have already seen how there has been a great qualtative leap from
the old technologies to the new—by new technologies we mean those based on
computers, lasers, the atom, subatomic particles, new materials, human, animal
and vegetable genetic manipulation. These technologics are quite different
fiom, and have litle to do with, the old ones. The latier limited themselves to
transforming material, to modifying reality. On the contrary, the new technolo-
gies have penetrated reality. They do not simply transform it, they create it,
instigating not just molecular changes, possible molecular transformation, but
above all creating a mental transformation. Think of the use that is normally
made of teley

jon. This instrument of communication has got inside us, into

our brains It i modifying our very capacity 10 see, to understand reality. It is

‘modifying relations in time and space. It is modifying the possibility to step out
of ourselv

s and change reality. In fact, the vast majority of anarchists do not

think it possible to make use of this assemblage of modern technologies.
Tknow that there s an ongoing debate about this. However,this debate

is based on a misunderstanding. That

. itis trying to treat two things that are
radically different in the same way. The old revolutionary dream, let us say of
‘Spanish anarcho-syndicalism, was that of attacking and defeating power so that
the working class could take over the instruments of production and use them
in the future society in a way that was more just and free. Now it would be im-
possible to make a fairer and more free use of these new technologies, because
they do not stand passively before us like the old technologies of yesterday, but
are dynamic. They move, penetrate decp inside us, have already penetrated us.
I we do not hurry to attack, we will no longer be able to understand what we.
need in order to do 5o, and rather than us taking the technologies over, it will be
the technologies that take us over. It will not be a case of social revolution but
of the technological revolution of capital. This is why a revolutionary use of
these new technologies is impossible. The misconception s similar to the old
one concerning the possible revolutionary use of war, which many well-known

fell prey to when the fist world war broke out. A revolutionary use of
2 Alfredo M. Bonanno

waris impossible, because waris always an instrument of death. A revolutionary
use of the new technologi

is impossible, because the new technologies will
always be instruments of death. So all that s left to do is to destroy them—to
attack, now, not in the future, not when the project has been completed, not
when those who are deceiving themselves stop doing so, but sabotage now,
attack now. This is the conclusion we have reached. It is at the moment of the

destructive attack that one clarifies what we said to begin with. It

atthis point
that theory conjoins with practice, and the analysis of post-industrial capitalism
becomes an instrument with which to attack capitalism. It becomes an instru-
‘ment for insurrectionalist and revolutionary anarchism in order to direct one’s
attention to what —the men and the things —makes this project of restructuring
of Capitalism possible, and whose responsibilities are clear.

Today as never befre, striking at the root of nequality means attacking.
that which makes the unequal distribution of knowledge possible dircctly. And
that is because, for the first time, reality itself s knowledge, for the first time
Capitalism is knowledge. Whereas the centres where knowledge was elaborated,
the univer

ties, for example, were once cloistered places o be consulted at
specific times of need, today they are at the centre of capitalist restructuring, the
centre of repressive restructuring. So, a distribution of knowledge is possible. |
insist on saying that this is an urgent problem, because it i possible to grasp any
difference when one sees it. But when a net separation between two different
Kinds of knowledge which have no communication between them occurs —the
knowledge of the included and that of the excluded—it will be too late. Think
of the project of lowering the quality of schooling. Think how mass schooling,
once an instrument for gaining knowledge, has been transformed over the past
twenty years into an instrument of disqualification. The level of knowledge has
been lowered, whereas a restricted minority of privileged continue to acquire
ather knowledge, in speciali

d masters degrees organised by Capital.

‘This, in my opinion, demonstrates the need and urgency for attack yet
again. Attack, yes. But not blind attack. Not desperate, illogical atack. Projectual,
revolutionary attack, with eyes wide open in order to understand and to act. For
example, the situations where capital exists, and is being realised in time and
space, are not all the same. There are some contexts in which insurrection is more
The Insurrectional Project 2

advanced than others, yet there is sill a great possibility for mass struggles to
take place internationally.Itisstill possible to intervene in intermediate struggles,
thatis, in struggles that are circumscribed, even locally, with precise objectives
that are bo from some specific problem. These should not be considered to
be of secondary importance. Such kinds of struggle also disturb Capitalism’s
universal project, and our intervention in them could be considered an element
ofresistance, putting a brake on the fragmentation of the class structure. | know
that many comrades here this evening have experienced such things, and have
participated directly in specific struggles

So. we need to invent new instruments. These instruments must be
capable of affecting the reality of the struggles without the mediation of trade
union or party leadership. They must propose clear, even though limited, objec-
tives, ones that are specific, not universal, so in themselves are not revolutionary.
‘We must point to specific abjectives because people need to feed their childrn.
‘We cannot expect everyone to sacrifice themselves in the name of universal
anarchism. Limited objectives, then, where our presence as anarchists has the
prcise task of urging people to struggle directly in their own interests because it
is only through direet, autonomous struggle that these objectives can be reached.
And once the aim has been reached the nucleus withers and disappears. The
comrades then start again, under different conditions.

‘What comrades are we talking about? What anarchists are we talking
about? Many of us are anarchists, but how many of us are available for real
concrete activity? How many of us here today stop short at the threshold of the
issue and say: we are present in the struggle, we suggest our project, then the
workers, the exploited, do what they like. Our task is done. We have put our
conscience at rest. Basically, what is the task of the anarchist if it is not propa-
‘ganda? As anarchists, we have the solution to all social problems. So we present
ourselves to the people who suffer the consequences of the problem, suggest our
solution, and go home. No, this kind of anarchism is about to disappear out for
‘good. The last remaining mummies belong to history. Comrades must take the
responsibiliy for struggles upon themselves dircctly and personally because the
objective against which the exploited need to struggle in certain situations, and
against which they ofien do not, is a common one because we are exploited just
as they are. We are not privileged. We do not live in two different worlds. There
30 Alfredo M. Bonanno

is o serious reason as to why they (the so-called masses) should attack before.
we do. Nor do I see any reason why we should only feel ourselves authorised
to attack in their presence. The ideal, certainly, is mass struggle. But i the face
ible and

decide to attack personally, directly, not wait for signs of mass struggle. Because

of the project of capitalist restructuring anarchists should feel respor

this might never happen. So this is where the destructive act takes place. Itis at
this point that the circle closes. What are we waiting for?

So, individual acts of destruction too. But here an important objection
has been raised: what does one gain by smashing a computer? Does that perhaps
Solve the problem of technology? This question, an important one, was presented
10 us when we worked out the hypothesis of social sabotage. It was said: what
resultis obtained by destroying a pylon? First ofall the question of sabotage is
ot aimed so much at the terminal points of technology as at the communications
network. So, we are back to the problem of knowledge of the way technology
is distributed over the country, and, if you allow me to digress for a moment
I want to point to a serious problem that arises here. I allow myself to use the
term “serious problem’ because a comparison has been made between what a
elandestine armed organisation thinks they are doing by striking a specific person,
and what, instead, an anarchist insurrectionalist structur thinks it is doing by
striking a technological realisation, maintaining that, al said and done, there is
ot much difference. There i a difference, and it i a very important one. But it
is not a question of the difference between people and things. It s an even more
important difference, because the aims of the clandestine armed organisation
contain the error of centrism. By striking the person, the organisation believes it
is strking the centre of Capital. This kind of error is impossible in an anarchist
insurrectionalist organisation, because when i

trikes a technological realisa-
tion (or someone responsible for this realisation), it is fully aware that it is not
striking any centre of Capitalism.

During the first half of the Eighties, huge mass struggles took place
against nuclear power plants in Italy. One of the most important of these was
the struggle against the missile base in Comiso. In this context we realised ‘base
nuclei” For three years we struggled alongside the local people. This was a mass
struggle, which for various reasons did not succeed in preventing the construc-
tion of the base. But that is not the only kind of struggle we consider

s just
The Insurrectional Project 3

one of the possible ones we participate in as insurrectionalist anarchists, one of
the many intermediary struggles possible.

In another direction, in the years that followed, over four hundred
attacks took place against structures conneeted to the clectric power supply in

ialy. Sabotage agai

t coal-fired electric power stations, the destruction of high-
voltage pylons, some of them huge ones that supplied a whole region. Some
of these struggles transformed themselves into mass struggles: there was mass
intervention in some of the projeets of sabotage, in others there was not. On a.
dark night in the countryside, anonymous comrades would blow up a pylon.
‘These attacks were spread over the whole country, and in my opinion possessed
two essential characteristics: they constituted an casily realisable attack against
Capital, in that they did not use highly destructive technology and, secondly,

they are easily copied. Anyone can take a walk in the night. And then, it is also

healthy. So anarchists have not passively waited for the m

s to awaken, they
have considered doing something themselves. In addition to the four hundred
attacks we know about, one could guess that at least another four hundred could
have taken place as the State conceals these actions because it is afraid of them.
It would be impassible to control a capillary-style spreading of sabotage all over
the country. No army in the world is capable of controlling such activity. As far
s 1 know, not one comrade has been arrested in connection with the known four
hundred attacks.

I would like to wind up here because I think I have been talking long
enough. Our insurrectionalist choic is anarchist. As well as being let us say a
characterological choice, a choice of the heart, it s also a choice of reason, a
resultof analytical reflection. What we know about global capitalistrestructuring
today tells us that there is no other way open to anarchists but that of immediate,
destructive intervention. That s why we are insurrectionalists and are against
all deology and chatter. That is why we are against any ideology of anarchism,
andall chatter about anarchism. The ime for pub talk is over. The enemy is right

outside this great hall, visible forall to see. Itis simply a question of deciding to

attack it. | am certain that insurrectionalist anarchist comrades will know how
1o choose the timing and the means for doing so, because with the destruction
of this enemy, comrades, it is possible to realise anarchy.
32 Alfredo M. Bonanno

ANARCHISTS AND HISTORY

What is your identity and that of anarchism?

Today, particularly following the collapse of actual socialism, wide perspectives
are opening up for revolutionary anarchism. This should be intended both as an
analyticalinstrument, a means for understanding reality, and as an organisational
point of reference for people carrying out social struggles in everyday practice.

What is the position of the Italian anarchist movement in today s society?

“The ltalian sitvation s very different from the Greek, partly because laly has
witnessed twenty years of authoritarian revolutionism, i.e., Marxist-Leninist
armed groups. The failure of this authoritarian strategy, the aim of which was
the conquest of power, has led people to think that all revolutionary struggle is
in ltaly are faced with a very difficult task today,
because on the one hand this problem needs to be clarified, and on the other itis

doomedto failure. So anarchi

necessary to explain o people what one means by revolutionary struggle, which

for anarchists is the destruction of power. And they cannot limit themselves to

explaining all this merely in words. It also needs to be done by means of the
conerete practice of social struggles, something that s still to happen.

What image do Halian people have of anarchists?

‘When Italian society has an image of anarchism and anarchists 1 say when it
has, because often they do not even know what anarchists are—it is either an
image that dates back about 100 years or one supplied by the media. Media im-
ages often confuse anarchists, autonomists and other marginal components of
society such as the lumpen-proletariat in revol, even to the point of sometimes
calling hooligans anarchists.

This happens in spite of the fact that the anarchist movement has a long history
in Italy?
The Insurrectional Project 33

It is also due to a certain incapacity on the part of anarchists themselves. But it

should be said that it is not easy to destroy an opinion that television constructs
in a day, in one single programme. You must understand that the historical in-
heritance of the Italian anarchist movement is hardly known, as it is confined
1o the anarchist minority and academic study. The information that most peaple
receive s limited to the mass media. Due to such conditions, which are the same

in Greece,

not possible to modify the situation from one day to the next, a
lot of work is required here.

Is ause of the media considered 0 be partof the insurrectional project?

‘This is a very important question, and demonstrates the radical difference
between two revolutionary strategies. On the one hand the authoritarian one,
that of the old Marxists whose aim was to realise spectacular actions —the case
which caused the greatest str being the Moro kidnapping—using the media and,
through this instrument of sensationalism, make mass propaganda. According
do
possible to use the media. A limited, subtle dialogue can only be

to insurrectionalist anarchists this s definitely a losing strategy. Anarchis
not think i

held ata theoretical level, as we are doing novw. It cannot exist at a practical level
during social struggles, because then, more than at any other time, the media
‘merely carry out the role of supporting the enemy. Insurrectionalist anarchists
do not believe it is possible for objective, neutral information to exist.

Bt are all people prey to the media? Could these means of information not play
an important role in making anarchists better known?

I don’t believe anything is absolute. In revolutionary activity choices are made
that naturally have both positive and negative aspects. When they find them-
selves in social struggles, insurrectionalist anarchists have chosen to refuse this
‘means of communication. OF course that has its price in terms of transmission
of the image, but I think that there are more important issues involved such as
Keeping the media away from the social struggle, although that does not prevent
them from carrying out their job of mystification. But here it is a question of
34 Alfredo M. Bonanno

revolutionary responsibility, and in Italy more than a few journalists have been
attacked personally as a result. So, there is nothing absolute about making such
judgements, only practical choices to be made.

It has been argued that Europe is presently moving through a cultural Middle
Ages. What is your opinion on this?

“This is a complex question, which in order to answer requires at least a couple
of words of introduction of a cultural nature. The very concept of a “cultural
Middle Ages” shows the limitations of certain information. The Middle Ages is
seen negatively, as the “dark ages”, which was not the case. The erisis of ideology
has also led to a crisis in the idea of progress, upon which the Mar

st analysis.
in particular was based. It s sufficient to think of Lukacs and his theory that
reality s proceeding in a determinist and historicist way towards a better future.
In the past this ideological concept was also shared by various anarchists, and
it was in error. Reality is not moving in a progressive dircction, and the condi-
tions of barbarity are always present. There s not one thing in history that can
‘guarantee otherwise. We cannot look at any specific period and say: barbarity
is over, fascism i finished with for good. We live with fascism, we can sce this.
better thanks to the crisis in ideology that has opened our eyes a little, but only
alittle. So, as far as this question s concerned I am of the opinion that we find
ourselves, not in the Middle Ages, because the Middle Ages were not barbarian,
butin a situation where barbarity is currently possible. So, no, I don’t agree with
the idea that we are going through a historical period similar o the Middle Agy

‘We are constantly living in a condition of possible barbarity, but also of possible

freedom. It s up 10 us to choose which road we want 1o take, and this is the aim

of revolutionary activity: understanding which road is the road to freedom, and
finding the means 1o take it.

Concerning the crisis in ideology and the position of Fukuyama re the end of
history, the end of ideas—have we reached the end of history or do we have any
ideas that are capable of giving us information? And ifso, what do we then mean
by the concept “the end of history”
The Insurrectional Project 3s

‘Thatis a very articulate question. We need to determine what we mean by history.
Notby chance s there a rlationship between neo-liberalism and history, because
the old liberalism was historicist, that s, it supported the ideology of history: That
kind of history

finished. No matter what the philosophers say, the crisis in the
idea of progrss concerned a single line proceeding forward through reality and.

time, necessarily leads to a crisis in the ideology of history, not merely a crisis of
history. So, it is not just a matter of a cisis in ideas, because the new liberalism
is affaid of a future lack of social control and is circulating the fear of ‘the end.
ofhistory” at the level of public opinion, Their aim is to limit people through an
ideology of history which, like any ideology, is an instrument of control. So, we.
have not reached any end historically at al. The fact that we are reaching the end
of the millennium just increases the confusion. A neo-millenarianism is being

putinto circulation for irational reasons. This

avery dangerous social terrain
where we can see a development of all the religious integralisms, including the
Christian version, in the name of an abstract need to save man. So, it is not a
question of “the end of history”, but rather of the end of historicism which, like
any new ideology of world domination does not know what to do yet. It realises

that it does not yet have the ideally adapted theoretical instruments necessary,
whereas academia, i.¢. the world—Japanese and American—university has
nothing better to do than produce amenitics of this kind.

Does history have a cyclical or a linear pattern?

“This is also a difficult question. But are all your readers philosophers? I do not
know how much depth analysis could be useful, however I will start by estab-
lishing that we cannot separate the idea of history from the idea of progress.

‘The ides of progress comes from the revolutionary bourgeoisie who lent them-
selives to the conquest of power. We need to understand that the idea of progress
is an idea of power, of the management of power. Now, the idea of progress.
requires a linear conception of history, something that was expressed very well
by Marx. He thought that the revolutionary clash between the bourgeaisic and
the proletariat would necessarily end up with the victory of the proletariat,
because the latter were destined to realise history. In this he applied the idea of
his philosophical mentor, Hegel, who said that the objective idea of the world
36 Alfredo M. Bonanno

would realise philosophy and would render it useless, so people would no longer
need to think. And we have seen how the State did think in place of people in
the countries of actual socialism. And these apparently innocent philosophical
ideas stilllurk amongst small university groups and are discussed by very seri-
ous people, savants worried about people’s destiny. Then they come out of the
universities, move about in reality and contribute to building the concentration
‘camps, determining full-scale massacres, historical tragedies of vast proportions,
wars and genocide.

Now, having established this we can return to the problem of the linear
concept of history. What do anarchists put in i

place? They suggest inverting
Marx’s sentiment, that the sleep of reason breeds monsters. On the conirary,
anarchists maintain that it is in fact reason that breeds monsters. That is to say
the reason of the philosophers, the politicians, the programmers of power, do-

‘minion, and also of historical ideology. So, as long s it is possible to build States
and support exploitation, war and social death, a concept of linear history will
be possible. When all that changes, or begins to change, we will finally realise
that there is no such thing as lincar history but that, according to the intuition
of your ancient Greek philosophers (who remain unchallenged today), reality
is of a circular movement wherein the barbarity of the past can present itself
at any time. In this circular movement nothing s ever old or new, but rather
everything is always different—which does not mean that it is more, or less,
progressive. That is why it is necessary to begin again cach time, identify the
enemy, the class enemy, the social enemy, power, and attack t, always with new

‘means. Itis something of the work of Sisyphus, and anarchists have this quality
of Sisyphus, of always starting at the beginning again, because, like him, they
never give up. And with this moral strength of theirs they are superior to the

gods. just like Sisyphus.

What do you think of the reappearance of nationalism?

‘There is not only a reappearance of nationalism, but reappearance of the most
ferocious barbarity of the past. For instance, atleast according to what the news-
papers report, twenty thousand women have been raped in Bosnia. But not in
the same way as with all the other armi

i the world, because rape is a normal
The Insurrectional Project 37

practice of any army, but rather as a deliberate means of fathering Serbians, i.c.
asakind of genetic programming. Such an idea really goes back to the beginning
of time and confronts us with tragic considerations. For example, it could be that
we (including anarchists) made a mistake concerning man’s original goodness
and the notion that it was society that made him become bad. We will probably
all have to reconsider these concepts. We need to become more intellectually
acute, and not be amazed cach time these events re-oceur in istory, and stop
placing our hopes in peoples” goodness. Nationalism rises up again because it
exists in each one of s, because racism is inside every one of us. The fear of
the black man is inside us, in those obscure regions that we are affaid to pen-
etrate, where there is the fear of the different, the foreigner, the Aids sufferer,
the homosexual. These fears exist inside all of us, anarchists included, and we
need to talk about them, not hide them under ideology, under great words such
as revolution, insurrection, freedom. Because all these beautiful words, if they
are developed and brought about in reality by men who are afraid of the dif-
ferent, run the risk of becoming the instruments of the power of the future, not
instruments of liberation.

What do the American ghetto riots such as the one in Los Angeles signif?

‘The collapse of actual socialism has brought the apparent universal domination
of the Americans to the fore. I say apparent because it is not just the Americans.
1 we make the mistake, as [ seem to see being made during the course of these.
talks in various towns in Greece over the past few days, of aiming all our erifi-
cism at the Americans, we will not be able to understand the general character
of the new imperialism. Yes, we have American domination, but also that of the
European Community and the Japanese economic colossus. But this riumvirate.
is different to the power structures of the past. They do not relate to each other in
terms of the competition that existed before the collapse of the Soviet empire, but
share economic relations of imperialist administration, that s, the construction
and maintenance of world domination.

For example, the situation in the former Yugoslavia is only compre-
hensible through an analysis of the new world imperialism-—not only Yankee,
but also European. Just think, west Germany has planned to invest thousands
38 Alfredo M. Bonanno

of billions of marks over the next ten years to raise cast Germany to the level of
western consumerism. And that concerns just 17 million people. Now, if such
a project were 1o be made for the whole of the East, from Russia to the former

Yugoslavia, an impossible sum would be required. No world power i existence

is capable of bringing about such an operation, and world imperialism is aware
of this

‘What s the solution then? War. That s why there is no American inter-
vention in the former Yugoslavia, because a ferocious, destructive war such as
the one now taking place will throw the Serbian, Croatian, and Bosnian peaple
into conditions of such acute poverty that even the slightest intervention, any.
tiny act of humanitarian aid, will be seen as something positive. Think of such
a situation existing without the war. Combative peoples at the gates of Eastern
Europe, on the border with Greece. Combative peoples in extreme poverty, with
a great capacity for revolutionary social action: what a danger for the European
Community! Unfortunately I believe the use of war as an instrument of imperialist
‘management could well be extended, and other examples of this can be seen.

‘The question of the riots within the American empire is quite differen.
‘We must bear in mind that it is not just a question of America, because similar
events have also taken place in other countries. More than ten years ago there
were riots in Brixton. Then in Switzerland, there was the revolt in Zurich, and
in Germany, in Hamburg. Under the conditions of advanced capitalism and
prcisely due to the process of expulsion of the old proletariat from the factory,
there s an increasingly wide strata of new poor who have nothing to lose, and
who constitute a threat that is ready to explode at any moment.

T should be said however that the significance of these explosions should
not be overestimated. It is true that anarchists have always been in favour of
such revolts. Whenever possible, they have participated in them, anywhere—in
Society orin prison, and always on the side of the weakest. But today they must
avoid the theoretical isk of puting the social rebels of the fture in the place
of the worker centrality of yesterday. Society is a complex problem, which has
nothing in its centre. There s not one small part of saciety that is capable of
realising the revolution, not even the Los Angeles rioters. Even if we sympathise
with them, even if we are alongside them. But we must adit that they are just
one clement, a sort of involuntary anticipation of possible fture mass insurrec-
The Insurrectional Project 39

tions, not the main element. And this needs to be said clearly, against all those
who deliberately accuse us of forgetting the roles of the other social srata.

What relationship is there between the recent scandals in ltaly and Greece, and
the new management of power?

‘The problem of the ltalian and Greck scandals is important, and it is no coinci-
dence that these have come to lightat the present time, because they correspond
to profound changes in the management of power. The new global capitalism,

more obvious in some places than others—for example it is more evident in
the United States, less o in Greece—needs a political managerial class, not
one characterised by ideological agreement, but one technically suited to the
‘managerial needs of global imperialism.

For example, a management of power similar to that of the ex-USSR,
o a kind of national socialism, would of necessity have had recourse to mass
arrests, mass exceutions, and would have resolved the problem of a revolt in a
few days. A democratic management must use other means. Replacing the head
of government s a difficult thing to do, and scandals are an excellent means of
achieving the replacement of the old social leadership by the new technocratic

Can you tell us anything about the Gladio in Iialy?

As Machiavelli once wrote, anything s legitimate in the political arena. In Italy
the Gladio scandal is the Christian Democrats” esponse to the denunciation of
their clandestine activity afier the war, which cameto lightn the Soviet archives
years later. Yes, I said it was the Christian Democrats’ response... Contrary to
what i belicved, it was not the Communist Party that denounced the armed ac-
tivity of the USA and the Christian Democrats. It was the Christian Democrats
themselves who justified their activities in terms of the defence of capitalist
ideals, in a desperate attempt to save the old political leadership by building a
“revolutionary’ purity to show that people who had taken up arms in the past

should not be made to pay by Capital. Contrary to the logic of other cconomic
a0 Alfredo M. Bonanno

scandals, the Gladio s an exercise in inverse logic. Whereas the economic scan-
dals are aimed at destroying the old leadership, the Gladio operation tried to save
it. Nevertheless this proved impossible, because the needs of world imperialism

are greater, and end up by taking over.

Ina Greek anarchist paper of 1896 there is an interesting artcle on ecology:
What do you think about the fact that today Capital tself uses ecology as a
means of restructuring?

First we need to put this into context, given that you've made reference to a paper
from the nincteenth century. Anarchism is not a political movement and never
has been. It is a social movement, a carrier of social ideas, and so has always,
right from its birth, dealt with the entirety of social problems. If one looks at
anarchist papers of the last century, one can find not only the question of ecology
addressed but also any other problem that concerns man. The anarchists were
the first 1o talk about free love, eroticism, homosexuality, about all the aspects
that concern daily life. Thi

one of the strengths of anarchism, and has led to
the anarchist movement being considered, today as in the past,a great reservoir
ofideas into which everyone can dip, and from which Capital tself has derived
many concepts. But anarchists are aware of this. They have always put their
ideas at the disposal of others, because, as Proudhon said, the worst kind of
property is intellectual property. Anarchists have never ben affaid that Capital
‘might steal their ideas, because they have always known that they are capable
of moving beyond them. So, if at the end of the last century anarchists were

ecologists in a particular way, in that they were the only ones to be ccologists,

now that Power has *become ecologically-minded” and ccology has become a
leading industry, anarchists are no longer ecologists the same as before. They
o longer say that it is necessary to save nature, but rather that in order to save
nature it is necessary to destroy both those who are polluting it, and those who
want to save it using State means.
The Insurrectional Project a1

How do you see yourself?

‘That is a question that I was asked before many years ago now here in Greece,
in a very different political situation. The physical conditions were also very
different then. At the time I replied: a comrade among comrades. Now that I am
older my reply i the same: a comrade among comrades.
Anti-copyright 2006 - please reproduce and appropriate at wil
This book can be downloaded as a PDF fle from [ wvani-politcs.net |