Reflections on the UChicago Popular University for Gaza Encampment
Web PDF • Imposed PDF• Raw TXT (OCR)
Reflections on the UChicago Popular University for Gaza Encampment  An extensive analysis on the Palestinian solidarity movement and protest encampments that sprang up in Chi summer. Originally posted to the Lake Effect Collective website.

‘The final Gaza solidarity encampment to fall in the city of Chicago was pitched on June 8that Buckingham Fountain, directly adjacent to Lake Shore Drive and within sight of the ‘expanse of Lake Michigan. An hour and forty minutes into a small rally, a group of participants hurriedly set up a dozen tents, established a new “encampment,” and “liberated” the fountain in the name of Gaza. Chants includéd: “We will protect our students.” However, the Coalition for Justice in Palestine (CIP) did not show the camp the same loyalty; after ushering a handful of over-eager arrestees out of the tents, organizers with CJP unilaterally called an end to the zally. The Clicago Police Department (CPD) followed anits heels to confiscate and discard the tents once the camp had voluntarily disbanded. The fountain was “liberated” for a few hours at most. The tents, leftover from other encampments, which CIP had refused to’donate to unhoused Chicagoans becatise they belonged to the organization, were instead gifted to the CPD—who did niot appear to appreciate the gift.  This bizarre conclusion to a semester of campus occupations is how exactly half of those who planned the University of Chicago Gaza Solidarity Encampment hoped events would conclude on their quad. These student activists, who made up a vocal reformist bloc within the so-called “Core” of UCUP (University of Chicago United for Palestine), promised to stay until the school divested from Istael. For many’of them, it was a bate-faced Li; they planned to return to their dorms and apartments after the camp’s second night. This faction subtly campaigned against keeping the encampment gomifqr its éntire existence and consistently wore down efforts t6 make it a genuine occupation.  They were, however, a numerical minority. Many students heard their cynical words and took them literally, as the promise to stay until divestment became the bottom line for the encampment’s radical edge. The tensions that emerged between the phrase and its content, a3 Core’s internal unity and external control of the camp’s affairs broke down, helped us find our place among the various blocs of the campus-based Palestine movement. We hope an inventory of these experiences may point to possible ways forward now that the season of encampments has ended.  ‘The document you are reading is the direct collaboration of eleven participants in the encampment and draws upon insights and recollections from a larger body of comrades. While we use an authorial “we” to outline points of consensus, the authors are an eclectic group of UChicago students, workers, and unaffiliated community members. Some of us have extensive movement activity, including Palestine solidarity, labor organizing, and campus politics, and others experienced the encampment a3 their first wave of struggle. Many of us did not know each other before the encampment, and we are not members of any revolutionary organization. Defpite our different backgrounds and varying refationships with the university, we came together around a
shared practical sensibility, steered by the notion that the Palestine solidarity movement in Chicago, and more broadly, the essentiall connected movement to end capitalism, must” do better, ani develop tactics and strategies adequate to these righteous airns.  We believe that the university encampment movement in the United States is a significant political development that will, for better or worse, determine the immediate future of the Palestine solidarity movement and also help set the stage for the next wave of mass Struggle on a more generalized scale——the likes of which we saw in 2030 and will surely see again before long. It is thus essential to map its contours and contradictions. In our narrative analysis, we hope to establish a definitive documentation of how the UChicago encampment went down, with the broader intention of opening up an array of tactical and strategic questions for readers in Chicago and beyond. We offer a story that is at once likely to be familiar to those who have participated in pro- Palestine encampments and simultaneously quite at odds with the official version of events offered by the more reformist organizations active in them. While certain aspects of the story are unique to_their setting, most of what we have included is generalizable to pressing questions around how incipient mass Tovements understand themselves, organize, unfold, and die. Within the context of UChicago, we hope what follows will serve as a kind of cautionary taie. The movetnent must do better In the future, and we would not have taken the considerable time to collectively author what follows if we did not believe it was possible.  While we do not have a directly programmatic solution for the Bresent political morass, we share a common understanding that he anly effective moverrent tofree Palestine must simultaneoust  entail the revolutionary transformation of the United States and al capitalist societies, on which the barbarism of Zionism and other forms of life-denying oppression rest. This understanding does not mean deferring the end of the occupation until the proverbial “after the revolution,” but instead, practically linking the fate of Palestinians with the victims of capitalism on a global scale as a ‘means of orienting political activity on the local lével, in the here and now. While overthrowing a superpower like the United States and the attendant collapse of a global hegernon like the capitalist mode of production might seem impossibly far-fetched, such abrupt historical transformations have almost always seemed that way until the day they didn’t. In any case, this is not a thought experiment; the struggle is already underway.  I. The Siege of Gaza  In 2024, the Zionist state has occupied the land of Palestine for seventy_five years. For three generations, the regime and its armed men have subjected Palestinjans living in this reservation- turned-killing zone to deprivation, humiliation, and genocide. But
the blame falls on the Zionist entity only as much as it falls on its friends, those ploneers of population management: the last centuries’ colonial empires and their descendantts, the developed capitalist states. Once eager to support Theodor Herzl’s attempt to dSolve” the so-called Jewish question in Europe by creating a “national home for the Jewish people” Somewhere, Aywhere But Here, these states now constitute the Zionist regime’s most earnést and ardent supporters, seeing it as a crucial partner and foothold in a crisis-ridden region, at various moments the bulwark against communism, Arab nationalism, and political Islam. The history of the Palestinian occupation is a global story, implicating the great powers of the world; so, too, miust its liberation be the busifiess of every person fighting for fréedom worldwide.  The present historical moment beganin the late twentieth century, with’ powerful nations and increasingly transnational capitalists realizing that the world system sustained until the sixties and seventies could not continue. Profit rates dwindled, and state counter-offensives _against _radical labor and ’ liberation movements_triumphed”domestically. Capital then set its sights abroad, as industrial manufacturing in the core gave way fo a bloated service sector and ejectéd swathes of (racialized)  roletarians from regular access to employment and pay. imultaneously, colonies and dependent client states won their “independence” from their metxopoles, only to be re-integrated into global circuits of capital by the same imperial firms fleeing their domestic labor markets, backed by an international order gapable of forcing newly ifdependent States inio, predatory “structural _adjustment”  policies, responding with extra- economic force where this proved unisuccessful, This new round of primitive accumulation engendered perpetual instability in many so-called underdeveloped hations as a paramount condition of their participation in the world market. To make matters worse, the drive to compete has accelerated the destruction of a massive range of the planet’s plant and animal life and rendered human habitation in these same areas increasingly dangerous—for their inhabitants and the rest of humanity, as the fout_year pandemic has demonstrated.  We face today a combined but unequally developed global crisis at the hands of a transnational capitalist class whose “Fuling bloc” is politically disorganized, incapable of or unwilling to pursue long- term planning, and ready instead to white-knuckle whatever crises are necessary to shore up its persistence, at the expense of the populations it holds apart from regular employment (hereatter “Surplus” to labor). Avenues of resistance—labor unions, old socialist parties—that once served as counterweights to the capitalist order have integrated into it. Likewise, the external differentiations that once characterized global politics have fallen to the wayside as part of an international consensus to safeguard new accumulation schemes and protect the system from its final collapse. Unlike the left, which is disoriented and dislodged from
the old institutions and conditions of struggle that gave the old workers’ movement shape, the world’s leaders find relative unity in the willingness, among  handful of competing blocs, to deplos the same technologies of surveillance, incatceration, intema ant external policing, and war to bolster their territorial claims and the interests of their more prominent individual capitals.  Occupied Palestine is one laboratory among many for maintaining affluence amid  this sustained "crisis. ~Following the 1997 establishment of the Greater Arab Free Trade Area and the 2003 invasion of Iraq, capital in the Middle East has consolidated—as seen in the 2020 Abraham Accords normalizing relations with the UAE and Bahrain—and been integrated into global circuits. The Zionist entity is also on the receiving end of large flows of migrants from Africa and East, South, and Southeast Asia, drawn on to implement its projects. Notably, the majority of Palestinians in Gaza have not been permitted entry to work since 1993, when the Zionist state sealed Gaza’s borders following the first Intifada. During the decades following, the regime began “To reorganize labor markets and to recruit transient labor forces that are disenfranchised and easy to control.” In particular, migrant laborers replaced Palestinian surplus-proletarians as a flexiblé and cheap labor market input, rendering the present genocide economically feasible in light of the global integration of border regimes and increasingly tfansnational labor markets.  Globally, migration rates have skyrocketed s those who can escape for more stable and temperate zones with more capital and competitive labor markets do so. These migrants are at once shut out and drawn upon as needed to implement what the managerial middle class has determined is necessary to maintain bourgeois consumption standards; they serve as floating labor reserves for increasingly predatory individual capitals. From the American Southwes? to Australia, core states have accomplished in their border enforcement what was once only achievable thmu%h apartheid. Likewise, migrant laborers in Israel “do not need to be subjected to the apaitheld system imposed on Palestinians because their temporary migrant status achieves their social control and disenfranchisement more effectively, and of course because they are not demanding the return of occupied lands and do not have a political claim to a state.” This ejection from access to labor markets leaves the Palestinian people not as a traditional surplus population, leveraged to keep the price of labor cheap, but as surplus humanity, Split off from the cycle of capital accurhulation that binds Israel to the rest of the world system. On this point, the imperatives of international capitals and the Israeli settler state happen to agree—though it would make little sense to imagine the genocide in Gaza as driven by purely economic motives.  Fueled instead by a combination of economic imperatives and deranged ethno-~religious fundamentalism, the genocide is a war of annihilation that attempts to empty Gaza of native inhabitants
by a combination of maximal mass murder and minimal forced ejection, after which the entity will convert the land into space—“a perkingot,” in the words of some American officials-—imagined  some as the future site of an Edenic paradise. But it is not clear whether ’ these fantasies of resettlement will outlive their ideological shelf-life: attempts by settler factions to enter the north of Gaza during the opening of the genocide were not enthusiastically endorsed by the state, for example; at any rate, the wholesale destruction and ecological devastation wrought by the military invasion will render any future resettlement in many places difficult if not impossible. To our understanding, 2005’s “disengagement” and the shift to Gaza’s Bantustan-liKe status sidelinéd"settlement aims in Gaza. The presumption that the settlement-driven wing of Israeli civil society and the annihilationist techniques of the Zionist military are in agreement on the long-term goals of the genocide assumes that an ideological agreement among parties suffices for a shared strategle visioh of the settler state’s future. We should not underestimate the political and cultural divisions that may lead the so-called Israeli Defense Forces (IDF) into a blind alley.  In occupied Palestine, then, we see a grim vision of the future: an increasingly ecologically endangered racial regime with a fascisiic white Pogu lation clinging to ifs consumption standards with a controlled rate of migration from racialized external populations, Some laborers are stuck at the border, while some are permitted entry conditional on their below-market-average employment and often backed into unthinkable labor conditions by their employment-conditional _visas. An internally immobilized, racialized population converted from labor surplus to mere obstacle—now facing genocide as punishment for a refusal to be penned in and killed at will. Economic forces alone do not explain the zeal with which Israelis are liquidating their neighbors; the murderous, - settler-colonial ‘ideology of ~Zionism provides a visceral and emotionally charged political identity through which the aggressors in a century-long genocide, armed and stupported by the Tost powerful nations in the world, hay view themselves as underdogs and victims as they mete out the very atrocities they accuse their victims of perpetrating.  After decades of repression and slaughter, what remains of revolutionary resistance in Palestine? Since October 7th, Fatah, the largest group within the Palestine Liberation Organization, has rerained silent, as its goal of peaceful compromise with America and the Zionist state has failed. The Marxist-Leninist Popular Front for the Liberation of Palestine (PFLP), historically the voice of the Palestinian revolutionary left, declined in the wake of the collapse of the Soviet Bloc and, more lm%ortantlfi, since Israel split 9ff Gaza from anything approdching a labor market integrated into its national economy. In the gaps left where historically secular nationalists and communists stood, Islamic resistance Eroups like Hamas have surged in popularity. Like Fatah, Hamas Ras always
been a free-market, nationalist, capitalist party: it raises its funds through heavy taxation, and its wealth lies in investment portfolios held primarily in Turkey and the Gulf states. It has risen to power as the floor fell out from under the conditions that supported the old vehicles for struggle and as every other path of resistance has been met with extreme repression. It is not, however, the only participant in Palestine’s armed struggle- October 7th’s Al-Agsa Flood was planned and executed by a coalition of armed organizations, and subsequent demands by spokespeople of the Palestinian reSistance demanded the freedom of non-Hamas political leaders as well as Hamas affiliates.  Last Januagy, the New York War Crimes ran a fascinating piece exploring “The Black Liberation Movement and the Struggle for Palestine.” The paper translated a statement by Abu Ghassan, the imprisoned Secretary-General of the PELP, which proclaimed “[f)rom inside the occupier’s Ramon prison” that from “Ansar to Attica to Lannemezan, the prison is not only a political space of confinement but a site of struggle.” Throughout the wave of encampments, these functional ties between American and Israeli police and prisons have been emphasized rhetorically by many activists. However, the issue’s politicization has often stalled in identifying a_common enemy instead of entering into the conditions of struggle that unite and separate Gaza from places like the South ide of ERicago.  ‘The lessons we might learn from the Palestinian resistance require translation into our domestic conditions, which is not to say they’re the same. For instance, while Palestinians have been severed from Isracli labor markets nearly entirely, the continued  et precarious employment of Black proletarians on Chicago’s  outh Side, while they are at the same time managed, killed, and caged, indicates their fragile relevance to domesti¢ individual capitals outside of the prisons has not yet run out. In an mcreasmgg/ interconnected world, the same system metes out death and devastation to thése geographically separate populations. It will only be through comrmon struggle across these and many other lines of globalized class stratification that we can decisively defeat capitalism. The question is not “Where to begin” because resistance is everywhere. The question is: “How can this resistance be generalized, clarifying in the process its enemy and the “we” who oppose it?””  In America, as in Palestine, struggle is defined by the contradictory character of the people and groups who make it. The political limits of our times are the limits of the class fractions who command and system-level restructurings that define the terrain for the movements we enter_into—in Palestine, the decline of the revolutionary left and the rise of liberal-religious armed struggle factions following the Zionist state’s slide into crisis-ric EFE!’] restructuring. In°America, similar economic transformations deformed rebels into a new category: the activist. In the 1990s,
following the twilight of the workers’ movement and whatever had existed of a revolutionary left, people adopted a model of political struggle to match the time: ’the corporate campaign, in which depoliticized participants accidentally united around short-term tactical questions related to fighting an individual corporate entity, absent a broader transformative vision. Most famously, environmental activists around the turn of the 2ist CEnlurK adopted this model, and it has more spectacularly re-emerged wit] Palestine Action’s sabotage campaigns against Elbit and the PYM’s #maskoffMaersk campaign. Its foundational assumptions also define the basic organizational unit of the campaign for the boycott of, divestment from, and sanctions on the state of Israel. Piecing together the mark of this_organizational form on ‘campus activism’ will help clarify the limits and potentials of the campus- based struggle for Palestine.  II. Bring the War Home  While the U.S. wing of the movement opposing the colonization of Palestine predates the state of Israel itself, it suffered a lull after the defeat of ts proponents in the Black Power movement during the 1970s. Flurries of activity briefly punctuated this overall decliné in_action’ and consciousness in Solidarity with the Palestinian struggle in 1982 in opposition to the Israeli invasion of Lebanon and, to a lesser extent, in 1993 following the betrayal of the First Intifada through the Gslo Accords. In the early 2000s, when the anti-war movement in the U.S. connected with the Second Intifada in Palestine, this movement experienced a wave of new organizing that would prove more durable than previous iterations— particularly on college campuses.  In 2002, the previously marginal Students for Justice in Palestine (SJP), founded in 1993, saw an explosion in its membership, spreading to campuses across the U.S. SJP inherited from the 19905 a strongly decentralized structure designed to allow for political work atong a deeply poliically divided constitdency (analyses of the state of Israel as a settler-colonial apartheid state, or of the two-state solution as a dead-letter cover for worsening settlement of the West Bank, were still hotly contested within thé movement at that point). This largely uncoordinated but ultra-visible activity of Palestinians_and anti-Zionists on campus had provoked a reaction from Zionist politicos and funders: students founded several new Hasbarist organizations with explicitly campus- focused missions in response to pro-Palestine student groups. Building on this work, the David Project waged a ruthless fight against anti-Zionist scholars starting at Columbia University in 2004, On the other side, in 2005, a coalition of Palestinian trade unions and civil society organizations released the call to Boycott, Sanction, and Divest from those responsible for the ongoing ethnic cleansing of Palestine, providing the fledgling student movement with a unity of purpose which persists In the movement today. Within a few  years, campuses had become the centrai
battlegrounds in the ideological fight over Zionism and Palestinian self-determination in U.S. clvil society.  SJP’s influence, and that of the BDS Movement, only grew in successive years as Israeli politics lurched to the right, producing multiple new offensives on Gaza. Since the start of the Secon Intifada, no student has completed a_4-year course of stud without’a Significant incursion by Istaeli Occupation Forces (I0F) into Palestinian territory and an accompanying massacre_of Palestinian civilians. In this context, BDS has proven remarkably effective at shifting popular consciotsness around the Palestinian struggle and laying the groundwork for the current outpouring of anti-Zionist resistance. This conjuncture has _produced ~an overwhelming political shift, particularly on campuses, where large majorities of constituents were young enough not to have bech politicized during an earlier period of hardened pro-Israel hegemony, with more obvious localized stakes, targets, and dernands of the struggle for Palestine.  Meanwhile, the past decade of campus activism has proven inseparable from the growing realization within American civil society that its history, culture, and state are bound up in a white supremacist labor regime that condemns whole strata of its population to unyielding misery. Student critics of their client universities _are increasingly encouraged to articulate their grievances in the theoretical registers of settler colonial studies and the Black radical tradition. It is thus unsurprising that the movement of the encampments captured the imagination of the US. left and saw some of the most militant, most advanced confrontations with the state since the 2020 George Floyd Uprising emerged on college campuses. It is no accident, moreover, that this most fecent wave of struggle was born at Columbia University —the site of the David Project’s first anti-tenure campaign and the hotspot of the anti-Zionist struggle for a generation—of that it has begun to articulate its aims in continuity with domestic struggles against the police. The campaign for boycott, divestment, and sanctions has gradually migrated outside the University with its  raduates: those industrial sectors most impacted by pro-  alestine labor organizing since the start of the current genocide in Gaza—education (pre-K -1 and higher ed), healthcare, nd tech— ate comprised of College grads, many of whom were themselves involved in Palestine orgarizing.  As significant as these adyances in popular sentiment have been, we shiould retain a sense of perspective: After nearly two decades o campaigning for divestment at campuses across the country, only a few minot holdings have divested, and the explicit political horizons of the movement have remained narrow, hemmed to the BNC’s nonviolent pressure campaign. The movement’s life beyond its campus-based origins has beeri confined to the sectors of the middle class that itS college-educated participants left their universities to populate. Repression of the pro-Palestine student
‘movement and its allies has only worsened. And at the level of the state, a seismic shift in popular consciousness finds politis toda with a tiny mmon!&/ of milquetoast liberals—the likes of whicl Eppulgted the U.S. Congress in scores during the 1970s—while a  ipartisan Zionist coalition has pushed forward increasingly more draconian measures at all levels of government aimed at défanging the BDS Movement’s push for university divestment before it can score a single sizable win.  These measured successes bear the marks of their origin in a similarly-circumscribed political scene: campus activism, which, aside from being undercut by the routine churn of participants as classes graduaté and non-tenured professors face reprisals for involvement, fosters a characteristically managerial political environment. Many of the drawbacks of the traditional “SHAC model” pressure campaign apply even more emphafically on campus. Participants exert only consumer-side leverage over their uPpDnems, Dr%amzers understand themselves in their ca?aqlly as students and formulate their political commitments relative to visible university administrators, not even the ruling boards of trustees; political education tends to stall out at Holding the university’s actions up to its supposed values as if the demonstration of a contradiction between the two is itself a victory; most importantly, a persistent gap separates a bloc_of organizers who plan_to merge their “student activism” with careers to come, and the organizers whose political horizons exceed their future job applications. Such a gap flows from the focation of universities in fhie reprodtiction of capital and American culture: students pay (or are paid for by the institution) to invest their _post-graduation labor power with specialized skills and accolades that will grant them’a seat in an unstable middle-class, with one foot on either side of the capital relation. Far from pushing students to undermine_their. class position, this— combined with the precarious situation of the sectors of the middle class into which they’d like to enter—tends to silo them off from recognition of their impending proletarianization.  This unstable combination turns student organizing into one of many sites at which a new proletarian self-understanding might emerge as downwardly mobile university attendees stumble into confrontations with the state and capital, both anxious to shore themselves up as the present crisis deepens. But this requires de- exceptionalizing any student activist campaign, removing it from its elite trappings, and attempting to bridge campus polifics with other strugglesin the surrounding area, if not the world. For instance, a chant in our movement notes’that police are “Israeli trained”} many involved in the struggle for Palestine point to university backlash to demands for divestment as proof that the movement winning its current demands would fundamentally destabilize the existing order, itself imagined to be ideologically Zionist. This conception s false—and frankly, whether administrators care one way or another about the state of Israel has
nothing to do with the uniformity of their responses to divestment campaigns. Bt a movement that undetscores the complicity of American civil society institutions in the genocide in Palestil pulls on a loose thread that could exhibit, if followed, the Inseparability of all of our struggles.  An_inventory of any given university portfolio—and a full explanation of why American police train alongside their Israeli, Chinese, or Indian counterparts—would offer Student activists a cross-séction of a world system in which international architectures of state repression protect a transnational capitalist class that is increasingly conscious of its short-term necessities, all of which will prové incompatible with the life of the world’s poor. To date, American labor has not risen o the May Day emands of the Palestinian General Federation of Trade Unions: an end to American manufacture and transport of weapons to Israel, reflected in trade union policy; a material campaign against companies_participating in Istael’s genocide in Gaza, and a complementary campaigh aimed at the United States government. The radical edges of disparate social movements and trade union campaigns have attempted to meet this practical minimum.  Last month, radical rank-and-file in the University of California schools publicly broke with the pressure-campaign political horizons of their UAW local, attempting to push beyond trade union consciousness and legally circumscribed tactics:  Rank and file union members have demanded elected UAW leadership... follow through with concrete action, and leadershij has ignored this call to action. To this point, the Rank and File collective is calling for [...] the collective withholding of labor in support of Palestinian liberation. We are not interésted in the dictates and boundaries of the ULP strike, as we challenge its basic premises and assumptions... [W]e see it as a moment [to] begin to effect a substantial material impact against both the Zionist settler-colonial entity and the Amerikan racial capitalist- imperialist state.  Consternation from those willing to tail the social-chauvinist majority in the trade unions misses the trend embodied by this unlikely statement: the UCI radical Rank and File’s expansion of the political horizons of the Palestine movement fo include confrontation with the American state is part of a broader escalation of the strategic stakes of the movement itself. Throughout the country, counter-info sites and communiques suEply agrowmg list of autonomous actions that have matenallé subverted occupation, domestic or Zionist. The NYC-base organization Within Our Lifetime (WOL) has likewise begun to tie the liberation of Palestine to domestic struggles against Cop City, from Atlanta to New York and beyond. WOL has taken shape alongside Columbia’s deeply politicized and dedicated SJP chapter, Which has remained a NOTLiT STar of the mOVement since Proving it
heroism in the Columbia occupation, In the year to come, these true leaders of the Palestine solidarity movement have the opportunity  to facilitate increasingly _interconnected, experimental struggles agalns the white supremacist ruling bloc of global capital. And those of us in Chicago and cities like it, where the movement has been demobilized and reduced to perfunctory marches and symbolic acts of speaking truth to power, must take note.  II1. The View from the Lawn  Following the Al-Agsa Flood and Israel’s immediate ground invasion and bombing campaign of Gaza, political action surged globally, as both Ziotist and pro-Palestine crowds mobilized to emonstrate in streets and squares around the world. Specifically in the United States, while organizations held demonstrations in most large cities, the movement gained notable momentum on several university campuses, initially at major private universities like Harvard, N ahd Columbia. In the months to follow, a sustained campaign of doxxing began against pro-Palestine student activists from Zionist groups ke Canary Mission and the vaguely fitled Accuracy in Media, tarring them as antisemites and calling for firings, as well as investigations into antisemitism on collegé campuses by the schools, the FBI, and the US Department of Education as violations of the Civil Rights Act; investigators began looking into Islamophobia on campuses on the same basis.  On April 17th, 2024, students at Columbia University placed about seventy tents on a campus lawn, claiming the space as a “Gaza Solidarity Encampment.” Despite being cleared quickly, the practice caught on at campuses across the country, with students at over 130 campuses creating encampments_since. Currently, these have all been voluntarily dismantled or dismantled by the cops, with varying degrees of police violence at each; the photographs and videos taken of cops at Ohio Staie University, ndiana University, Emory, Columbia, and UCLA, to name a few, speak for themselves.  on_April 25th, Chicagoland had its first encampment at Northwestern Universi in Evanston. Excluding one initial confrontation with the police, the camp was incredibly peaceful and inoffensive, It ended in capitulation after five days, with the university granting some symbolic victories in return for an end to what minimal niisance the camp presented. By the time Northwestern’s _encampment had _ended, the University of Chicago’s had begun, and one formed at DeFaul University shortly after. DePaul’s encampment lasted the longest in Chicagoland, going a little over two weeks until the Chicago Police Department Faided it; we hope participants from these camps are taking similar stock of what specifically went down at each.  Organizers originally slated the University of Chicago Popular
University for Gaza for the morning of May 1st on the university’s Main Quad, This relatively late daté was in line with the national SJP network’s “Popular University for Gaza” campaign, which had pointed to May Day and graduation days as specific dates for calls to action when national $JP first launched it on Sunday, April 21, But given the urgency of the moment, the very announcement of this ‘campaign became the green light for encampments and occupations, with the specifics of timing left to the judgment of local organizers. Unprepared for immediate deployment, our plans grew around the May Day launch more than a week away, as we saw ¢ach day more images of dramatic scenes coming out of the campuses that were quicker on the draw.  Our campus coalition, UChicago United for Palestine (UCUP), elaborated plans for the encampment throughout several drawn- out meetings. As an umbrella of several student activist organizations, UCUP comprises such a diverse cross-section of the conscientious’ part of the student body that it defies neat dESCrlpllon. At the same time, the initiative and tempo of the coalition and its constituent groups are firmly in the hands of a relatively small number of Student organizers operating in a readily identifiable way. When a clear éncampment leadership body called Core eventually emerged, this small but effective cohort of political moderates would take control of representing the encampment publicly and eventually succeed in pushing theit rivals away from decision-making.  This moderate bloc consisted of budding career activists and social ‘movement managers who were “incubated” by the professionals of long-standing ~networks of activism-oriented NGO, philanthtopic _foundations, and other  liberal advocac  organizations that double as tax shelters for the ultra-rich an  wotk assiduously to marginalize revolutionary challenges to capital and the state, Tt scems a large part of Such “organizer training” is how to take power and hofd ohto it for reformist ends, even in settings that pretend to practice direct democracy. We will call this element of Core “the careerists” to distinguish them from the radicals who participated in Core, who we canse to respect and admire, and who were unfortunately marginalized.  If asked to define themselyes, the careerists would likely start by placing themselves in 2 long, tradition of student acivists o Campu and in the wider Hyde Park area who have worked to advocate and raise awareness for unjust university practices and priorities. While this tradition certainly includes political radicals fiartlcularly the cohort that went through the George Floyd  ebellion, the turnover rate inherent to the university keeps this tradition ‘generally abstract beyond the immediate people one meets, with s actual upper limit being those students about to gradudte when one first arrives. This Tack of concrete tradition Creates a sustainability problem, as the institutional depth required to maintain the organizational capacity to consistently
act_politically radically depends on the current cohort’s backgrounds and lives outside the group more than it would otherwise. Thus, when most of the cohort is timid or just goin through the motions, it is an easy justification for extern Brotesslonal nonprofiteers to step in as mentors and shape them in he image of their abstract activist ideal. While the more conscious careerists may abstractly identify one way, many of their concrete traditions primarily exist off campus.  While we met individuals within the central decision-making body with intelligent and courageous analyses and proposals, the IModerates oatmaneuvered them in lengthy bureaucratic meefings. In response, the frustrated radicals defected from the central leadership in the ones and twos, skipping general assemblies and backing away from the camp. Others volunteered for necessary functions like kitchen work, and this division of reproductive labor removed many voices from participation in decisions. In a crucial ‘missed opportunity, we and other radicals never formed a coherent opposition bloc “or fought to marginalize the emergent inexperienced leaders disinterested in keeping the camp going.  The careerists, often as meeting facilitators, successfully framed discussions of the planned encampment around the dominant theme of “safety.” They schematized this according to three color- coded roles: Red, Yellow, and Green, which campers initially understood to mean levels of risk of arrest, with red roles facing high risk, green (entirely of -site) facitg none, and yellow somewhere In between. Going over these roles took up the lion’s share of discussion it general camp-planning meetings. This dominance is_partially because independent ‘working_groups coordinated plans for other practical concerns such as food, supplies, cate,secuity, and the zero-Tour deployment plan, But hindsight, the seeds of dividing the camp with the ideology of “safety” ’and marginalizing those who sought to build a threaténing occupation were in place from the beginning.  Nonetheless, this would have been difficult. The encampments represented ‘an act of commoning, building shared spaces_for living, thinking, and experimentirifz with politics together. The history of capitalist modernity is the history of commons being violently erased from the earth—including, as scholar Peter Linebaugh has argued, in the current genocide in Palestine—and replaced with societies where the bounty of the Earth and the life that populates it, have value only insofar as individual people, whaose hoarding and laying waste to life is the foremost expressiort of their individual “ight can buy, sell, pollute, and ultimately destroy it. Most of us trace our polifical awakening to moments of collective political action when the sel-defeating egoism and alienation of capitalist society temporarily break down. A new sense of the possible s opened up by the bold and decisive actions taken by hitherto anonyinous people, opening the possibility for new values and ways of living. In recent years, the formation of
commons as a response to austerity and social crisis, no matter how fraught in practice, has revealed a deep need for community and belonging in a world hostile to it. The challenge facing those who related to the camp as an instrument to manipulate toward cynical ends lay in the powerful collective energy that emerges when masses of people experience that another world s viscerally possible:  As highly publicized occupations and confrontations unfolded across several campuses during that last week of Apri, the sense among us that our coalition was unduly hesitating generated some anxiety. However, the highly siloed planning process meant that the original launch date Rad considerable inertia behind it. It was only due to amole that plans changed. On April 24, one week before the original launch, ieaks from the main encampment Signal chat were published by the Chicago Thinker, a right-wing student newspaper. As many participants in the chat had also béen using their real names, panic broke. Participants nuked the chat, and a more trusted core built a replacement and moved the launch date to Monday, April 29.  Monday, The launch of the encampment met no snarls. About two dozen of us, tents in our bags, were to mill around casually on the Main Quad’and wait for the signal: campers carrying the large apartheid wals from an earlier SJP art installation i (rom the street. Then those of us with tents would set them up all at once, while everyone else in the vicinity would be on hand to get between the tent-builders and any interference. All of this happened according to plan and without any confrontation. Though acting quickly on a well-coordinated and instantaneous signal was certainly an advantageous move, it was likely the leak of the original launch date and our change of plans that misdirected the campus police: the Hyde Park Herald later quoted a UCPD Tieutenant saying: “We weren’t expecting this until Wednesday.”  Within a few hours, the encampment expanded to cover much of the western half of the Main Quad. Most of its footprint consisted of sleeping tents, initially arranged haphazardly. The food tent was centrally focated next to the central walkway, blocked off at both ends by the apartheid walls. Meetings and prayer occurred in an open space near the food tent. On the southern edge of the camp was a welcome canopy, a medic tent, various supplies tents, and an art build area. A short fence separated the camp from the central Quad wallaay, soon adorned with art rom collective “art builds,” where campers painted items of camp defense like perimetér barricades in a festive environment. Two autonomous zine distro tables had quickly sprung up in g central area and distributed ‘mostly insurrectionary anarchist zines and stickers, including an impressive collection of first-hand accounts dnd strategic reflections on unfolding encampments across the US, Campers als set up a lending library of mostly Palestine-related books in the same area.
The presence of such unapologetic revolutionary literature in a central location caused some consternation among leaders of the encampment; It did not help that the distro-ing anarchists arrived and remained in full black bloc attire that readily marked them as radical outsiders. In_the end, they dissuaded the concerned organizers from making any iritervention as long as the distros were clearly labeled as “autonomous” so as not to be misapprehended as the authorized voice of the camp. They remained in_their central location and were the only people distributing literature throughout the encampment, apart from the occasional wayward Spartacist or stalwart disciple of Bob Avaldan. UCUP had planned several days of programming, which went ahead according to schedule, These evenfs included guest speakers: Bill Ayers of the book Fugitive Days, local DSA Alderman  jyron Sigeho-Lopez, and speakers from Jisoot, the U.S. Palestinian Community Network, and the South Shore community organization Not Me, We, alongside teach-ins, workshops, group discussions, and musical performances.  However, after several days had come and gone and the pre- planned programming had been exhausted, the opportunities for political - education “increasingly became spontaneous and perfunctory. Some events amounted to little more than a ritual for speakers to talk to a crowd. As for the teach-ins—whose topics ranged from Medical Apartheid in Palestine and Jewish Anti Zionism to the 1968 DNC Protests and the Occupy Movement— guly time will tellIf they were effective in reaching new audiences, The ad-hoc nature of their organization, especially as time went on, was a casualty of the unsustainable system of feminized reproductive labor in_ the camp and contributed to a missed opportunity for a coordinated political education strategy aimed at broadening support for the movement among the curiotis students and community members wandering througfi the camp.  The general assembly proved the most available check on the careerists’ thetoric and power. Typically held twice daily, the general assemblies presented themselves as important decision- Thaking bodies for sundry practical matters surrounding the encampment, especially the impending threat of attack and eviction. These were the main touchstones of the collectively organized life of the camp, where we had the opportunity to voice our opinions, hear each other’s thoughts and concerns, and offer proposals regarding the encampmentand its irection, They were also where thie student negotiators presented their updates on the negotiation process with the UChicago administration. Facilitators invited attendees to brainstorm strategies and tactics and provoked interesting political debates.  However, these meetings were primarily facilitated by the careerist$ and those they trusted. Their orientation and mode of thinking were most often along the lines of liberal professional activism. Despite the appearanice of deliberation, we noticed
immediately that these careerists considered the assemblies to be transmission belts for decisions they had already made behind closed doors earlier in the day. When attendees took the assembly serlously and presented alterhative political visions, the careerists met them with jeering hostility, shopworn privilege baiting, and whispers of “outside agitators,”  “horizontalists,”  and “anarchists,” which were sadly enough amplified, we learned, by purportedly’suppartive faculty members on the UChicago Facilty for ‘Justice in Palestine listserv. The extent of these faculty ‘members’ roles in limiting democracy within the encampment is a story that largely remains to be told.  ‘The general assembly form, of course, lends itself to inaction. As challénges mounted, the careerists effectively ran out the clock each day. Nonetheléss, the problem remained that they were increasingly out of step with those in the camp who took the encampment’s goals seriously, namely that we wouldn’t leave until divestment, As members of Core began to break ranks, we learned that roughly half of them never wanted the encamprment. Encampments onl other campuses had effectively forced them to take action lest they appear insufficiently dedicated to the cause. Once the tents went up, they immediately began plotting a  fied exit. But as the encampment wore on, an increasing mass of Its rank-and-filers took this rhetoric seriously and planned to defend the camp against eviction and escalate the action toward winning its stated goals. Thus, as a powerful bloc within the encampment’s self-prociaimed eadership quietly advocated for its demise, a growing number of us made the facade of a pro- Palestine encampment into a reality.  Tuesday. The camp continued to grow, with students and community members arriving to spend time there, whether just for the day or to sleep overnight. More politicians came, and more faith leaders preached and fed services. The camp remained on the western half of e quad but expanded unevenly, Rectangulat pieces of plywood appeated that were enthusiastically painted and assembled into shields.  Core called a morning general assembly, asked campers to sort themselves into “high” and “low” risk roles, and then separated Beople into separate meetings. Core facilitalors began by asking he high-risk roles on the camp’s first full day what concessions would"be sufficient for them to go home. Many of us echoed different aspects of the “Disclose, Divest, Repair” demands released when the encampment first went up, indicating our unwillingness to leave without achieving at least one of these demands. In response, the student leaders said they would stay until_divestment and disclosure. Many of the rank-and-file ‘members of the encampment, ourselves included, took them at face value and echoed their willingness to fight until the end. One point of agreement between our two separated groups was that we wished to avoid at all costs the weak compromise that led the
encampment at Northwestern University to self-destruct.  After this meeting, some campers moved the large walls from the middle of the walkway to a more obstructive position until they were stopped by appointed “marshals” and moderates within the leadership. At that point, they had already done the deed and moved the barriers. This pattern continued to play out throughout the encampment: a minor “escalation” (if one could even call it that, considering the kind of tactics displayed on other campuses) would occur, be str)?‘ped then it would have already happened to enough of a degree that they could not take it back. A few careerists also wasted time condemning acts that had occurred overnight, from graffiti callmglon the encampment to “Escalate for Gaza!” spray painted on buildings to the ripping down of a string of Israeli lags, which led to the individuals allegedly involved being ‘harassed both by cops and camp marshals. There was a consisten knee-jerk response among a small cohort of self-styled leaders to throw anyone to the left of them out to dry as a gesture toward the UChicago administration that they were the "good protesters” who they could trust with a seat at the table.  Meanwhile, the camp marshals, who were technically there to keep campers safe from cops, Zionists, and other creeps, proved to be less interested in protecting the cmp~as seen in their inability to stop arrests or intervene in real moments of conflict between the encampment and UCPD or Zionists—and more about mandatiny “acceptable” forms of protest within the camp. Their suppose authority also confused the camp: when people spotted a marshal funning somewlre, people followed then, assuming support was needed, only to find the marshals concerned with scolding another unapproved “escalation.”  After nightfall on Tuesday, the large camp speakers that had played music for a dabke teach-in only moments before were switched to WKCR 890, Columbia University’s student radio station. The cheerful aftérglow from the dabke lesson quickly subsided as we gathered around to listen to WKCR’’s live reportage of the brutal police raid on the Columbia protestors oceupying Hind’s Hall. The Wave of student encampments began with Colimbia, and as we glimpsed images on Twitter of the enormous BearCat the NYPD tsed to break through the hall’s second-floor windows, the bravery of the Columbia protestors was both a call to action a3 well as an example of the forces of the state arrayed against the encampments, Chronicling_the _difficulty of  the ~UChicago encampment in answering that call—with all the attempts and fitful starts—is one of the reasons we decided to write this.  Réit%?s’? Afraid of Outside  A crucial attribute of the UChicago encampment’s tepid answer to the call of history is the lack of support or involvement from the
Hyde Park/South Side community. In_these early days, the encampment_was established and maintained thanks to_the courage and determination of many, including a plurality with no formal affiliation with the University of Chicago. The camp’s food and supplics came from a network of community members, many with no UChicago affiliation. Core put out calls for as many people as possible to travel to the camp and put their bodies on the line when the encampment was threatened by fascists or cops, regardless of their connection to the school. The crowd cheered as speakers a ralles celebrated the diversity of the encampment and the necessity of community beyond UChicago joining in the struggle. Although these organizers, in line with others across the country, professed a desire fo break down the boundaries between studentS’ and community members, several incidents demonsirated their inabilty and umwilingness to’protect non- students.  Beginning on Tuesday, UCPD arrested, detained, or otherwise harassed community Thembers and students, as cops targeted them while they were leaving the immediate circle of the camp and picked them off, either on the perimeter of the quad or while passing through’campus elsewhere. The lack of a culture of de- arrest and lingering deference to cops meant that though the organizers of the camp professed the desire to erase the boundaries  een campus and community, the burden of police violence was still felt most heavily by Black community members.  Moreover, while UCUP made some overtures to_activists and organizations on the South Side for their participation in the Encam[:mem, it did not unite the strugglg for Palestine Wl!h lh‘ell’ struggles once they arrived. The opposite occurred: university police harassed them, camp leaders snubbed them, participants shied away from them, and they went home with the correct impression that this motement wanted nothing to do with theirs At this moment, a gap between the encampmentas a cultural space (an exciting time t6 sleep on the lawn and defy administrators) and the camp as a political project (a struggle in solidarity with the world’s poor) widened.  The same myopia that prevented these student activists from ‘making the necessary connections between the struggle in Gaza and thé war at home would culminate in a fatal obsession with the unnamed, unseen, yet all-knowing and manipulative outside agitator. Used interchangeably with “anarchist,” It became a liberal synonym for “mean person who disagrees with me,” as we saw it indiscriminately applied. to UChicago studenlts’ and community_supporters alike. With the apparent support of Chicago facull, careerists consistently “deployed s curse against those who disagreed with the careerists, including those who simply demanded democratic decision’making at_the encampment. It is, of course, a dirty political trick. Since at least the anti-slavery’ movement of the nineteenth century,
mismanagers have used the outside agitator trope to divide people fighting for liberation. During the George Floyd Rebellion, this {7pe formed the basis o the argument that appressed peoplelmust be guided by some nefarious unseen hand because they lack the courage and commitment to fight back on their own. Similarly, Zionists often suggest that Iran, ISIS, and other outside agitators are secretly steering the entire Palestinian resistance rather than ihe courage and fnifative of the Palestinian people. It was doubly offensive to find the careerists and UChicago faculty members spreading rumors about “outside agitators” running amok in the encamprent, populated by dedicated activists willing to. put themselves on the line for a free Palestine.  While the shameful history of the outside agitator trope is well known, the particularities of the radical scene in Hyde Park cast it in an eben stianger light. Given [IChicago’s relation to the South Side, both in terms of the administration’s underdevelopment of Hyde Park and Woodlawn, as well as the “radical” elements’ dependence on local organizing groups and campaigns for training and support, this chatacterization of community members as anarchic_strangers mindlessly wreaking havoc from campus- affiliated organizers s not just ironic and misguided, but a betrayal of the very same principles ostensibly espoused by these radicals community and solidarity.  In this context, the term “anarchist” became a flexible signifier, conveniently déployed to distance any problematic or frigltenin individuals from the collective life of the camp: one reportbac] recounts that UCUP withheld community support from a “Black Southsider who was attacked on_the quad,” with marshals explaining “they’re one of the anarchists.” The activist politicking of the loudest careerist members of Core, its authors argue, stoo directly in the way of the realization that Hyde Park “is a gentrified neighborhood because of this filthy campus. These rich kids and outof-state attendees are part of the reason police so heavily penetrate the south side. Anytime UCPD harasses somebody within the boundaries of Hyde Park and the surrounding neighborhoods, itis a student’s problem.”  Past cohorts of student organizers understood this. In 2016, a student group that campaigried for the trauma center in the South Side wrote ina reportback:  Ourorganizing on campus has been unique because of our concrete allyship with people who are most affected by the lack of a trauma center...we have supported [the campaign] by organizing students on campus and directing as many University resources as possble o yourg Black organizers...  ‘The extent to which student organizing on this campus had been successful, whether regarding the Trauma Center campaign, graduate unionization, of the occupation of UCPD’s police station
lobby in 2020, was directly correlated to the degree of involvement from outsidefs, here defined as people who were not university employees or students. Regardless of affiliation, these were people directly impacted by Uchicago’s policies and policing who were willing to fight, Indeed, “we are caught in an inescapable network of mutuallé{," wrote’ Dr. Martin_Luther King, Jr. from his Birmingham cell “tied in a single garment of destiny. Whatever affects one directly affects all indirectly. Never again can we afford to live with the narrow, provincial ‘outside agitator’ idea. Anyone who liveg inside the United States can never be considered an outsider.”  ‘The parochialism of the careerists within Core extended further than’ the ordinary baiting of outside agitators to their very understanding of the gerocide in Gaza itself, Early in_ the encampment, we began Rearing the portmanteau “scholasticide” almost constantly. Coined in 2009 by Dr. Karma Nabulsi of Oxford University, this concept helps us make sense of the deliberate targeting of Palestinian educational institutions by Israeli forces as part of a genocidal effort to erase Palestinian culture. It can be a  elpful concept when situated within the multiplicitous facets of Israeli genocide. But as the week wore on, we heard more and more about Scholasticide until it seemed like this was the only thing ‘happening in Gaza. The reason for this, we discovered, was that the careerists defined the UChicago encampment and its participants by the distinct subject position of the elite scholar. At a time when millions of people from countless backgrounds and occupations were coming_together all over the world in powerful mass demonstrations against Israel, they framed the whole encampment as a matter of elite academics taking action on behalf of academics. Instead of allowing the university to be a site of more generalized struggle, they upheld the social division of labor and focused on their career paths.  Itisnotan exagfieratiun to say that some careerists hung the entire occupation on the concept of scholasticide. As negotiations stalled and general assemblies became increasingly contentious around uestions of tactical escalation, one prominent careerist argued that the strategic horizon of the camp should be as follows: Negotiators should insist that the university “acknowledge the scholasticide in Gaza.’ If the university does not budge, Core should prepare to cooperate in the camp’s eviction by the police. The outcome of the camp, this organizer argued, would be a victory: the “media narrative” In which® thé “UChicago administration refused to acknowledge a scholasticide.” When asked what media outlet he thought would care enough about this issue to frame it this way, Desides the UChicago student newspaper, the organizer grew quiet. To make matters worse, this was a sidebar_conversation when this same organizer publick avowed that the encampment would stay until divestment. Anq even if he had succeeded in the plan to throw the whole camp away on the “media narrative” of “scholasticide,” nobody knows what
that word means anyway.  “Modern capitalism’s spectacularization of reification,” wrote the Siluatiunislgntemalional, “allots everyone a specific role within a general passivity. The student is no exception to this rule. [Theirs] is a provisional role, a rehearsal for his ultimate role as a conservative element in the functioning of the commodm{ system. Being a student is a form of initiation.” Any serious challenge to the society the university thrives in must begin by rejecting the particular identity of the university student or worker confinéd to the parochial concerns of the ivory tower and removed from the world’s toil. By forcing the definition of the camp within such narrow parameters, the careerists sought to fix the definition of the camp in the same terms as the capitalist managers of our sodiety do: keeping stuggles siloed off from each other and keeping their participants’ under expert control. An effective ‘movement must consider the university, or wherever else struggle kicks off, to_play no privileged role in the global movement, especially with regards to its specialized status within thé capitalist division of labor, and to be instead the accidental location from which people can launch a much more generalized struggle, breaking down all walls that divide us in the process. In short, So- called academics must abolish themselves.  V. Core and Periphery  Wednesday. With Columbia’s tear gas and broken windows fresh on our minds, the murmurs of defénse and autonomy grew more strident. In addition to the raid of Hind’s Hall, videos of the attack on the UCLA encampment by Zionists aiding the police and the attempted raid on Cal Poly Humboldt demonstrated the threats encampments faced. The threat of police violence became even more pressing when the Dean of Students, Michele Rasmussen, threatened the encampment representatives with a police raid UCUP had_denjed responsibility for the graffiti, so this was evidence that “outsiders” had entered the camp; allowing the university administration to claim “safety concerns” as an excuse for dismantling the encampment altogether, Ironically, the penchant of the careerists to red-bait theif political opponents in the name of safety was putting us all in danger. In response, student negotiators demanded amnesty for the negotiating Tepresentafives, postponement of a police raid on the camip, and a direct meeting with the President and Provost with spectators and a faculty advisor.  However, the rank-and-file’s idea of defense was far more active than the conciliatory horizons advocated by these negotiators. Community members had erected more fences and barricades through Tuesday night and Wednesday morning. Unfortunately, moderate busybodies moved them back o uprootéd them by noon. Amongst that day’s offical carmp schedule of teach.-ins and allies, two shhield trainings happened directly under the noses of thesé
careerists. Those involved with coordinating them did so beautifully; someone simply slid up to a hot mic; asked to speak, and told people a “crowd safety” training would be happening, at which people practiced defense drills, formations, and maneuvers with these mobile barricades.  ‘The shields, mostly particle boards colorfully decorated during the previous day’s art builds, would become a significant point of contention between the camp’s rank-and-file and the careerists over what it meant to take seriously the oft-chanted mantra “We keep us safe.” Indeed, the controversy they would generate contains the dynamics of the entire encamprent in miniature. Many comrades, particularly those with experience in parts of the US that have seen violent fascist street activity since at least 2016, considered it completely obvious that we would prepare shields and conduct training for using them in formation. Meanwhile, self-identified camp leaders and faculty members, with no street experience besides gloritied parades, were openly hostile to the shields and training throughout the week. We understood this dynamic as a token of the urieven dissolution of civil society in the  nited States. Many Hyde Park intellectuals who speals truth to power from the comfort of the most heavily policed neighborhood In the US, where most fascists are (hilariously enough) afraid to go, mocked the notion that self-defense amounted to anything moré than linking hands and presenting your bare forehead to your would-be attacker. Many of us have lived in o traveled to places where vigilantes brutalize and murder leftists: the careerist and faculty denigration of basic self-defense was a delusion born of extreme privilege.  Though everyone at the encampment saw the same brutal acts demonstrated against other encampments and occupations across the country, particularly at Columbia and UCLA, our reactions were sharply divergent. While the rank-and-file’s drive to actively defend the camp against the university grew in response to these events, the careerists in Core, formerly content to ride the encampment’s popular momentum until it died out, grew increasingly fearful of violent repression and, in turn, popular politics against that repression, which they didr’t quite Know how to wrangle. Their browbeating and crowding out of radical elements in UCUP had paid oft, and these careerists were now the faces of the movement at UChicago. However, it was increasingly likely that this movement would be associated With open and active hostility to the university and its response, extreme brutality. If the Gareerists were previously content with going home when things died down, it was precisely then that they began to constitute an active tendency that wanted to dismantle the camp: we refer to this tendency as the Surrender Faction.  After Tuesday’s conflict over the slight movement of the few barricades present, more tents pushed the camp’s boundar further northward. Light barriers and mesh fencing were erecte
around the North, East, and South sides of the camp in response to incursions by people détermined to harass participants, including a right-wing Streamer, constantly followed by campérs waving flags and kefiyehs int his face, along with fascist frat boys, uninged Zionists, and other obsessed sickos, Though campers held several “de-escalation” training sessions, hostile actors were previously able to walk through, the camp, because any kind of  arrier was initially deemed an “escalation” and thus out of the question.  Wednesday was May 1st, and a May Day march elsewhere in the ci had pulled many people away from the camp for the day. At general assemblies, the push for alternatives to Core gained steam, as campers advocated for working groups and a spokescouncil system to replace the shadowy decisigrts Core announced twice daily. By this time, a popular term circulating throughout the camp and the social media sphere around the encampment movement was the imperative to_pursue “escalation.” Unfortunately, this remained hazily defined, and even when concrete proposals were floated, such as the occupation of one of the encampment’s adjoining buildings, the case was never compellingly made for why we should undertake these tactics, or how they would move the dial forward in the struggle, besides the tautology that they would be an “escalation” and that would be good.  This is a self-critique as much as anything; we believed that the logical next step_was to take a building, and we advocated this position. But why? To what end? The most vocal proponents of this plansimply pointed out that itwas happening clsewhere. As people in favor of a revolution in the United States, we understand that deepening tactical militancy can be a good thing, especially as it helps cohere new associations of comrades who build trust while building comfort with risk and breaking the law. We could have ‘made this argument plain and won some people over. But the imperative to escalate remained ill-defined, almost an article of faith. What was missing was a coherent and communicable politics hehind all the escalatery posturing. In the end, the very idea of “escalation” even ended up being appropriated to mean doing nothing.  ‘Thursday. In the morning general assembly, Surrender Factionists presented aplan for endiri the encampment, Despite thebluster in the speeches that a handful never tired of subjecting us to, they just wanted to go home. They proposed to host a final Friday rally before disbanding and framed this as a “strategic retreat.” They also presented the Gaza Scholars at Risk program offered by the university administration; UChicago would offer temporary university status to a handful of Palestinian scholars to help them escape the genocide. Though they had notyet discussed or released full details fo the general camp, the Surrender Faction (ramed it as a win, For our patt, we considered it a hostage situation in which the administration made the lives of Palestinians and their families
conditional on the camp’s good behavior. Meanwhile, in the face of demands for “escalation” from the rank-and-file, some Surrender Faction organizers ostensibly agreed, then liberalized the demands by arguing that “being here is an escalation.” They added that what the university offered was good enough to settle.  Thursday was also the first day the camp negotiators, led by two members of Core, met with President Alivisatos and Provost Baicker. Though tho student negofiators declared to the President and Provost they could not make final decisions for the camp and would have to bring any proposals back to the final assembly, the exact details of the negotiations remained secret. The meéeting ‘minutes would not be released Eublicly until the encampment hac ended. At general assemblies, Core organizers shared highlights and selections of their meetings with the administration; despite Tequests to create a negotiation working group to involve the whole camp, none materialized. Thursday also marked the concrete appearance of the Surrender Faction, with an anonymous student ‘negotiator stating, I don’t want thi$ encampment to go on much longer becauise what we have seen across the country 15 scary and disturbing to me.” While this was happening, members of the encampment wanted to do more than just sit afound in our tents. That Thursday afternoon, as the pigs tried to take down two Palestinian flags hung up on trees across from the camp, we surrounded their ladders and chanted. Outnumbered and shaking, they only managed to take one flag down before they fled. While this was happening, other campers noticed the large flagpole in front of Levi Hall ‘was empty. A Palestinian flag was quickly attached to the line, flown up, and its line thoroughly taped onto the pole. Protestors protected the flagpole from cops and administrators with bodies and barricades for an hour in the rain until efforts to take it down abated.  Rain continued throughout the day, and Core continuously pushed back the second general assembly. It was not until nearly midnight when we saw Core organizers hurrying under the rain towards the outdoor cloisters between Swift Hall and Bond Chapel that the campers realized that this was the awaited general assembly, where Core would make decisions without their participation. swarmed in, depriving them of their secrecy. At this meetinj became clear that the Regotiators and the careerists were working closely with the Coalition for Justice in Palestine (CJP)—ironically enough, an outside organization whose involvemerit and direction in negotiations UCUP had not disclosed to the camp. We also learned negotiations had already occurred and that UCUP had accepted certain conditions on behalf of the camp without any camp-wide involvement or discussion. Citing the rain, which the enclosure sheltered us from, as the causé for curfailing an deliberation, facilitators rushed through announcements an refused to talk about escalation. Instead, they introduced a CJP ‘member, who addressed the small crowd, attempting to convince us to accept CJP leadership.
While we had been told the meeting would not include deliberation due to time constraints imposed by the weather, CJP’s professional organizer filibustered at great length, touting his organization’s immense resources and fluence. He aggrandized the group’s weekly marches in the Loop, which had béen steadily declining in participation since October, with no plan for moving beyond stale form, And he promised that ifplaced under CJP control, the encampment would receive a massive infusion of resources and bodies in the coming days.  As he spoke, sighs and murmurs echoed throughout the assembled crowd.” A quartet of women in hijabs shook their heads and whispered among themselves; it was not their first run-in with this organizer, and they were not impressed. Multiple attendees, who had braved the miserable weather to have a discussion, spoké out against the lack of transparency on display and the shameless attempts of the Surrender Faction, who had been fighting democracy within the general assembly since day one, to pass of the camp to a third party, since they were themselves clearly out of ‘momentum. If the powet should belong to the people, why is it so difficult for some’ organizers to relinquish control? Tired and wanting to go home, these organizers preferred to install a new sovereign rather than let the camp govern itself. This decision was unpopular, but they successfully maneuvered to end the meetin taking advantage of everyone’s tiredness from listening to the C organizer’s rant as midnight approached. We left with enhanced division and discontent, high tensions, and no sense of the way forward for the camp.  It is worth reflecting on the sad fact that the careerists and CJP found so many people in the encampment willing to take their  roclamations as commands and to help them resist calls for  emocratizing decision-making. A lack of collective political experience petvading US society has produced a kind of activist who relates to_polifical movements as some combination of consumer and low-level employee, following the directives of whoever represents themselves s in charge, especially if they can pass themselves off as the representative delegate of an oppressed group of people. Despite noble efforts by individuals and crews who erelou on pre- existing political connections and were eventually badjacketed for their troubles, no militant and serious opposition bloc appeared capable of reversing the performative, reformist strategic horizon set by the careerists.  We have since concluded that we erred by assuming all of Core was a monolithic bloc that handed down agreed-upon diktats to the mass of participants. We would later learn that Core was, in fact, so internally divided that its meetings primarily served to wear down and alienate its radical bloc, who then avoided the charade of the general assemblies. Identifying and building ties with these more Fadical organizers could have completely altered the face of the encampment, especially given we ascribe no profound social or
political intelligence, or even charisma, to the careerists who kept control of the camp. Instead, their success demonstrated a low level of politcal literacy amdng the camp’s rank-and-file, who most often simply did what Core Said; a ackof organization among radical participants; our self-marginalized inability to consider that we had more potential allies than we realized; and, above all, the insufficiency of all radical participants to build an aiternative bloc and political vision with which we might have contested leadership of the camp.  Even if Core was more amenable to radical proposals, the ve nature of the group as an informal, invite-only shadow council would curtail ifs attempts at creating effective decision-making rocesses. Even though such a sttucture could successfull  elegate tasks during the planning stages, its overworke persannel could not manage and deferid the 247 on-the-ground ogistical operation that is an encampment when secrecy and security were paramount. Between drawn-out difficult meetings where émotions ran high and fearful sleepless nights spent waitiny for fascist violence, the organizers failed to see that the muc larger community that had gathered around them had a direct intérest in the perpetuation of the camp and the skills to accomplish that task in a democratic and accountable manner, without extraneous layers of “leadership.”  On _the other hand, the proposed models to “decentralize” decision-making failed to escape their birth conditions. As discussed above, radicals designed effectively the decentralized ur%amzauonal models of the 1990s to” separate tactical deliberation from any discussion of the movement’s disparate strategic horizons. In our case, the creation of a variety of working gioups separated radicals, furfher preventing s from altering the camp’s trajectory with surgical precision: careerists sidelined disputes over their conservative vision for the camp or at least confined them to communities of like-minded but provincial militants, such as the Popular University’s “camp defense” working group. Thus, the careerists were left to shape the broader identity and aims of the camp. Ultimately, the same problems of the camp’s “periphery” bedeviled its “core,” but with fewer avenues to resolve them since one tendency within UCUP could at least make the camp in its image.  Working groups and spoles-councils, which we helped popularize, allowed militants to find each other and laid the foundations for relationships that would outlive the camp. However, movements should be udged at amigimum by whether ey achiete theirends, and the “decentralizing” organizational models proposed by well~ ‘meaning radicals in the camp brought us no closer to changing the trajectory of the encampment. Rather than well-meaning gestures at democracy, which assume that those deliberating sharé a shared strategic intelligence and political will, ong( rarely %lu_’n sed at the encampment, it may benefit movement radicals to build their own
broader constituencies of like-minded and skilled militants who can_intervene at opportune moments, connected to extant organizations but not beholden to’ the in-the-moment conservatism of full-time activists. At the outset of further long- term actions, we should also remember that an established organization is difficult to meaningfully alter and push against formalizing what initial secrecy measures may prove necessary to get off the ground any substantial action. Abolish Core!  This point brings us back to the importance of coordination between what ~radical _elements of official, aboveground organizations exist and the larger, more spontaneously radical raitk-and-file of any given ~movement—as thankless and frustrating as this work may be. Radicalization of any movement cannot _confine itself to_flashy (and, for many, alienating) confrontations with organizers, symbolic escalations at protests, or retreats into self-imposed exlles de-linked from the movement, “Escalatory” actions can only become radical if they retain a crowd to win over. This necessary step to politicizing any struggle requires the long-tem establishment oftrust and shared strategic ends; if leveraged correctly, gpportune moments may prolferate to infroduce new, more radical tactics to more sympathetic crowds. As the Palestine movement returns to campuses in the fall, this is a question we and others will have to find new ways to answer.  VI. A Bang and a Whimper  Friday. Word spread around camp that some combination of UChicago fraternities and the usual pro-Israel fascists had been planning a large counter-demonstration around noon under the fuise of 2 “pichic.” UCPD had removed the Palestinian flag flown 5nd protected on Wednesday without confrontation. Perhaps too fate, "Core began asking campers to avoid asking others about university affiliation, supposedly as a measure of protection for non-students. The careerists were no longer concerned about nefarious outside agitators since they now courted activists from all over the city to  rally to counteract the counter-protesters. This dynamic is frequent in social movements, in which top-down olganizers are willing to Use “anarchists” as shock troops and cannon fodder, onclly to turn around and denounce them at the first opportunity. This day was no exception.  Calls went out across the city to mobilize against the counter- protesters on the quad, Unfortunately, alarmed messages had already emanated from the camp and other Chicago encampments several times, barraging outside supporters with frenzied demands for action that most often simply petered out and were never again remarked upon. Like in 2020, when constant breathless accounts of “Proud Boys” who never seemed to materialize (and who antifascists would have easily defeated if they had) inundated Chicago activist platforms, these undisciplined, near-daily calls of impending invasion served to desensitize people to the reality of
vigilante violence and, we experienced, kept some conflict-averse people away from the camp when nothing was happening.  This time, however, there was substance to the rumor. As noon approachéd, two groups gathered on the far side of the quad under American and Israeli flags. The America camp was louder and more belligerent, blasting racist songs like “Sweet Home Alabama,” as the Zlonists did thefr best job of ignoring the fact that the only real anti-semites on the quad were the men organized to march alongside them. Once the combined counterprotest numbered abou fifty, Team America led a march directly toward the camp’s Eastern flank, led by prominent right-wing provocateur Arthur Long, dressed in a cowboy hat and smoking a cigar. They did not get In. Spotting their approach, many campers whom the careerists and their faculty allies were already vilifying as “horizontalists” and “insurrectionary anarchists” sprang into action and confronted the vigilantes head-on. These courageous comrades formed a shield wall that stopped the march and then, in a disciplined maneuver practiced over the previous week, advanced and pushed the fascists back one step at a time.  In the middle of this confrontation, key careerist members of Core suddenly popped up in the ranks of the fascists, their backs turned {o the men attacking the camp, demanding that the shield wall backup and disperse: One would later appear in a viral video widel celebrated for his courageous words outside the evicte encampment. Thankfully, In the thick of the action, nobody listened to him.  The shield wall and he willingness of some of the campers to physically stand up for themselves proved to be too much for the Invaders, and they were forced back and slowly dispersed. Meanwhile, at the exact moment of this retreat, Chicago cops began to appear on the camp’s Western flank Dozéns of tie same pedple who had just defended the camp against one threat sprang Into action, forming another shield wall around the rear perimeter. The energy was electric. Campers distributed water and plastic goggles 16 anvone holding a shield. Defiant lines formed on the  astern and Western flanks as Core’s rally began, where they could give their usual speeches.  We cannot emphasize enough the excitement in the encampment following this display of collective courage We saw s numbers swell to fhe laxgest they had ever been, and a collective buzz of enerey and entfiusiasm was palpable. We had seen what it could look Tike to mobilize to defend the camp, and many people were on board. Sensing this growing tactical militancy, several Surrender Factionists would later try to vilify the people’who had defended the camp, saying they had engaged in violence and had put vulnerablé peoplé in danger, n a classic case of Orwellian doublespeak At the same timé, we could not shake one scene in particular: leaders of the camp’s self-proclaimed governing body
standing in a sea of vigilantes, turning their backs toward the men who wished to attack the camp. When fascists and antifascists square off in large demonstrations, police turn their backs on the side they feel more affinity with.  saturday. The morning light revealed the growing fortifications of the camp. The Surrender Factionists, forced to soften their anti- radical sentiments by popular support for the previous day’s confrontation, stopped trying to tear down the additional fencin  and wooden barriers. While fegotiations and rallies continued ai UChicago’s camp, elsewhere in the city, students of other universities planned thelr actions and encampments, That ‘morning, students from the School of the Art Institute of Chicago set up their encampment on the lawn of the Art Institute itself. Their encampment quickly drew a sizable presence of CPD and an armed SWAT team, and when rafded only Hours after being set up, faced a brutal police response that never fully materialized at UChicago.  At that evening’s general assembly at the UChicago encampment, a representative from CJP, who had yet to muster virtually anything in the way of the promised resources or bodies for the camp, managed nonetheless to put in the hard work of reading a grepared statement denouncing the SAIC students who had faced  own brutality and arrest just hours earlir. The, CJP statement condemned them for following principles of “horizontalist” organizing instead of putting CJPin charge of their action. In these saine remarks, CJP promised the UChicago encamprment that as long as they followed CJP leadership, assistance in_terms of “community support” (CJP’s ability to mobilize crowds) and a CJP “efense specialist” would protect them from facing a similar response from CPD or UCPD. While speakers at UChicago rallies earlier in the day had invoked the Haymarket martyrs and Kent State shootings while condemning state violence against protestors, there was no sympathy or solidarity for the 68 students arrested at SAIC among the careerists and their allies. While many campers were disgusted by this and made it known, other participants in the hight’s “reportback” leveraged the arfests to push_their provincial claims  to_political authority—from CJP Tepresentatives to a few local radicals who jumped on the story, and amplified CJP’s denunciation of “horizontalists” just like them, simply to settle old scores.  Despite_all this nonsense, the large crowd gathered for this assembly called a vote on the futtire of the camp and voted overwhelmingly to stay and defend it in the face of a police raid. That evening, as negotiations on the Gaza_Scholars at Risk program between Core organizers and the university continued, new metal and wooden barricade materials appeared in the camp. Following its pattern of appropriating the language of rank-and- file opposition (and redefining it to the point of meaninglessness), Core began to claim to be “horizontalizing” the camp. They
backtracked, clarifying they were not sharing “leadership” with other organizations. Surrender Faction made this hierarchy very clear when they cleverly redefined the meaning of the popular notion that we ought to “defend the camp.”  Sunday marning. The morning assembly focused on two questions Will we defend the encampment? If so, how? Although an overwhelming number of participants had voted to “defend the camp” rather than leeing in the face of police the previous night, the Surrender Faction fad repackaged this resolution by thé morning to mean: We will defend the camp by fleeing it in such a way that press films a small number of our arrests while holding (but not using) shields. As a participant would later note, this traded defense plans for efforts at “the symbolic appeararice of efense.”  The meeting started with an update on negotiations. Core organizers claimed they had stalled the university’s negotiatin team to gain time. The university had asked which of the Jiste demands of the ercampment was the easiest to fulfill, to find a small concession they could hand over. The negotiators Stated this was in good faith, However, it was unclear whether the university negotiators saw it as such or believed they could bargain an Coricession from the university in exchange for pledging to pul down the camp. Under pressure, key careerists dismissed the idea of ending the éncampment in éxchange for symbolic gains and “rejected” any outcome other than a serious win. After this report, the general assembly body as awhole intended t0 splt ntg groups to discuss as small groups how people felt about defending the camp, along with preferred methods.  At this time, a r;presentative of FJP arrived to give an imposition from the “Red acult‘ll" §mup, who had previously touted their willingness to be involved in peaceful, photo-op arrests. Some of these Same professors had tried to run in front of the shieid wall on Friday to stop the fascist counterprotest, armed with nothing but middle-class respectability and vibes, until the real threat of physically violent, drunken frat boys forced them to retreat. Two days latet, they proclaimed they would not be involved if campers used shields to defend the ‘encampment like Friday’s raid. Furthermore, they announced that Chicago Teachers’ Union (CTU) union membérs were ready and willing to defend the encampment but would likely be unwilling if campers used shields. (They further clarified that CTU members would also be unable to assist the encampment late on school nights, which was somewhat stnkm%, considering that they brought this up as a considerable consideration on a_Sunday.} These announcements heavil influenced the flow of conversation and opinion within the smal group discussions that followed immediately after.  After the announcement from the FJP representative, the breakout group discussions began in earnest. In these groups, attendees
broadly discussed, in small part, the question of what they would be willing to accept in exchange for conceding the encampment and, in lafge part, the methods people wished (5 pursue to protect it. Several “Red Faculty” pushed hard against campers using any form of shield during those meetings. After group sessions, everyone returned to the G to report back, with 3 representative chosen bX each group to summarize their discussion. The reports roughly displayed a mood of hesitance about any kind of action much concern’about provoking cops and much hope that “Red Faculty” would be able to defend the encampment alongside large groups of rallied protesters. Faculty practically uninvolved in the Camp’s life and invested in nothing more than a televised video of their willing arrest were thus ablé to derail serious discussions among thosé who wanted to defend the camp.  In practice, the breakout group structure precluded any effective decision-making, After three-plus hours, Core did not hold a vote, nor was any other conclusive means of moying forward offered, and they actively sequestered dissent and discussion away from decision-making processes. We noticed a consistent pattern in which the careerists would identify a person advocating for strategy and tactics to the left of their own, surround them, and lead them away from large groups. Following this general assembly, a small group split Off to discuss a defense plan, primarily consisting of Coré organizers, Core postponed moré comprehensive defénse plans until the afternoon. They also officially announced the Gaza Scholars at Risk program to the public. However, those negotiations quickly broke down without the administration’s concrete commitment to the program. Meanwhile, rumors of an impending eviction spread and the careerists once more shed their fear of Gutside agitators, calling for a community “mobilization” to descend on the camp.  Sunday evening. After all the encampment’s rallies and speeches bold declarationis and rhetorical gestures toward the possibility o another world, and tokens of Courage large and small, what happened next strikes us as the peerless apex of the’entire UChicago encampment experience. ‘After the Surrender Faction organizers had successfully recast the vote to “defend the camp” as a retreat, replete with photo-op arrests for them and their faculty pals, they vanished into another of their elite meetings to fine-tune the conditions of our surrender. With no visible representatives of the camp’s power structure and with the buzz of a potential post-midnight police raid in the air, someone with no authority to tell anyone to do anything began to pick up chairs, pallets, and other stray wood, linking it all fogether to fortify the camp’s weak and largely symbolic barricade.  Slowly, others joined in. Dozens of people, many of whom had not participated iri any of the sham decision-making at the general assembly, much less talked to each other beforé this moment, joined together to repurpose an impressive array of supplies to
build a genuinely defensible wall. Tables, chairs, wood scraps, and two-by-fours began to vanish from nearby university buildings. Five twelve-foot panels of chain link fencing, destinéd for some pointless construction project or another, bécame a solid flank along the likeliest entry point for a police raid. As the fortifications around our encampment grew, some of the careerists watched uneasily; we overheard some commenting bitterly to each other that, in case of a police raid, there would be hours and hours of motie, as the cops would ot $imply drop (rom the sky. Others tried to dissuade rank-and-filers from building barricades with alternating threats"and pleas, most of wiiich were politely acknowledged and summarily brushed aside. Despite their disapproval, the many people who wished to preserve the camp and its powér worked on, wordlessly cooperating to place as many obstacles between a futtire police raid and the camp interior as possible. As the walls grew higher, campers taking power into their own hands intelligently fortified the camp for the first time since its establishment.  Atmidnight, the forces of the encampment and the swelling crowd that had answered the call to defend the camp gathered in the northwest corner of the quad in groups parceled Sut by personal sk, assessment. Core Had inittally’ designated a thibe-color gradation of riskc according to the defense plan, Red was for those  eople whowould stay as afinal layer until the efd and get arrested  v the pigs; Yellow was for those who would remain in front of the Reds until the “final arrest warning,” then would leave; and Greens were those who would leave at the order of dispersal. People were encouraged to break out into their groups and speak with each other, then wait to gather in their positions when the cops arrived. One of the problems with this color-based safety grouping was its fatalistic nature, with the Reds blurring the liné between wanting to be arrested and willing but not preferring to be arrested. And by more or less intending to get uneventfully arrested, many of the Reds proved to be the most useless.  ‘The color system’s rigidity also discouraged thinking about what actions camipers could take to defend the camp that would be risky butwould not automatically lead to arrest. We who are comfortable breaking the law but want fo get away with it struggled to relate to people, €specially the Red factlty, who seemed overly eager to don  ex cuffs. As the encampment broke out into color groups and began fo talk and plan, many realized heip risk assessments did not fully map onto this three-color system. The organic creation of the “Orange” role and the organizers’ concession to the crowd by ‘making it an “official” category revealed the willingness of many people within the crowd to take Tisks without a fatalistic attitude of sacrificial arrest, Meetings were then held with the four new color roles, as organizers went over the plan for evacuation of the Greens, the fallback plans of the Yellows and Oranges, and the final “defense” of the Reds.
At this juncture, the stunning naivety of the camp’s self-styled leaders became obvious. Their clever plan for evacuating Greens hinged on the Greens making their way to the camp’s Welcome tent, where graduate students would escort them through the line of rlot cops and into “safe” buildings. The rationale? These graduate students were unionized and thus had contractual Workplace protections, which the architects o this plan imagined the police’ would recognize and would magically encompass escorted non-GSU campers. Furthermore, we would eventually learn_that the administration’s threat model placed building occupations and all attempts at initiating such an action at the top of their escalation ladder. Any attempt toenter buildings, even just to “pass through” them, would have been understood by police as the beginning of a building occupation and would have prompted violent escaldtion from campus or city police, As those moving through the buildings in this scenario would’ve been the most risk-averse individuals during an active and chaotic raid, this approach would likely have restlted in myriad casualties.  A& this time, nobody was sure whethe the raiding patty would be UCPD or thé regular Chicago cops, who openly delight in tuning their clubs on activists’ heads. We had seeri the Tmages from Columbia, UCLA, and other campuses; we believed we ought to prepare for that level of aggression. In a heated exchange, sormeone asked a large group of carcerists if any of them had any experience dealing with “actual riot cops. To their credit, they answered honestly: no.  Monday morning. No_ police raid materialized. In the hours between the defense planning meeting and the dispersal of the crowd around 3 a.m,, campers held varlous meetings intended to iron out the details. These changed and evolved as péople began to think of different ways to defend the camp, intluding staying behind the barricades. In the Orange meeting, some participants pushed against the notion that  abandonifg the camp was preserving it. The facilitator promptly shut this down. When another Orange spoke up, demanding a vote on the matter, someone said, ’ Look, another white man asking for a vote.” Thesé interventions were too little, too late. And it was sad to see. Many campers had built the barricades and reconsidered what it meant to defend the camp, talking of possibilities of resisting from within the walls we had built inctead of a slow abandonmekt, which now seemed all but certain.  ‘The improvised Orange category was the only silver lining in this sad spectacle. While Red faculty prepared to upload new default Facebook photos of their righteous brushes with the law, Oranges openly discussed the tactic of “de-arfest,” in which they planned to grab arrestees and pull them away from police. Regrettably, this escalation was promising but did not generalize to defending the whole camp.
Students and faculty arrived at the Main Quad in the morning to find the encampment fortified with materials appropriated from across campus: it was a beautiful sight! However, as campers tried to reinforce them throughout the day, cops grew more aggressive toward people bringing wood toward the barricades, leading campers to suspend ‘such efforts. One incident was patticularly illuminating. After a comrade was stopped and namechecked by cops simply for moving a two-by-four about five inches over the ‘mesh fencing, he decided that the best use of his time was to show us how to tape books around our torsos and avoid internal organ damage before he left. Exhausted from the late nishl, oon edge, and stresséd, the Monday crowd was much smaller and quiieter, though there was still some talk of defense. From nightfall onwards, cops systematically entered and swept through every building, from top to_bottom, around the encampment. Coupled with the pigs’ renewed and intensified aggression towards anyone who came within a few inches of the barricades with material, it was clear to us that whatever directive from the top brass that previously had kept the cops in check was no longer in play.  Monday evening, At 10:58 pm, a public announcement from a local journalist broke the tension: a “well-placed source [told him] the  niversity of Chicago will attempt to clear the [encampment] at 3AM tonight” This announcement immediately kicked off a panicked firestorm of activity, and people began heading back towards the encampment. The raid tip-off had forced the self- declared leadership and the various camp defenders to lurch out of the day’s inertia for something like a last stand. Our ranks, however, looked quite spindly; the encampment was down ir terms of personnel in general, but specifically and critically, most of lhec})eople ‘who had both the experience for and commitment to defending the camp were not there. Those most personally involved in the camp’s defense had returned to their various homes and jobs due to the start of the work week and the exhaustion of having prepared for acomplete defense the previous night when no threat materialized. Also, they had gotten sick of being red-baited and insulted bg the careerists and their faculty allies, especially after the shield wall had saved the day on FndaK. ‘While we al vowed to stay until the end, we can’t fatlt those who had taken or were prepared to take significant risks to protect the camp only to be thrown under the bus by the opportunists who now, once more, cried for help.  The actual raid’s threatening imminence, compared to_the interminable vap sessions of the weekend’s general assemblies, forced the differing factions to attempt to collaborate in earnest. Comrades who had pushed for a clear and practiced defense strategy without conceding to mass arrests and clearance as an inevitability suddenly found themselves consulting with marshals and leadership, who had previously-railioaded them out of meetings, to formulate a last-minute defense protocol. After frenetic discussions over whether to take the tip-off seriously, an
announcement was posted to the UCUP Telegram channel at 12:03 AM that they had “received credible information that police WILL be carrying out a raid against the UChicago encampment in the coming hours.” At 2:03 AM, a penultimate update before the go- home Signal went out on the channel: all buildings were locked:  In those two hours, sympathetic Core members and a prominent camp defender began to coordinate a defense plan with three main points_of action. First, all valuables and “Greens” were to be immediately evacuated from the encampment via cars. Second, barricade materials were to be staged near the Western flank of the camp so that defenders could control the Western routes to the quad when the time came. Third, organizers were to announce and coordinate amass mobilization, marking the climactic action of an orderly retreat on Ellis Avenué. With community members with defense experience largely absent and with no_practicable practical, and pre-existing plan for defense, a successful defense of the camp appeared implausible. The careerists had wasted so much time with their filibusters and silly little games that all actual preparations for a potentially dangerous encounter with the police ‘were now improvised ad hoc, absenit many of the people who would have given us a fighting chance. A relocation to Ellis and march away from the encampient site would at least offer the possibili of a strategic retreat that could preserve the equipment an capacity necessary to continue the struggle.  Initially, Core organizers proceeded with these suggestions with total and immediate cooperation; however, this only lasted a little more than an hour and a half before the gridlock of the previous days soaked into the plans and undermined the on-the-fly camp defense strategy. Of the plan’s three points, the first happenied, the second did not, and they bungled the third. A considerable amount of valuable equipment (construction tools, sound systems, etc.) and uinerable peaple did. escape, having been whisked away shortly after, midnight. When caripers and sympathetic Core members at the encampment moved to relocate the barricades, resistance against physical defense from the Surrender Faction stonewalled this effort, Lastly, instead of the proposed strategic retreat and rally on Eliis, for which UCUP had begun to put out mobilization messages, these Core members changed their minds, choosing to mobilize oh the quad, which provided much more risk of encirclement and no practical direction of retreat.  ‘The proposed joint plan for evacus settled back into the careerists’ i those who craved it and uncoordinated scattering for others, as no one was certain where the rally was supposed to occur. After this point,coordination between camp defenders and Core organizers roke down, not resuming until the raid earnestly began around 530 AM. The proposed strategy did supplant Core’s complete fantasy of miraculous graduate Students leading Greens through buildings to safety, which was the backbone of Core’s initial
defense plans. Unsuccessful attempts to meaningfully coordinate between Core and camp defenders on Tuesday morning likely helped to avert a much worse clusterfuck.  Tuesday. At 3:30 in_the morning, notable members of Core announced that a raid was not imminent, and everyone who had shown up for defense could go home. By this point, however, it was a fait accompli that “defense” really just meant handing thé camp over to the cops and maybe watching a few professors and student movement bureaucrats get cuffed G camera in the process. S0 most people had stayed Rome in the firstplace. And why wouldn’t they?  Around 4:30 AM, after the all-clear signal had already gone out on Telegram, two UCPD SUVs blazed onto the Quad, steps away from the éncamipment’s Eastern flank. In an unpredicted turn of events in all defense discussions, the cops did not give ample warning of their arrival: they did not Stage en masse, nor did they slowly creep upon the encampment: Insiead, they uilized the extteme mobility of cars and armored personnel carriers: they drove directly to the front of the encampment, and kitted-out riot cops unloaded en masse on_the doorstep of the camp. Within seconds, they were already within the walls of the largely undefended encamfment before anyone could even realize, much less put out calls for ‘mobilization. UCPD officers and Allied Security rent-a-cops ripping apart the (unattended and unwatched) barricades roused the few students (many of them Core organizers) and communi  embers left in their tents. One student was pushed down ang injured by a UCPD officer as the campers were forced out of their tents and quickly pushed off the quad.  UCPD then put up plastic barricades between one entrance to the quad, which became the rallying point as community members and students trickled in. The evicted campers formed a [ine against the barricades, and there were moments when the front-line group of thirty or so began to push against the cops, forcing them back a few steps before reaching a stalemate. Prominent Core members who had denounced the shield action were seen, in these heated moments, usmgflthe plastic barricades against the cops! Perhaps they had learned the error of their ways. Or maybe they hoped to salvage their arrest photo-ops from an eviction designed to prevent them.  The crowd grew slowly. News reporters rolled in, and photographers snapped pictures of the crowd, still small in ‘the early morning hours Eventually, the shoving match with the cops stopped, and waves of chanting continued until a little after 7 when the police suddenly pulled back the barricades. The students and gathered crowd broke out into cheers, but just as they marched throtigh the entrance to the Main Quad, the last of the utility cars rolled away, and the emptiness of the quad revealed itself. The onl traces left of the camp were squares of raw ground and yellowef
grass. UCPD officers loitered at the entrance of Levi Hall but otherwise had disappeared, their job done: They had cleared the camp, arrested nobody, and averted the potential for spectacle. UChicago beat the student and faculty organizers, who thought themselves astute practitioners of social movement realpolitik, at their own game; the university knew they wanted symbolic arrests and deprived them of even this little victory.  At this, the crowd of about a hundred people that had built over the ‘morning gathered in front of the steps to Levi, as students and campers Stood in front of the steps, arms and hands locked together in the manner lhe}‘]had learned over the past week. But it was too late. There was nothing left to defend. Student organizers led the same old chants and gave a few short speeches, but the (threat of) rain swgpt the scene clear of people. The encampment was over. As of writing, CJP’s promised Tesources and cavalry in exchange for the encampment renouncing some of its most dedicated activists have yet to arrive. Even when eviction had loomed as a matter of mere hours, CJP’s leadership and its imaginary battalions stayed home.  VII. In The Aftermath  Two attempts to harness the movement’s energy, or whatever remained of it, illustrate the crossroads we face moving forward. On the Saturday following the camp’s eviction, UChicago Students for Justice in’ Palestine called for an action to disrupt the university’s Alymni Weekend. After  predictable litany of concen trolling from the careerists, the action amounted to little more than red handprints on someé beer tents alumni were drinking in— which the Surrender Faction scrambled to help clean up. Meanwhile, another crowd had gathered on the Midway Plaisance. The rally began with the usdal-chanting, but as it futned into a march, the composition of this crowd—which brought genuine efforts to protect identities and a lack of campus Careerists— promised something different from the morning’s art project. As the crowd advanced down Woodlawn, the leaders drew the crowd to the Institute of Poltics, where a group of people dressed in bloc quickly moved up e steps and Into the building, As the rest of the crowd either milled on the sidewalk or rushed excitedly to the poich, the militants inside got to’work blocking entrances and  anging banners from the roof. No longer the Institute of Politics, now the Casbah Bassel Al-Araj, the occupiers declared: ‘1. Fre¢ Palestine 2. Abolish the University 3. Land Back 4. Fuck Gentrification 5. Fuck 12.”  ‘The occupiers held the building for about half an hour before the cops broke_through. The pigs didn’t arrest anybody as_the occupiers climbed out the front windows and into the safety of the crowd below. Meanwhile, a festive vibe continued outside the building well intg the night, The militants who carried out the occupation have their productive critiques of how the action went.
For those on the outside, it impressed upon us what could be accomplished by those willing to simply ignore the bureaucratic Tachihations of the movemekts self styled leaders and seize an opportunity to do something.  This autonomous action also visibly invigorated the crowd. Throughout the evening, protestors demonstrated a willingness to ress Up against the cops and move against them as a crowd, even eginning to surround them with improvised barricades of patio furhiture and pushing them out of the Casbah’s backyard. The careerist Core members left out of the planning for this action arrived Jate and immediately attempted to co-opt and “de- escalate? by standing between cops and protestors, a5 well as preventing efforts to remove cops from the Casbah grounds. At one oint, they tried to convince the crowd to move onto the Main uad! the crowd summarily ignored them. While they had to be publicly supportive of the occupation, lest they lose face, their actions on the ground and commentary after the fact made clear their disapproval of an action occurring on campus outside their purview, without their structure of marshalls, police liaisons, and other elements of safety theater.  ‘The Casbah educated the campus’ Palestine movement in practice where the encampment had tried—with thornier results—to raise political consciousness. A group of militants unatfilited with any aboveground organization had pulled off an attack on a building that routinely hosted the University of Chicago’s political allies, from Lori Lightfoot to Anthony Blinien. They had done so without arrests and Rad demonstrated to non-occupying participants that a sufficiently brave and intelligent crew could take decisive action against the university without UCUP sanction. A degree of coordination and militancy relegated to distant Columbia and Cal Poly Humboldt occupiers suddenly arrived at the University of Chicago—and the window of what campus militants considered possible shifted as a result.  Who were they? These occupiers had left the camp early, as we were digging n for a protracied (and losing) struggle to siape s outcomg, and had simply invested their energy elsewhere. As in our failure t0 establish contact with the radical bloc of Core, we had been operating largely ignorant of their existence, leading us to mistakenly consider ourselves an insignificant minority in the ‘movement’s rank-and-file. The Casbah action taught us that this way of thinking was misguided—that numerical minorities can practically shiff what seerns possible to the majorities in which they move.  As the genocide in Palestine continues and the movement opposing it deepens in the coming year, we ought to take note of the newfound ability shown by these comrades to model the leading edge of the struggle. To’that end, we can only benefit from coordinating our actions to test and éxpand the bounds of what the
moverment considers possible. The next leg of the struggle will not be without similar opportunities—and “when radical moments come around, we must grasp them with both hands.”  By contrast, at the University of Chicago’s graduation, a small group of dedicated militants had decided to use a crowd gathered uring a walkout to facilitate an interruption of a graduation ceremony  nearby. UCPD responded with rfelatively- uncharacteristic force: not only was the planned site of the post- walkout rally barricaded off, but the members of the crowd who threw themselves at the police barriers were summarily pepper sprayed, taking many out of commission for the rest of the day.  As the confrontation escalated, those willing to stand at the barricades dwindled, and the militancy of the crowd’s response lessened; eventually, g sixty-year old Palestinian mother of a graduate was picked off, pulled over the barricade, pinned to the ground, and arrested. The remaining crowd shied away from Confronting the police, chanting instead: “We are the Intifada, we are the revolution.” We can’t think of a better visualization of the careerists’ politics than this. Meanwhile, the various blocs of the Chicago organizing crowd revealed themselves under stress: vocal liberals juriiped on the moment with calls to disperse, while others seized the opportunity to yell at police; aspiring movement leaders (thankfully kept from positions of authority in this instance) gave speeches to an inattentive crowd, as UCPD and CPD vans rolfed up t0 block the path between the barricades and our target.  After this first battery of speeches, a particularly visible careerist from the encampment began to march the crowd in the opposite direction of the site where organizers slated an interruption to occur, a decision thankfully reversed by action leadership, who proved sympathetic to the militant edge of the crowd. Once the march had reached the site of the planned intervention, organizers had to coax the careerists into bringing the crowd up to the stage, where a dozen or so of CJP-action attehdees lingered—too few to pull off the planned disruption, But this last-ditch effort to secure avictory in defeat was delayed by more speeches. Ultimately, when the crowd declined to follow one militant over a set of red velvet ropes suEgesting Froleslurs no{jgass, this too was stymied, leaving them to Bounce off a couple of UCPD officers.  Vlll¢sefgee Palestine, Free  Where to %fl after the encampments? We consider this an open 1uesuon that we should debate honestly, free from pleasing  illusions and clichés, among the sizable mass of activists mobilizes  by the encampment wave. Answering this question requires clear- ejed assessments of the limits ach encampment ran into, considered alongside the most promising political developments they brought info being, We hope that our efforts to outline the
contours of the UChicago encampment will help broaden such a discussion, and we encourage others to similarly reflect and respond toour assessment of our own experiences. The lessons of the encampment wave are not readily apparent; we must draw them from collective thinking and debate, ideally outside toxic and superficial discourse found on social media, Now that the encampments are mostly gone, the energy and hope conjured b these bold actions of building commons, no matter how limited, can either be folded back into’a dull and failing reformism or elsé can_point toward a new chapter in anti-imperialist and anti- capitalist politics. On the most basic level, this necessitates the hard work of defining what the camps were and what the post- encampment moment could be.  As encampments across the country have come under fire from the political right and experienced repression_from _university administrations and_police forces alike, many progressive commentators have defended them as legally valid exercises in “free speech.” In a particularly nuanced analysis, UChicago history professor Gabriel ‘Winant argued that our encampment was acceptable within, the standards of the Kalven Report, a 1967 document prescribing the university adopt broad politica neutrality, according fo the so-called Chicago Principles, and permit_all manner of free expression. Claiming that the “encampment embodies only free expression and modest inconvenience,” Winant accidentally underscored the trap set by well-meaning movement supporters who were desperate to keep them within’ the bounds of respectable liberal democratic perticipation. And it is precisely hese bounds that the Pro- alestine movement must escape if it is ever to be anything besides afutile exercise in “speaking truth to power.”  ‘The UChicago Popular University for Gaza’s material power was not its righteous speech. Tt was bold, collective action against rules, order, respectability, and sometimes laws. The Core members who understood the encampment as a lawful exercise in speaking truth to power were the camF"s ‘most conservative voices and spent far ‘more time attacking leftists and undercutting the encampment’s  ability to sustain itself than they did fighting to free Palestine.  iThere is no doubt that the state is taking us seriously,” Don Hamerquist wrote in the Anti-Racist Action Research Bulletin in May 2001   We should also take ourselves seriously. Playing the innocent victim is not serious. Treating IEKIESSIVE policies as if they were reflexive reactions of idiots and thugs is not serious. Much of the content of movement talk about ‘criminalizing dissent,’ about mass and pre-emptive arrests, about police britality and ‘non- lethal weaponry’ substitutes a liberal public relations stance, and an ineffectual one at that, for an analysis. We won’t get anywhere or gain anything by reacting to inciderits of repression with appeals
to civil libertarian rights to protest. The state isn’t committed to these ‘rules of the game,’ and the movement isn’t either—or at least it shouldn’t be.  Campers widely mocked University of Chicago President Paul Alivisatos when he wrote: “I believe the protesters should also consider that an encampment, with all the etymological connections of the word to military origins, is a way of using force of akind rather than reason to persuade others.” Laughing off this observation as the words of a bookish administrator created a missed opportunity. After all, was he wror:fi:]Was the purpose of the camp to use reason to persuade others? Why did those claiming their actions would “Globalize the Intifada” react derisively to the idea that they were considered partisans in a military operation? ‘The activists who sought to laugfi off Alivisatos told us more about their sense of the encampmient’s political importance than anything,  When our activities are all in good fun within the rules of capitalist hegemony, this is a critical flaw to redress immediately. The notion that the camps were “just expressive conduct” played into the dead-end strategy that understood them as efforts to communicate witlr tniversity elites rather than the basis for taking space and exerting political will as an end in itself. Rather than beg for respectability and egitimacy i the eves of the very institutions we seek to destroy, we must instead strive to become the menace our enemies already believe us to be.  To this effect, a curious slogan brought great promise to the encampment, which it largely squandered: “Globalize the Intifada!” Few sentiments we Eave heard capture the fundamental interconnectedness of the struggle for Palestinian self- determination with the global fight against capitalism and the crises it wreaks, however unevenly, throughout all societies and struggles for Self-determination. The Palestinian_resistance représents some of the bravest and most innovative tactical incursions against the repressive might of global capital, and to place ourselves as an of that struggle is both enlivening and Sobering in terms of what it may call Uipon us to do. After alf, why were we out in the streets at all, marching beneath the Palestinian flag if not because of the bold, unsafe, and illegal action taken on October 7th, 20237  It was thus profoundly absurd to witness the self-styled leaders of the ’camp, in between baiting ‘outside agliators” “horizontalists,” and all the other bogeymen, Situatiny  themselves in the most militant expression of antiracist globa resistance, all the while shutting down proposals that wotild be inoffensivé to Greenpeace. One might imagine that in Hyde Park, a flagrantly colonial outpost, intelligent analyses of race would be the ground floor for thinking politically. This imagining would assurne that the stars of the University of Chicago’s activist scene
were interested in thinking politically. But many of the encampment’s loudest voices Were only willing to bring up racial politics so far_as it bolstered their conservative tactical preferences—going home, listening to the police, actively Intervening against confrontations with racists.  To this end, the careerists within Core bludgeoned proponents of any tactical response to the encampment’s many threats with the promise hat self-defense would invite brutality on the camp’s  lack and Brown partcipants. Toelng this line, set by the Coaliion for Justice in Palestine’s affiliates and “defensé specialist,” did not provide the security it promised. When the raid did come, they were nowhere to be seen: a CJP affiliate had called off the camp’s defense, and the night watch had broken down, leaving the door gpen to racialized police violence. But when students took to the barricades against UCPD the following morning, the only injuries were from batons—which would have been prevented by more generalized shield training. By refusing to dignify the political Hilitancy, which they had professed, with any commensurate action or analysis, these movement bureaucrats-in-training had added nothing of value to the struggle over which they claimed unearned leadership.  It would be cheap to settle on the inadequacy of our activist fellow travelers or to belabor the reticence of CJP crowds to confront the police uniformly. All struggle develops unevenly, and Chicago crowds are sim%ly scarce In the necessary Emctical expertise to make large-scale confrontations imaginable or advisable. The graduation action’s failure points us t6 its parts, which had the Potential to add up to a more successful conclusion’ (1) our relation to the various blocs of this campus’ pro-Palestine movement, (2) our understanding of UCPD’s tactics and penchant for violehce, and (3) the way the two might combine to open opportunities for tactics more adequate to our strategic ends.  First, the division of Core between the Surrender Factionists and disparate radicals largely determines their willingness to work with movement radicals. The likelihood of successful, non- allenatm% escalation at any action depends partly on whether the action’s leadership will jump to condemn and isolate its more ambitious participants. However, we should not  see this dependency as a static fact. At certain moments, the willingness of the more conservative or undecided segments of the public-facing  Core to condone more radical tactics widens: during the standof  with UCPD at the barricades during graduation or in the immediate aftermath of the raid, confronting the police was a real (if missed) possibility. The near-willingness of Core to rely on movement Tadicals in the lead-up to the raid also opens a question for us: to what degree can we rely on the cooperation of conservatives within the student movement, especially as they become aware that it is necessary to defend themselves against police and fascists? This question is unresolved, but it suggests the nascent radical bloc
within_this movement may expand as police confrontations become_more common. We must sharpen our discernment concerning our participation in these movements; we should be ready to conclude, for example, that some public-facing actions, especially ones led by careerists, are not worth our time; we should also be able to identify actions that are sufficiently disruptive, tactically advantageous, and populated by the right blocs of activist paticipants as Belng’ worth, our time. Navigating betueen  urnout-inducing pliability and over-conservativé abstention will have to be hashed out practically.  Moreover, at every step of the encampment and ensuing actions, any received wisdom about campus police-the ubiquity of arrest warnings, the usefulness of police liaisons, the relative unwillinighess of UCPD to harm protestors, the risks of self- defense, etc.—was made obsolete by shifting police responses to student radicalism. As the Palestine movement’s actions drew in more community members, including non-UChicago participants, UCPD  practices commonplace during prior ~actions = were abandoned. It is not clear whether the Tesults trend uniformly towards violence and away from “soft” counterinsurgency, but the rank-and-file officers demonstrated a good deal of anger and distress during camp dispersal and graduation; pepper spray and violent arrest were new for many at the barricades. With increased police violence against protestors has come a broader recognition of the importance of “crowd safety” and self-defense—as this realization continues to spread through the more conservative elements of Core, it may be possible to close the gap between their aims and ours at crucial moments.  Lastly, as self-defense increasingly becomes the order of the day, we couild stand to isolate ourselves less. Promoting best practices, in light of an observed track record of increased brutality against students by UCPD, could bring these two tendencies into a  roductive whole: ¢rowds that know how to defend themselves  ave at least one fequisite component of belng brave when the ‘moment demands it. Opening the door for unlikely militants to act out their political commitments is tactically advantageous for the entire movement. As before, this will teach us that certain crowds are not worth our limited energy to help “skill up”; this uneven development of struggle, however, also extends to’ anyone who arrives willing to employ riskier tactics.  The main obstacle facing any campus organizing project is the contradiction between those whose interésts are limited to the parochial matters of managerial campus politics and those who see the campus as one (small) part of a much larger terrain of struggle The presence of people with no affliation to the University of Chicago was the primary strength of its encampment. They helped us expand our horizons beyond bureaucratic jockeying within a single intractably evil and elite institution and orient outward instead to the struggles unfolding all around the globe. Ultimately,
a dead-end alternative to this necessary vision won out, for the same reason the encampment ended with a whimper: we didn’t have enough outside agitators!  Itbears repeating that none of this implies, s common narrative of recent strug%es runs, that an impetus toward the correct strategy emerged spontaneously, or that we offered one, only for the “counterinsurgents” in Core to somehow sideline a vital and focused fighting force. Instead, one of the most alarming products of our colfective reflection on the encampment movengent is the absolute shortage of strategic insights on the part of most participants, including ourselves. Looking back, it is quite frankly alarming how the dentands of the encampment imposed a stifling political horizon on our thinking and limited all collective thinking to narrow questions of tactics. When a comrade recently asked us why none of us had proposed a strike of graduate workers to coincide with the encampment, for example, obody could answer except to say that we were probably debating how to expand the physical footprint of the camp twenty feet in one direction or another when we should have been drafting that proposal Ultimately, the push for “escalation,” absent a broader strategic horizon, amounted to a more militant version of the careerists’ plan to use the encampment to speak truth to power, as opposed to the deliberate cultivation of counter-power capable of existing for itself.  ‘The conflicts around “escalation” in the day-to-day narrative of the camp also reveal the limits of the term as it became memeified. Campers ‘occupied. Hind’s Hall on Day 2 of the Uchicago encampment; hashtags like #EscalateforGaza, accounts like Escalate Network, and zines entitled “We Don’t Need Safety — We Need To Escalatel” meant we were responding to the idea within the encampment wave. The phrase passed around the camp and came to mean anything from moving a plywood wall, spray painting a statue, occupying a building, or just remaining on the  uad. From the beginning, we wanted to catch up to other camps that “escalated” to avoid becoming another Northwestern. Tf?e camp was an attempt to get leverage over the administration, intended to cause enough of a disturbance to force concessions. Once inside the camp, however, escalation became limited by the form of the camp. It bécame difficult to see beyond the day-to-day conflicts over what “escalation” meant and the proliferating images of escalation clouded real-time analysis of our particulat possibilities, Some may have been calling to move “from the campus to the streets,” but what was on people’s minds was moving from the lawn’to the buildings. It was either escalate or surrender, but our discussions of “escalation” never moved towards what a long-term escalation strategy might look like coming out of the camip.  This experience is not unique to the encampment but instead represents a common experience we have shared in moments of

upsurge when abstract thinking is a luxury and issues that take up a tremendous amount of time, Such as whether someone ought to have knocked over a garbage can, seem in retrospect fo be ridiculous. We have concluded that, just as we must improve organizational capacity before the next wave, we must also inCrease our capacity to think in common. Collective exercises like this document are an attempt in that direction. As we write, the tactical and strategic horizon of the Palestine solidarity movernent and the broader struggle against capitalism remain woefully inder-defined; instead: Tar tGo many intelligent comrades waste their days debating bourgeois electoral politics in bad_faith exchanges with total strangers on social media. A reevaluation of priorities is long overdue.  Which brings us back to the fecund phraseology: “Globalize the Intifada.” Saying the phrase exceeded the content in the case of the UChicago encamiipment is as colossal an understatement as they come. But we understand it as a challenge. It raises the question: how can we engineer a situation where’the content exceeds the phrase?  See you in the Fall!

Reflections on the UChicago
Popular University for Gaza
Encampment

An extensive analysis on the Palestinian solidarity movement
and protest encampments that sprang up in Chi
summer. Originally posted to the Lake Effect Collective website.

‘The final Gaza solidarity encampment to fall in the city of Chicago
was pitched on June 8that Buckingham Fountain, directly adjacent
to Lake Shore Drive and within sight of the ‘expanse of Lake
Michigan. An hour and forty minutes into a small rally, a group of
participants hurriedly set up a dozen tents, established a new
“encampment,” and “liberated” the fountain in the name of Gaza.
Chants includéd: “We will protect our students.” However, the
Coalition for Justice in Palestine (CIP) did not show the camp the
same loyalty; after ushering a handful of over-eager arrestees out
of the tents, organizers with CJP unilaterally called an end to the
zally. The Clicago Police Department (CPD) followed anits heels to
confiscate and discard the tents once the camp had voluntarily
disbanded. The fountain was “liberated” for a few hours at most.
The tents, leftover from other encampments, which CIP had
refused to'donate to unhoused Chicagoans becatise they belonged
to the organization, were instead gifted to the CPD—who did niot
appear to appreciate the gift.

This bizarre conclusion to a semester of campus occupations is
how exactly half of those who planned the University of Chicago
Gaza Solidarity Encampment hoped events would conclude on
their quad. These student activists, who made up a vocal reformist
bloc within the so-called “Core” of UCUP (University of Chicago
United for Palestine), promised to stay until the school divested
from Istael. For many'of them, it was a bate-faced Li; they planned
to return to their dorms and apartments after the camp’s second
night. This faction subtly campaigned against keeping the
encampment gomifqr its éntire existence and consistently wore
down efforts t6 make it a genuine occupation.

They were, however, a numerical minority. Many students heard
their cynical words and took them literally, as the promise to stay
until divestment became the bottom line for the encampment’s
radical edge. The tensions that emerged between the phrase and its
content, a3 Core’s internal unity and external control of the camp’s
affairs broke down, helped us find our place among the various
blocs of the campus-based Palestine movement. We hope an
inventory of these experiences may point to possible ways forward
now that the season of encampments has ended.

‘The document you are reading is the direct collaboration of eleven
participants in the encampment and draws upon insights and
recollections from a larger body of comrades. While we use an
authorial “we” to outline points of consensus, the authors are an
eclectic group of UChicago students, workers, and unaffiliated
community members. Some of us have extensive movement
activity, including Palestine solidarity, labor organizing, and
campus politics, and others experienced the encampment a3 their
first wave of struggle. Many of us did not know each other before
the encampment, and we are not members of any revolutionary
organization. Defpite our different backgrounds and varying
refationships with the university, we came together around a
shared practical sensibility, steered by the notion that the Palestine
solidarity movement in Chicago, and more broadly, the essentiall
connected movement to end capitalism, must” do better, ani
develop tactics and strategies adequate to these righteous airns.

We believe that the university encampment movement in the
United States is a significant political development that will, for
better or worse, determine the immediate future of the Palestine
solidarity movement and also help set the stage for the next wave
of mass Struggle on a more generalized scale——the likes of which
we saw in 2030 and will surely see again before long. It is thus
essential to map its contours and contradictions. In our narrative
analysis, we hope to establish a definitive documentation of how
the UChicago encampment went down, with the broader intention
of opening up an array of tactical and strategic questions for
readers in Chicago and beyond. We offer a story that is at once
likely to be familiar to those who have participated in pro-
Palestine encampments and simultaneously quite at odds with the
official version of events offered by the more reformist
organizations active in them. While certain aspects of the story are
unique to_their setting, most of what we have included is
generalizable to pressing questions around how incipient mass
Tovements understand themselves, organize, unfold, and die.
Within the context of UChicago, we hope what follows will serve as
a kind of cautionary taie. The movetnent must do better In the
future, and we would not have taken the considerable time to
collectively author what follows if we did not believe it was
possible.

While we do not have a directly programmatic solution for the
Bresent political morass, we share a common understanding that
he anly effective moverrent tofree Palestine must simultaneoust

entail the revolutionary transformation of the United States and al
capitalist societies, on which the barbarism of Zionism and other
forms of life-denying oppression rest. This understanding does
not mean deferring the end of the occupation until the proverbial
“after the revolution,” but instead, practically linking the fate of
Palestinians with the victims of capitalism on a global scale as a
‘means of orienting political activity on the local lével, in the here
and now. While overthrowing a superpower like the United States
and the attendant collapse of a global hegernon like the capitalist
mode of production might seem impossibly far-fetched, such
abrupt historical transformations have almost always seemed that
way until the day they didn’t. In any case, this is not a thought
experiment; the struggle is already underway.

I. The Siege of Gaza

In 2024, the Zionist state has occupied the land of Palestine for
seventy_five years. For three generations, the regime and its
armed men have subjected Palestinjans living in this reservation-
turned-killing zone to deprivation, humiliation, and genocide. But

the blame falls on the Zionist entity only as much as it falls on its
friends, those ploneers of population management: the last
centuries’ colonial empires and their descendantts, the developed
capitalist states. Once eager to support Theodor Herzl’s attempt to
dSolve” the so-called Jewish question in Europe by creating a
“national home for the Jewish people” Somewhere, Aywhere But
Here, these states now constitute the Zionist regime’s most
earnést and ardent supporters, seeing it as a crucial partner and
foothold in a crisis-ridden region, at various moments the bulwark
against communism, Arab nationalism, and political Islam. The
history of the Palestinian occupation is a global story, implicating
the great powers of the world; so, too, miust its liberation be the
busifiess of every person fighting for fréedom worldwide.

The present historical moment beganin the late twentieth century,
with' powerful nations and increasingly transnational capitalists
realizing that the world system sustained until the sixties and
seventies could not continue. Profit rates dwindled, and state
counter-offensives _against _radical labor and ' liberation
movements_triumphed”domestically. Capital then set its sights
abroad, as industrial manufacturing in the core gave way fo a
bloated service sector and ejectéd swathes of (racialized)

roletarians from regular access to employment and pay.
imultaneously, colonies and dependent client states won their
“independence” from their metxopoles, only to be re-integrated
into global circuits of capital by the same imperial firms fleeing
their domestic labor markets, backed by an international order
gapable of forcing newly ifdependent States inio, predatory
“structural _adjustment” policies, responding with extra-
economic force where this proved unisuccessful, This new round of
primitive accumulation engendered perpetual instability in many
so-called underdeveloped hations as a paramount condition of
their participation in the world market. To make matters worse,
the drive to compete has accelerated the destruction of a massive
range of the planet’s plant and animal life and rendered human
habitation in these same areas increasingly dangerous—for their
inhabitants and the rest of humanity, as the fout_year pandemic
has demonstrated.

We face today a combined but unequally developed global crisis at
the hands of a transnational capitalist class whose “Fuling bloc” is
politically disorganized, incapable of or unwilling to pursue long-
term planning, and ready instead to white-knuckle whatever crises
are necessary to shore up its persistence, at the expense of the
populations it holds apart from regular employment (hereatter
“Surplus” to labor). Avenues of resistance—labor unions, old
socialist parties—that once served as counterweights to the
capitalist order have integrated into it. Likewise, the external
differentiations that once characterized global politics have fallen
to the wayside as part of an international consensus to safeguard
new accumulation schemes and protect the system from its final
collapse. Unlike the left, which is disoriented and dislodged from
the old institutions and conditions of struggle that gave the old
workers’ movement shape, the world’s leaders find relative unity
in the willingness, among handful of competing blocs, to deplos
the same technologies of surveillance, incatceration, intema ant
external policing, and war to bolster their territorial claims and the
interests of their more prominent individual capitals.

Occupied Palestine is one laboratory among many for maintaining
affluence amid this sustained "crisis. ~Following the 1997
establishment of the Greater Arab Free Trade Area and the 2003
invasion of Iraq, capital in the Middle East has consolidated—as
seen in the 2020 Abraham Accords normalizing relations with the
UAE and Bahrain—and been integrated into global circuits. The
Zionist entity is also on the receiving end of large flows of migrants
from Africa and East, South, and Southeast Asia, drawn on to
implement its projects. Notably, the majority of Palestinians in
Gaza have not been permitted entry to work since 1993, when the
Zionist state sealed Gaza's borders following the first Intifada.
During the decades following, the regime began “To reorganize
labor markets and to recruit transient labor forces that are
disenfranchised and easy to control.” In particular, migrant
laborers replaced Palestinian surplus-proletarians as a flexiblé and
cheap labor market input, rendering the present genocide
economically feasible in light of the global integration of border
regimes and increasingly tfansnational labor markets.

Globally, migration rates have skyrocketed s those who can
escape for more stable and temperate zones with more capital and
competitive labor markets do so. These migrants are at once shut
out and drawn upon as needed to implement what the managerial
middle class has determined is necessary to maintain bourgeois
consumption standards; they serve as floating labor reserves for
increasingly predatory individual capitals. From the American
Southwes? to Australia, core states have accomplished in their
border enforcement what was once only achievable thmu%h
apartheid. Likewise, migrant laborers in Israel “do not need to be
subjected to the apaitheld system imposed on Palestinians because
their temporary migrant status achieves their social control and
disenfranchisement more effectively, and of course because they
are not demanding the return of occupied lands and do not have a
political claim to a state.” This ejection from access to labor
markets leaves the Palestinian people not as a traditional surplus
population, leveraged to keep the price of labor cheap, but as
surplus humanity, Split off from the cycle of capital accurhulation
that binds Israel to the rest of the world system. On this point, the
imperatives of international capitals and the Israeli settler state
happen to agree—though it would make little sense to imagine the
genocide in Gaza as driven by purely economic motives.

Fueled instead by a combination of economic imperatives and
deranged ethno-~religious fundamentalism, the genocide is a war
of annihilation that attempts to empty Gaza of native inhabitants
by a combination of maximal mass murder and minimal forced
ejection, after which the entity will convert the land into space—“a
perkingot,” in the words of some American officials-—imagined

some as the future site of an Edenic paradise. But it is not clear
whether ' these fantasies of resettlement will outlive their
ideological shelf-life: attempts by settler factions to enter the
north of Gaza during the opening of the genocide were not
enthusiastically endorsed by the state, for example; at any rate, the
wholesale destruction and ecological devastation wrought by the
military invasion will render any future resettlement in many
places difficult if not impossible. To our understanding, 2005’s
“disengagement” and the shift to Gaza’s Bantustan-liKe status
sidelinéd"settlement aims in Gaza. The presumption that the
settlement-driven wing of Israeli civil society and the
annihilationist techniques of the Zionist military are in agreement
on the long-term goals of the genocide assumes that an ideological
agreement among parties suffices for a shared strategle visioh of
the settler state’s future. We should not underestimate the political
and cultural divisions that may lead the so-called Israeli Defense
Forces (IDF) into a blind alley.

In occupied Palestine, then, we see a grim vision of the future: an
increasingly ecologically endangered racial regime with a fascisiic
white Pogu lation clinging to ifs consumption standards with a
controlled rate of migration from racialized external populations,
Some laborers are stuck at the border, while some are permitted
entry conditional on their below-market-average employment
and often backed into unthinkable labor conditions by their
employment-conditional _visas. An internally immobilized,
racialized population converted from labor surplus to mere
obstacle—now facing genocide as punishment for a refusal to be
penned in and killed at will. Economic forces alone do not explain
the zeal with which Israelis are liquidating their neighbors; the
murderous, - settler-colonial ‘ideology of ~Zionism provides a
visceral and emotionally charged political identity through which
the aggressors in a century-long genocide, armed and stupported
by the Tost powerful nations in the world, hay view themselves as
underdogs and victims as they mete out the very atrocities they
accuse their victims of perpetrating.

After decades of repression and slaughter, what remains of
revolutionary resistance in Palestine? Since October 7th, Fatah, the
largest group within the Palestine Liberation Organization, has
rerained silent, as its goal of peaceful compromise with America
and the Zionist state has failed. The Marxist-Leninist Popular
Front for the Liberation of Palestine (PFLP), historically the voice
of the Palestinian revolutionary left, declined in the wake of the
collapse of the Soviet Bloc and, more lm%ortantlfi, since Israel split
9ff Gaza from anything approdching a labor market integrated into
its national economy. In the gaps left where historically secular
nationalists and communists stood, Islamic resistance Eroups like
Hamas have surged in popularity. Like Fatah, Hamas Ras always
been a free-market, nationalist, capitalist party: it raises its funds
through heavy taxation, and its wealth lies in investment
portfolios held primarily in Turkey and the Gulf states. It has risen
to power as the floor fell out from under the conditions that
supported the old vehicles for struggle and as every other path of
resistance has been met with extreme repression. It is not,
however, the only participant in Palestine’s armed struggle-
October 7th’s Al-Agsa Flood was planned and executed by a
coalition of armed organizations, and subsequent demands by
spokespeople of the Palestinian reSistance demanded the freedom
of non-Hamas political leaders as well as Hamas affiliates.

Last Januagy, the New York War Crimes ran a fascinating piece
exploring “The Black Liberation Movement and the Struggle for
Palestine.” The paper translated a statement by Abu Ghassan, the
imprisoned Secretary-General of the PELP, which proclaimed
“[f)rom inside the occupier’s Ramon prison” that from “Ansar to
Attica to Lannemezan, the prison is not only a political space of
confinement but a site of struggle.” Throughout the wave of
encampments, these functional ties between American and Israeli
police and prisons have been emphasized rhetorically by many
activists. However, the issue’s politicization has often stalled in
identifying a_common enemy instead of entering into the
conditions of struggle that unite and separate Gaza from places like
the South ide of ERicago.

‘The lessons we might learn from the Palestinian resistance require
translation into our domestic conditions, which is not to say
they're the same. For instance, while Palestinians have been
severed from Isracli labor markets nearly entirely, the continued

et precarious employment of Black proletarians on Chicago's

outh Side, while they are at the same time managed, killed, and
caged, indicates their fragile relevance to domesti¢ individual
capitals outside of the prisons has not yet run out. In an
mcreasmgg/ interconnected world, the same system metes out
death and devastation to thése geographically separate
populations. It will only be through comrmon struggle across these
and many other lines of globalized class stratification that we can
decisively defeat capitalism. The question is not “Where to begin”
because resistance is everywhere. The question is: “How can this
resistance be generalized, clarifying in the process its enemy and
the “we” who oppose it?””

In America, as in Palestine, struggle is defined by the contradictory
character of the people and groups who make it. The political limits
of our times are the limits of the class fractions who command and
system-level restructurings that define the terrain for the
movements we enter_into—in Palestine, the decline of the
revolutionary left and the rise of liberal-religious armed struggle
factions following the Zionist state’s slide into crisis-ric EFE!’]
restructuring. In°America, similar economic transformations
deformed rebels into a new category: the activist. In the 1990s,
following the twilight of the workers’ movement and whatever had
existed of a revolutionary left, people adopted a model of political
struggle to match the time: 'the corporate campaign, in which
depoliticized participants accidentally united around short-term
tactical questions related to fighting an individual corporate entity,
absent a broader transformative vision. Most famously,
environmental activists around the turn of the 2ist CEnlurK
adopted this model, and it has more spectacularly re-emerged wit]
Palestine Action’s sabotage campaigns against Elbit and the PYM's
#maskoffMaersk campaign. Its foundational assumptions also
define the basic organizational unit of the campaign for the boycott
of, divestment from, and sanctions on the state of Israel. Piecing
together the mark of this_organizational form on ‘campus
activism’ will help clarify the limits and potentials of the campus-
based struggle for Palestine.

II. Bring the War Home

While the U.S. wing of the movement opposing the colonization of
Palestine predates the state of Israel itself, it suffered a lull after
the defeat of ts proponents in the Black Power movement during
the 1970s. Flurries of activity briefly punctuated this overall decliné
in_action’ and consciousness in Solidarity with the Palestinian
struggle in 1982 in opposition to the Israeli invasion of Lebanon
and, to a lesser extent, in 1993 following the betrayal of the First
Intifada through the Gslo Accords. In the early 2000s, when the
anti-war movement in the U.S. connected with the Second Intifada
in Palestine, this movement experienced a wave of new organizing
that would prove more durable than previous iterations—
particularly on college campuses.

In 2002, the previously marginal Students for Justice in Palestine
(SJP), founded in 1993, saw an explosion in its membership,
spreading to campuses across the U.S. SJP inherited from the 19905
a strongly decentralized structure designed to allow for political
work atong a deeply poliically divided constitdency (analyses of
the state of Israel as a settler-colonial apartheid state, or of the
two-state solution as a dead-letter cover for worsening settlement
of the West Bank, were still hotly contested within thé movement
at that point). This largely uncoordinated but ultra-visible activity
of Palestinians_and anti-Zionists on campus had provoked a
reaction from Zionist politicos and funders: students founded
several new Hasbarist organizations with explicitly campus-
focused missions in response to pro-Palestine student groups.
Building on this work, the David Project waged a ruthless fight
against anti-Zionist scholars starting at Columbia University in
2004, On the other side, in 2005, a coalition of Palestinian trade
unions and civil society organizations released the call to Boycott,
Sanction, and Divest from those responsible for the ongoing ethnic
cleansing of Palestine, providing the fledgling student movement
with a unity of purpose which persists In the movement today.
Within a few years, campuses had become the centrai

battlegrounds in the ideological fight over Zionism and Palestinian
self-determination in U.S. clvil society.

SJP’s influence, and that of the BDS Movement, only grew in
successive years as Israeli politics lurched to the right, producing
multiple new offensives on Gaza. Since the start of the Secon
Intifada, no student has completed a_4-year course of stud
without'a Significant incursion by Istaeli Occupation Forces (I0F)
into Palestinian territory and an accompanying massacre_of
Palestinian civilians. In this context, BDS has proven remarkably
effective at shifting popular consciotsness around the Palestinian
struggle and laying the groundwork for the current outpouring of
anti-Zionist resistance. This conjuncture has _produced ~an
overwhelming political shift, particularly on campuses, where
large majorities of constituents were young enough not to have
bech politicized during an earlier period of hardened pro-Israel
hegemony, with more obvious localized stakes, targets, and
dernands of the struggle for Palestine.

Meanwhile, the past decade of campus activism has proven
inseparable from the growing realization within American civil
society that its history, culture, and state are bound up in a white
supremacist labor regime that condemns whole strata of its
population to unyielding misery. Student critics of their client
universities _are increasingly encouraged to articulate their
grievances in the theoretical registers of settler colonial studies
and the Black radical tradition. It is thus unsurprising that the
movement of the encampments captured the imagination of the
US. left and saw some of the most militant, most advanced
confrontations with the state since the 2020 George Floyd Uprising
emerged on college campuses. It is no accident, moreover, that this
most fecent wave of struggle was born at Columbia University —the
site of the David Project’s first anti-tenure campaign and the
hotspot of the anti-Zionist struggle for a generation—of that it has
begun to articulate its aims in continuity with domestic struggles
against the police. The campaign for boycott, divestment, and
sanctions has gradually migrated outside the University with its

raduates: those industrial sectors most impacted by pro-

alestine labor organizing since the start of the current genocide in
Gaza—education (pre-K -1 and higher ed), healthcare, nd tech—
ate comprised of College grads, many of whom were themselves
involved in Palestine orgarizing.

As significant as these adyances in popular sentiment have been,
we shiould retain a sense of perspective: After nearly two decades o
campaigning for divestment at campuses across the country, only
a few minot holdings have divested, and the explicit political
horizons of the movement have remained narrow, hemmed to the
BNC's nonviolent pressure campaign. The movement’s life beyond
its campus-based origins has beeri confined to the sectors of the
middle class that itS college-educated participants left their
universities to populate. Repression of the pro-Palestine student
‘movement and its allies has only worsened. And at the level of the
state, a seismic shift in popular consciousness finds politis toda
with a tiny mmon!&/ of milquetoast liberals—the likes of whicl
Eppulgted the U.S. Congress in scores during the 1970s—while a

ipartisan Zionist coalition has pushed forward increasingly more
draconian measures at all levels of government aimed at défanging
the BDS Movement’s push for university divestment before it can
score a single sizable win.

These measured successes bear the marks of their origin in a
similarly-circumscribed political scene: campus activism, which,
aside from being undercut by the routine churn of participants as
classes graduaté and non-tenured professors face reprisals for
involvement, fosters a characteristically managerial political
environment. Many of the drawbacks of the traditional “SHAC
model” pressure campaign apply even more emphafically on
campus. Participants exert only consumer-side leverage over their
uPpDnems, Dr%amzers understand themselves in their ca?aqlly as
students and formulate their political commitments relative to
visible university administrators, not even the ruling boards of
trustees; political education tends to stall out at Holding the
university’s actions up to its supposed values as if the
demonstration of a contradiction between the two is itself a
victory; most importantly, a persistent gap separates a bloc_of
organizers who plan_to merge their “student activism” with
careers to come, and the organizers whose political horizons
exceed their future job applications. Such a gap flows from the
focation of universities in fhie reprodtiction of capital and American
culture: students pay (or are paid for by the institution) to invest
their _post-graduation labor power with specialized skills and
accolades that will grant them'a seat in an unstable middle-class,
with one foot on either side of the capital relation. Far from
pushing students to undermine_their. class position, this—
combined with the precarious situation of the sectors of the middle
class into which they'd like to enter—tends to silo them off from
recognition of their impending proletarianization.

This unstable combination turns student organizing into one of
many sites at which a new proletarian self-understanding might
emerge as downwardly mobile university attendees stumble into
confrontations with the state and capital, both anxious to shore
themselves up as the present crisis deepens. But this requires de-
exceptionalizing any student activist campaign, removing it from
its elite trappings, and attempting to bridge campus polifics with
other strugglesin the surrounding area, if not the world. For
instance, a chant in our movement notes'that police are “Israeli
trained”} many involved in the struggle for Palestine point to
university backlash to demands for divestment as proof that the
movement winning its current demands would fundamentally
destabilize the existing order, itself imagined to be ideologically
Zionist. This conception s false—and frankly, whether
administrators care one way or another about the state of Israel has
nothing to do with the uniformity of their responses to divestment
campaigns. Bt a movement that undetscores the complicity of
American civil society institutions in the genocide in Palestil
pulls on a loose thread that could exhibit, if followed, the
Inseparability of all of our struggles.

An_inventory of any given university portfolio—and a full
explanation of why American police train alongside their Israeli,
Chinese, or Indian counterparts—would offer Student activists a
cross-séction of a world system in which international
architectures of state repression protect a transnational capitalist
class that is increasingly conscious of its short-term necessities,
all of which will prové incompatible with the life of the world’s
poor. To date, American labor has not risen o the May Day
emands of the Palestinian General Federation of Trade Unions: an
end to American manufacture and transport of weapons to Israel,
reflected in trade union policy; a material campaign against
companies_participating in Istael’s genocide in Gaza, and a
complementary campaigh aimed at the United States government.
The radical edges of disparate social movements and trade union
campaigns have attempted to meet this practical minimum.

Last month, radical rank-and-file in the University of California
schools publicly broke with the pressure-campaign political
horizons of their UAW local, attempting to push beyond trade
union consciousness and legally circumscribed tactics:

Rank and file union members have demanded elected UAW
leadership... follow through with concrete action, and leadershij
has ignored this call to action. To this point, the Rank and File
collective is calling for [...] the collective withholding of labor in
support of Palestinian liberation. We are not interésted in the
dictates and boundaries of the ULP strike, as we challenge its basic
premises and assumptions... [W]e see it as a moment [to] begin to
effect a substantial material impact against both the Zionist
settler-colonial entity and the Amerikan racial capitalist-
imperialist state.

Consternation from those willing to tail the social-chauvinist
majority in the trade unions misses the trend embodied by this
unlikely statement: the UCI radical Rank and File’s expansion of
the political horizons of the Palestine movement fo include
confrontation with the American state is part of a broader
escalation of the strategic stakes of the movement itself.
Throughout the country, counter-info sites and communiques
suEply agrowmg list of autonomous actions that have matenallé
subverted occupation, domestic or Zionist. The NYC-base
organization Within Our Lifetime (WOL) has likewise begun to tie
the liberation of Palestine to domestic struggles against Cop City,
from Atlanta to New York and beyond. WOL has taken shape
alongside Columbia’s deeply politicized and dedicated SJP chapter,
Which has remained a NOTLiT STar of the mOVement since Proving it
heroism in the Columbia occupation, In the year to come, these
true leaders of the Palestine solidarity movement have the
opportunity to facilitate increasingly _interconnected,
experimental struggles agalns the white supremacist ruling bloc
of global capital. And those of us in Chicago and cities like it, where
the movement has been demobilized and reduced to perfunctory
marches and symbolic acts of speaking truth to power, must take
note.

II1. The View from the Lawn

Following the Al-Agsa Flood and Israel’s immediate ground
invasion and bombing campaign of Gaza, political action surged
globally, as both Ziotist and pro-Palestine crowds mobilized to
emonstrate in streets and squares around the world. Specifically
in the United States, while organizations held demonstrations in
most large cities, the movement gained notable momentum on
several university campuses, initially at major private universities
like Harvard, N ahd Columbia. In the months to follow, a
sustained campaign of doxxing began against pro-Palestine
student activists from Zionist groups ke Canary Mission and the
vaguely fitled Accuracy in Media, tarring them as antisemites and
calling for firings, as well as investigations into antisemitism on
collegé campuses by the schools, the FBI, and the US Department
of Education as violations of the Civil Rights Act; investigators
began looking into Islamophobia on campuses on the same basis.

On April 17th, 2024, students at Columbia University placed about
seventy tents on a campus lawn, claiming the space as a “Gaza
Solidarity Encampment.” Despite being cleared quickly, the
practice caught on at campuses across the country, with students
at over 130 campuses creating encampments_since. Currently,
these have all been voluntarily dismantled or dismantled by the
cops, with varying degrees of police violence at each; the
photographs and videos taken of cops at Ohio Staie University,
ndiana University, Emory, Columbia, and UCLA, to name a few,
speak for themselves.

on_April 25th, Chicagoland had its first encampment at
Northwestern Universi in Evanston. Excluding one initial
confrontation with the police, the camp was incredibly peaceful
and inoffensive, It ended in capitulation after five days, with the
university granting some symbolic victories in return for an end to
what minimal niisance the camp presented. By the time
Northwestern's _encampment had _ended, the University of
Chicago’s had begun, and one formed at DeFaul University shortly
after. DePaul’s encampment lasted the longest in Chicagoland,
going a little over two weeks until the Chicago Police Department
Faided it; we hope participants from these camps are taking similar
stock of what specifically went down at each.

Organizers originally slated the University of Chicago Popular
University for Gaza for the morning of May 1st on the university’s
Main Quad, This relatively late daté was in line with the national
SJP network’s “Popular University for Gaza” campaign, which had
pointed to May Day and graduation days as specific dates for calls
to action when national $JP first launched it on Sunday, April 21,
But given the urgency of the moment, the very announcement of
this ‘campaign became the green light for encampments and
occupations, with the specifics of timing left to the judgment of
local organizers. Unprepared for immediate deployment, our plans
grew around the May Day launch more than a week away, as we saw
¢ach day more images of dramatic scenes coming out of the
campuses that were quicker on the draw.

Our campus coalition, UChicago United for Palestine (UCUP),
elaborated plans for the encampment throughout several drawn-
out meetings. As an umbrella of several student activist
organizations, UCUP comprises such a diverse cross-section of the
conscientious’ part of the student body that it defies neat
dESCrlpllon. At the same time, the initiative and tempo of the
coalition and its constituent groups are firmly in the hands of a
relatively small number of Student organizers operating in a
readily identifiable way. When a clear éncampment leadership
body called Core eventually emerged, this small but effective
cohort of political moderates would take control of representing
the encampment publicly and eventually succeed in pushing theit
rivals away from decision-making.

This moderate bloc consisted of budding career activists and social
‘movement managers who were “incubated” by the professionals
of long-standing ~networks of activism-oriented NGO,
philanthtopic _foundations, and other liberal advocac

organizations that double as tax shelters for the ultra-rich an

wotk assiduously to marginalize revolutionary challenges to
capital and the state, Tt scems a large part of Such “organizer
training” is how to take power and hofd ohto it for reformist ends,
even in settings that pretend to practice direct democracy. We will
call this element of Core “the careerists” to distinguish them from
the radicals who participated in Core, who we canse to respect and
admire, and who were unfortunately marginalized.

If asked to define themselyes, the careerists would likely start by
placing themselves in 2 long, tradition of student acivists o
Campu and in the wider Hyde Park area who have worked to
advocate and raise awareness for unjust university practices and
priorities. While this tradition certainly includes political radicals
fiartlcularly the cohort that went through the George Floyd

ebellion, the turnover rate inherent to the university keeps this
tradition ‘generally abstract beyond the immediate people one
meets, with s actual upper limit being those students about to
gradudte when one first arrives. This Tack of concrete tradition
Creates a sustainability problem, as the institutional depth
required to maintain the organizational capacity to consistently

act_politically radically depends on the current cohort’s
backgrounds and lives outside the group more than it would
otherwise. Thus, when most of the cohort is timid or just goin
through the motions, it is an easy justification for extern
Brotesslonal nonprofiteers to step in as mentors and shape them in
he image of their abstract activist ideal. While the more conscious
careerists may abstractly identify one way, many of their concrete
traditions primarily exist off campus.

While we met individuals within the central decision-making body
with intelligent and courageous analyses and proposals, the
IModerates oatmaneuvered them in lengthy bureaucratic meefings.
In response, the frustrated radicals defected from the central
leadership in the ones and twos, skipping general assemblies and
backing away from the camp. Others volunteered for necessary
functions like kitchen work, and this division of reproductive labor
removed many voices from participation in decisions. In a crucial
‘missed opportunity, we and other radicals never formed a coherent
opposition bloc “or fought to marginalize the emergent
inexperienced leaders disinterested in keeping the camp going.

The careerists, often as meeting facilitators, successfully framed
discussions of the planned encampment around the dominant
theme of “safety.” They schematized this according to three color-
coded roles: Red, Yellow, and Green, which campers initially
understood to mean levels of risk of arrest, with red roles facing
high risk, green (entirely of -site) facitg none, and yellow
somewhere In between. Going over these roles took up the lion’s
share of discussion it general camp-planning meetings. This
dominance is_partially because independent ‘working_groups
coordinated plans for other practical concerns such as food,
supplies, cate,secuity, and the zero-Tour deployment plan, But
hindsight, the seeds of dividing the camp with the ideology of
“safety” 'and marginalizing those who sought to build a
threaténing occupation were in place from the beginning.

Nonetheless, this would have been difficult. The encampments
represented ‘an act of commoning, building shared spaces_for
living, thinking, and experimentirifz with politics together. The
history of capitalist modernity is the history of commons being
violently erased from the earth—including, as scholar Peter
Linebaugh has argued, in the current genocide in Palestine—and
replaced with societies where the bounty of the Earth and the life
that populates it, have value only insofar as individual people,
whaose hoarding and laying waste to life is the foremost expressiort
of their individual “ight can buy, sell, pollute, and ultimately
destroy it. Most of us trace our polifical awakening to moments of
collective political action when the sel-defeating egoism and
alienation of capitalist society temporarily break down. A new
sense of the possible s opened up by the bold and decisive actions
taken by hitherto anonyinous people, opening the possibility for
new values and ways of living. In recent years, the formation of

commons as a response to austerity and social crisis, no matter
how fraught in practice, has revealed a deep need for community
and belonging in a world hostile to it. The challenge facing those
who related to the camp as an instrument to manipulate toward
cynical ends lay in the powerful collective energy that emerges
when masses of people experience that another world s viscerally
possible:

As highly publicized occupations and confrontations unfolded
across several campuses during that last week of Apri, the sense
among us that our coalition was unduly hesitating generated some
anxiety. However, the highly siloed planning process meant that
the original launch date Rad considerable inertia behind it. It was
only due to amole that plans changed. On April 24, one week before
the original launch, ieaks from the main encampment Signal chat
were published by the Chicago Thinker, a right-wing student
newspaper. As many participants in the chat had also béen using
their real names, panic broke. Participants nuked the chat, and a
more trusted core built a replacement and moved the launch date
to Monday, April 29.

Monday, The launch of the encampment met no snarls. About two
dozen of us, tents in our bags, were to mill around casually on the
Main Quad'and wait for the signal: campers carrying the large
apartheid wals from an earlier SJP art installation i (rom the
street. Then those of us with tents would set them up all at once,
while everyone else in the vicinity would be on hand to get between
the tent-builders and any interference. All of this happened
according to plan and without any confrontation. Though acting
quickly on a well-coordinated and instantaneous signal was
certainly an advantageous move, it was likely the leak of the
original launch date and our change of plans that misdirected the
campus police: the Hyde Park Herald later quoted a UCPD
Tieutenant saying: “We weren’t expecting this until Wednesday.”

Within a few hours, the encampment expanded to cover much of
the western half of the Main Quad. Most of its footprint consisted
of sleeping tents, initially arranged haphazardly. The food tent was
centrally focated next to the central walkway, blocked off at both
ends by the apartheid walls. Meetings and prayer occurred in an
open space near the food tent. On the southern edge of the camp
was a welcome canopy, a medic tent, various supplies tents, and an
art build area. A short fence separated the camp from the central
Quad wallaay, soon adorned with art rom collective “art builds,”
where campers painted items of camp defense like perimetér
barricades in a festive environment. Two autonomous zine distro
tables had quickly sprung up in g central area and distributed
‘mostly insurrectionary anarchist zines and stickers, including an
impressive collection of first-hand accounts dnd strategic
reflections on unfolding encampments across the US, Campers als
set up a lending library of mostly Palestine-related books in the
same area.
The presence of such unapologetic revolutionary literature in a
central location caused some consternation among leaders of the
encampment; It did not help that the distro-ing anarchists arrived
and remained in full black bloc attire that readily marked them as
radical outsiders. In_the end, they dissuaded the concerned
organizers from making any iritervention as long as the distros
were clearly labeled as “autonomous” so as not to be
misapprehended as the authorized voice of the camp. They
remained in_their central location and were the only people
distributing literature throughout the encampment, apart from
the occasional wayward Spartacist or stalwart disciple of Bob
Avaldan. UCUP had planned several days of programming, which
went ahead according to schedule, These evenfs included guest
speakers: Bill Ayers of the book Fugitive Days, local DSA Alderman

jyron Sigeho-Lopez, and speakers from Jisoot, the U.S. Palestinian
Community Network, and the South Shore community
organization Not Me, We, alongside teach-ins, workshops, group
discussions, and musical performances.

However, after several days had come and gone and the pre-
planned programming had been exhausted, the opportunities for
political - education “increasingly became spontaneous and
perfunctory. Some events amounted to little more than a ritual for
speakers to talk to a crowd. As for the teach-ins—whose topics
ranged from Medical Apartheid in Palestine and Jewish Anti
Zionism to the 1968 DNC Protests and the Occupy Movement—
guly time will tellIf they were effective in reaching new audiences,
The ad-hoc nature of their organization, especially as time went
on, was a casualty of the unsustainable system of feminized
reproductive labor in_ the camp and contributed to a missed
opportunity for a coordinated political education strategy aimed at
broadening support for the movement among the curiotis students
and community members wandering througfi the camp.

The general assembly proved the most available check on the
careerists’ thetoric and power. Typically held twice daily, the
general assemblies presented themselves as important decision-
Thaking bodies for sundry practical matters surrounding the
encampment, especially the impending threat of attack and
eviction. These were the main touchstones of the collectively
organized life of the camp, where we had the opportunity to voice
our opinions, hear each other’s thoughts and concerns, and offer
proposals regarding the encampmentand its irection, They were
also where thie student negotiators presented their updates on the
negotiation process with the UChicago administration. Facilitators
invited attendees to brainstorm strategies and tactics and
provoked interesting political debates.

However, these meetings were primarily facilitated by the
careerist$ and those they trusted. Their orientation and mode of
thinking were most often along the lines of liberal professional
activism. Despite the appearanice of deliberation, we noticed
immediately that these careerists considered the assemblies to be
transmission belts for decisions they had already made behind
closed doors earlier in the day. When attendees took the assembly
serlously and presented alterhative political visions, the careerists
met them with jeering hostility, shopworn privilege baiting, and
whispers of “outside agitators,” “horizontalists,” and
“anarchists,” which were sadly enough amplified, we learned, by
purportedly'suppartive faculty members on the UChicago Facilty
for ‘Justice in Palestine listserv. The extent of these faculty
‘members’ roles in limiting democracy within the encampment is a
story that largely remains to be told.

‘The general assembly form, of course, lends itself to inaction. As
challénges mounted, the careerists effectively ran out the clock
each day. Nonetheléss, the problem remained that they were
increasingly out of step with those in the camp who took the
encampment’s goals seriously, namely that we wouldn’t leave
until divestment, As members of Core began to break ranks, we
learned that roughly half of them never wanted the encamprment.
Encampments onl other campuses had effectively forced them to
take action lest they appear insufficiently dedicated to the cause.
Once the tents went up, they immediately began plotting a

fied exit. But as the encampment wore on, an increasing mass
of Its rank-and-filers took this rhetoric seriously and planned to
defend the camp against eviction and escalate the action toward
winning its stated goals. Thus, as a powerful bloc within the
encampment’s self-prociaimed eadership quietly advocated for
its demise, a growing number of us made the facade of a pro-
Palestine encampment into a reality.

Tuesday. The camp continued to grow, with students and
community members arriving to spend time there, whether just for
the day or to sleep overnight. More politicians came, and more
faith leaders preached and fed services. The camp remained on the
western half of e quad but expanded unevenly, Rectangulat
pieces of plywood appeated that were enthusiastically painted and
assembled into shields.

Core called a morning general assembly, asked campers to sort
themselves into “high” and “low” risk roles, and then separated
Beople into separate meetings. Core facilitalors began by asking
he high-risk roles on the camp’s first full day what concessions
would"be sufficient for them to go home. Many of us echoed
different aspects of the “Disclose, Divest, Repair” demands
released when the encampment first went up, indicating our
unwillingness to leave without achieving at least one of these
demands. In response, the student leaders said they would stay
until_divestment and disclosure. Many of the rank-and-file
‘members of the encampment, ourselves included, took them at
face value and echoed their willingness to fight until the end. One
point of agreement between our two separated groups was that we
wished to avoid at all costs the weak compromise that led the
encampment at Northwestern University to self-destruct.

After this meeting, some campers moved the large walls from the
middle of the walkway to a more obstructive position until they
were stopped by appointed “marshals” and moderates within the
leadership. At that point, they had already done the deed and
moved the barriers. This pattern continued to play out throughout
the encampment: a minor “escalation” (if one could even call it
that, considering the kind of tactics displayed on other campuses)
would occur, be str)?‘ped then it would have already happened to
enough of a degree that they could not take it back. A few careerists
also wasted time condemning acts that had occurred overnight,
from graffiti callmglon the encampment to “Escalate for Gaza!”
spray painted on buildings to the ripping down of a string of Israeli
lags, which led to the individuals allegedly involved being
‘harassed both by cops and camp marshals. There was a consisten
knee-jerk response among a small cohort of self-styled leaders to
throw anyone to the left of them out to dry as a gesture toward the
UChicago administration that they were the "good protesters”
who they could trust with a seat at the table.

Meanwhile, the camp marshals, who were technically there to keep
campers safe from cops, Zionists, and other creeps, proved to be
less interested in protecting the cmp~as seen in their inability to
stop arrests or intervene in real moments of conflict between the
encampment and UCPD or Zionists—and more about mandatiny
“acceptable” forms of protest within the camp. Their suppose
authority also confused the camp: when people spotted a marshal
funning somewlre, people followed then, assuming support was
needed, only to find the marshals concerned with scolding another
unapproved “escalation.”

After nightfall on Tuesday, the large camp speakers that had played
music for a dabke teach-in only moments before were switched to
WKCR 890, Columbia University’s student radio station. The
cheerful aftérglow from the dabke lesson quickly subsided as we
gathered around to listen to WKCR'’s live reportage of the brutal
police raid on the Columbia protestors oceupying Hind's Hall. The
Wave of student encampments began with Colimbia, and as we
glimpsed images on Twitter of the enormous BearCat the NYPD
tsed to break through the hall's second-floor windows, the
bravery of the Columbia protestors was both a call to action a3 well
as an example of the forces of the state arrayed against the
encampments, Chronicling_the _difficulty of the ~UChicago
encampment in answering that call—with all the attempts and
fitful starts—is one of the reasons we decided to write this.

Réit%?s’? Afraid of Outside

A crucial attribute of the UChicago encampment’s tepid answer to
the call of history is the lack of support or involvement from the
Hyde Park/South Side community. In_these early days, the
encampment_was established and maintained thanks to_the
courage and determination of many, including a plurality with no
formal affiliation with the University of Chicago. The camp’s food
and supplics came from a network of community members, many
with no UChicago affiliation. Core put out calls for as many people
as possible to travel to the camp and put their bodies on the line
when the encampment was threatened by fascists or cops,
regardless of their connection to the school. The crowd cheered as
speakers a ralles celebrated the diversity of the encampment and
the necessity of community beyond UChicago joining in the
struggle. Although these organizers, in line with others across the
country, professed a desire fo break down the boundaries between
studentS' and community members, several incidents
demonsirated their inabilty and umwilingness to'protect non-
students.

Beginning on Tuesday, UCPD arrested, detained, or otherwise
harassed community Thembers and students, as cops targeted
them while they were leaving the immediate circle of the camp and
picked them off, either on the perimeter of the quad or while
passing through’campus elsewhere. The lack of a culture of de-
arrest and lingering deference to cops meant that though the
organizers of the camp professed the desire to erase the boundaries

een campus and community, the burden of police violence was
still felt most heavily by Black community members.

Moreover, while UCUP made some overtures to_activists and
organizations on the South Side for their participation in the
Encam[:mem, it did not unite the strugglg for Palestine Wl!h lh‘ell'
struggles once they arrived. The opposite occurred: university
police harassed them, camp leaders snubbed them, participants
shied away from them, and they went home with the correct
impression that this motement wanted nothing to do with theirs
At this moment, a gap between the encampmentas a cultural space
(an exciting time t6 sleep on the lawn and defy administrators) and
the camp as a political project (a struggle in solidarity with the
world’s poor) widened.

The same myopia that prevented these student activists from
‘making the necessary connections between the struggle in Gaza
and thé war at home would culminate in a fatal obsession with the
unnamed, unseen, yet all-knowing and manipulative outside
agitator. Used interchangeably with “anarchist,” It became a
liberal synonym for “mean person who disagrees with me,” as we
saw it indiscriminately applied. to UChicago studenlts’ and
community_supporters alike. With the apparent support of
Chicago facull, careerists consistently “deployed s curse
against those who disagreed with the careerists, including those
who simply demanded democratic decision’making at_the
encampment. It is, of course, a dirty political trick. Since at least
the anti-slavery’ movement of the nineteenth century,
mismanagers have used the outside agitator trope to divide people
fighting for liberation. During the George Floyd Rebellion, this
{7pe formed the basis o the argument that appressed peoplelmust
be guided by some nefarious unseen hand because they lack the
courage and commitment to fight back on their own. Similarly,
Zionists often suggest that Iran, ISIS, and other outside agitators
are secretly steering the entire Palestinian resistance rather than
ihe courage and fnifative of the Palestinian people. It was doubly
offensive to find the careerists and UChicago faculty members
spreading rumors about “outside agitators” running amok in the
encamprent, populated by dedicated activists willing to. put
themselves on the line for a free Palestine.

While the shameful history of the outside agitator trope is well
known, the particularities of the radical scene in Hyde Park cast it
in an eben stianger light. Given [IChicago’s relation to the South
Side, both in terms of the administration’s underdevelopment of
Hyde Park and Woodlawn, as well as the “radical” elements’
dependence on local organizing groups and campaigns for training
and support, this chatacterization of community members as
anarchic_strangers mindlessly wreaking havoc from campus-
affiliated organizers s not just ironic and misguided, but a betrayal
of the very same principles ostensibly espoused by these radicals
community and solidarity.

In this context, the term “anarchist” became a flexible signifier,
conveniently déployed to distance any problematic or frigltenin
individuals from the collective life of the camp: one reportbac]
recounts that UCUP withheld community support from a “Black
Southsider who was attacked on_the quad,” with marshals
explaining “they’re one of the anarchists.” The activist politicking
of the loudest careerist members of Core, its authors argue, stoo
directly in the way of the realization that Hyde Park “is a gentrified
neighborhood because of this filthy campus. These rich kids and
outof-state attendees are part of the reason police so heavily
penetrate the south side. Anytime UCPD harasses somebody within
the boundaries of Hyde Park and the surrounding neighborhoods,
itis a student’s problem.”

Past cohorts of student organizers understood this. In 2016, a
student group that campaigried for the trauma center in the South
Side wrote ina reportback:

Ourorganizing on campus has been unique because of our concrete
allyship with people who are most affected by the lack of a trauma
center...we have supported [the campaign] by organizing students on
campus and directing as many University resources as possble o yourg
Black organizers...

‘The extent to which student organizing on this campus had been
successful, whether regarding the Trauma Center campaign,
graduate unionization, of the occupation of UCPD’s police station
lobby in 2020, was directly correlated to the degree of involvement
from outsidefs, here defined as people who were not university
employees or students. Regardless of affiliation, these were people
directly impacted by Uchicago’s policies and policing who were
willing to fight, Indeed, “we are caught in an inescapable network
of mutuallé{," wrote’ Dr. Martin_Luther King, Jr. from his
Birmingham cell “tied in a single garment of destiny. Whatever
affects one directly affects all indirectly. Never again can we afford
to live with the narrow, provincial ‘outside agitator’ idea. Anyone
who liveg inside the United States can never be considered an
outsider.”

‘The parochialism of the careerists within Core extended further
than' the ordinary baiting of outside agitators to their very
understanding of the gerocide in Gaza itself, Early in_ the
encampment, we began Rearing the portmanteau “scholasticide”
almost constantly. Coined in 2009 by Dr. Karma Nabulsi of Oxford
University, this concept helps us make sense of the deliberate
targeting of Palestinian educational institutions by Israeli forces as
part of a genocidal effort to erase Palestinian culture. It can be a

elpful concept when situated within the multiplicitous facets of
Israeli genocide. But as the week wore on, we heard more and more
about Scholasticide until it seemed like this was the only thing
‘happening in Gaza. The reason for this, we discovered, was that the
careerists defined the UChicago encampment and its participants
by the distinct subject position of the elite scholar. At a time when
millions of people from countless backgrounds and occupations
were coming_together all over the world in powerful mass
demonstrations against Israel, they framed the whole
encampment as a matter of elite academics taking action on behalf
of academics. Instead of allowing the university to be a site of more
generalized struggle, they upheld the social division of labor and
focused on their career paths.

Itisnotan exagfieratiun to say that some careerists hung the entire
occupation on the concept of scholasticide. As negotiations stalled
and general assemblies became increasingly contentious around
uestions of tactical escalation, one prominent careerist argued
that the strategic horizon of the camp should be as follows:
Negotiators should insist that the university “acknowledge the
scholasticide in Gaza.’ If the university does not budge, Core
should prepare to cooperate in the camp’s eviction by the police.
The outcome of the camp, this organizer argued, would be a
victory: the “media narrative” In which® thé “UChicago
administration refused to acknowledge a scholasticide.” When
asked what media outlet he thought would care enough about this
issue to frame it this way, Desides the UChicago student
newspaper, the organizer grew quiet. To make matters worse, this
was a sidebar_conversation when this same organizer publick
avowed that the encampment would stay until divestment. Anq
even if he had succeeded in the plan to throw the whole camp away
on the “media narrative” of “scholasticide,” nobody knows what

that word means anyway.

“Modern capitalism’s spectacularization of reification,” wrote the
Siluatiunislgntemalional, “allots everyone a specific role within a
general passivity. The student is no exception to this rule. [Theirs]
is a provisional role, a rehearsal for his ultimate role as a
conservative element in the functioning of the commodm{ system.
Being a student is a form of initiation.” Any serious challenge to
the society the university thrives in must begin by rejecting the
particular identity of the university student or worker confinéd to
the parochial concerns of the ivory tower and removed from the
world’s toil. By forcing the definition of the camp within such
narrow parameters, the careerists sought to fix the definition of
the camp in the same terms as the capitalist managers of our
sodiety do: keeping stuggles siloed off from each other and
keeping their participants’ under expert control. An effective
‘movement must consider the university, or wherever else struggle
kicks off, to_play no privileged role in the global movement,
especially with regards to its specialized status within thé
capitalist division of labor, and to be instead the accidental location
from which people can launch a much more generalized struggle,
breaking down all walls that divide us in the process. In short, So-
called academics must abolish themselves.

V. Core and Periphery

Wednesday. With Columbia’s tear gas and broken windows fresh
on our minds, the murmurs of defénse and autonomy grew more
strident. In addition to the raid of Hind’s Hall, videos of the attack
on the UCLA encampment by Zionists aiding the police and the
attempted raid on Cal Poly Humboldt demonstrated the threats
encampments faced. The threat of police violence became even
more pressing when the Dean of Students, Michele Rasmussen,
threatened the encampment representatives with a police raid
UCUP had_denjed responsibility for the graffiti, so this was
evidence that “outsiders” had entered the camp; allowing the
university administration to claim “safety concerns” as an excuse
for dismantling the encampment altogether, Ironically, the
penchant of the careerists to red-bait theif political opponents in
the name of safety was putting us all in danger. In response,
student negotiators demanded amnesty for the negotiating
Tepresentafives, postponement of a police raid on the camip, and a
direct meeting with the President and Provost with spectators and
a faculty advisor.

However, the rank-and-file’s idea of defense was far more active
than the conciliatory horizons advocated by these negotiators.
Community members had erected more fences and barricades
through Tuesday night and Wednesday morning. Unfortunately,
moderate busybodies moved them back o uprootéd them by noon.
Amongst that day’s offical carmp schedule of teach.-ins and allies,
two shhield trainings happened directly under the noses of thesé
careerists. Those involved with coordinating them did so
beautifully; someone simply slid up to a hot mic; asked to speak,
and told people a “crowd safety” training would be happening, at
which people practiced defense drills, formations, and maneuvers
with these mobile barricades.

‘The shields, mostly particle boards colorfully decorated during the
previous day’s art builds, would become a significant point of
contention between the camp’s rank-and-file and the careerists
over what it meant to take seriously the oft-chanted mantra “We
keep us safe.” Indeed, the controversy they would generate
contains the dynamics of the entire encamprent in miniature.
Many comrades, particularly those with experience in parts of the
US that have seen violent fascist street activity since at least 2016,
considered it completely obvious that we would prepare shields
and conduct training for using them in formation. Meanwhile,
self-identified camp leaders and faculty members, with no street
experience besides gloritied parades, were openly hostile to the
shields and training throughout the week. We understood this
dynamic as a token of the urieven dissolution of civil society in the

nited States. Many Hyde Park intellectuals who speals truth to
power from the comfort of the most heavily policed neighborhood
In the US, where most fascists are (hilariously enough) afraid to go,
mocked the notion that self-defense amounted to anything moré
than linking hands and presenting your bare forehead to your
would-be attacker. Many of us have lived in o traveled to places
where vigilantes brutalize and murder leftists: the careerist and
faculty denigration of basic self-defense was a delusion born of
extreme privilege.

Though everyone at the encampment saw the same brutal acts
demonstrated against other encampments and occupations across
the country, particularly at Columbia and UCLA, our reactions were
sharply divergent. While the rank-and-file’s drive to actively
defend the camp against the university grew in response to these
events, the careerists in Core, formerly content to ride the
encampment’s popular momentum until it died out, grew
increasingly fearful of violent repression and, in turn, popular
politics against that repression, which they didr’t quite Know how
to wrangle. Their browbeating and crowding out of radical
elements in UCUP had paid oft, and these careerists were now the
faces of the movement at UChicago. However, it was increasingly
likely that this movement would be associated With open and active
hostility to the university and its response, extreme brutality. If the
Gareerists were previously content with going home when things
died down, it was precisely then that they began to constitute an
active tendency that wanted to dismantle the camp: we refer to this
tendency as the Surrender Faction.

After Tuesday’s conflict over the slight movement of the few
barricades present, more tents pushed the camp’s boundar
further northward. Light barriers and mesh fencing were erecte
around the North, East, and South sides of the camp in response to
incursions by people détermined to harass participants, including
a right-wing Streamer, constantly followed by campérs waving
flags and kefiyehs int his face, along with fascist frat boys,
uninged Zionists, and other obsessed sickos, Though campers
held several “de-escalation” training sessions, hostile actors were
previously able to walk through, the camp, because any kind of

arrier was initially deemed an “escalation” and thus out of the
question.

Wednesday was May 1st, and a May Day march elsewhere in the ci
had pulled many people away from the camp for the day. At general
assemblies, the push for alternatives to Core gained steam, as
campers advocated for working groups and a spokescouncil system
to replace the shadowy decisigrts Core announced twice daily. By
this time, a popular term circulating throughout the camp and the
social media sphere around the encampment movement was the
imperative to_pursue “escalation.” Unfortunately, this remained
hazily defined, and even when concrete proposals were floated,
such as the occupation of one of the encampment’s adjoining
buildings, the case was never compellingly made for why we
should undertake these tactics, or how they would move the dial
forward in the struggle, besides the tautology that they would be an
“escalation” and that would be good.

This is a self-critique as much as anything; we believed that the
logical next step_was to take a building, and we advocated this
position. But why? To what end? The most vocal proponents of this
plansimply pointed out that itwas happening clsewhere. As people
in favor of a revolution in the United States, we understand that
deepening tactical militancy can be a good thing, especially as it
helps cohere new associations of comrades who build trust while
building comfort with risk and breaking the law. We could have
‘made this argument plain and won some people over. But the
imperative to escalate remained ill-defined, almost an article of
faith. What was missing was a coherent and communicable politics
hehind all the escalatery posturing. In the end, the very idea of
“escalation” even ended up being appropriated to mean doing
nothing.

‘Thursday. In the morning general assembly, Surrender Factionists
presented aplan for endiri the encampment, Despite thebluster in
the speeches that a handful never tired of subjecting us to, they just
wanted to go home. They proposed to host a final Friday rally
before disbanding and framed this as a “strategic retreat.” They
also presented the Gaza Scholars at Risk program offered by the
university administration; UChicago would offer temporary
university status to a handful of Palestinian scholars to help them
escape the genocide. Though they had notyet discussed or released
full details fo the general camp, the Surrender Faction (ramed it as
a win, For our patt, we considered it a hostage situation in which
the administration made the lives of Palestinians and their families
conditional on the camp’s good behavior. Meanwhile, in the face of
demands for “escalation” from the rank-and-file, some Surrender
Faction organizers ostensibly agreed, then liberalized the demands
by arguing that “being here is an escalation.” They added that what
the university offered was good enough to settle.

Thursday was also the first day the camp negotiators, led by two
members of Core, met with President Alivisatos and Provost
Baicker. Though tho student negofiators declared to the President
and Provost they could not make final decisions for the camp and
would have to bring any proposals back to the final assembly, the
exact details of the negotiations remained secret. The meéeting
‘minutes would not be released Eublicly until the encampment hac
ended. At general assemblies, Core organizers shared highlights
and selections of their meetings with the administration; despite
Tequests to create a negotiation working group to involve the whole
camp, none materialized. Thursday also marked the concrete
appearance of the Surrender Faction, with an anonymous student
‘negotiator stating, I don’t want thi$ encampment to go on much
longer becauise what we have seen across the country 15 scary and
disturbing to me.” While this was happening, members of the
encampment wanted to do more than just sit afound in our tents.
That Thursday afternoon, as the pigs tried to take down two
Palestinian flags hung up on trees across from the camp, we
surrounded their ladders and chanted. Outnumbered and shaking,
they only managed to take one flag down before they fled. While
this was happening, other campers noticed the large flagpole in
front of Levi Hall ‘was empty. A Palestinian flag was quickly
attached to the line, flown up, and its line thoroughly taped onto
the pole. Protestors protected the flagpole from cops and
administrators with bodies and barricades for an hour in the rain
until efforts to take it down abated.

Rain continued throughout the day, and Core continuously pushed
back the second general assembly. It was not until nearly midnight
when we saw Core organizers hurrying under the rain towards the
outdoor cloisters between Swift Hall and Bond Chapel that the
campers realized that this was the awaited general assembly,
where Core would make decisions without their participation.
swarmed in, depriving them of their secrecy. At this meetinj
became clear that the Regotiators and the careerists were working
closely with the Coalition for Justice in Palestine (CJP)—ironically
enough, an outside organization whose involvemerit and direction
in negotiations UCUP had not disclosed to the camp. We also
learned negotiations had already occurred and that UCUP had
accepted certain conditions on behalf of the camp without any
camp-wide involvement or discussion. Citing the rain, which the
enclosure sheltered us from, as the causé for curfailing an
deliberation, facilitators rushed through announcements an
refused to talk about escalation. Instead, they introduced a CJP
‘member, who addressed the small crowd, attempting to convince
us to accept CJP leadership.
While we had been told the meeting would not include deliberation
due to time constraints imposed by the weather, CJP's professional
organizer filibustered at great length, touting his organization’s
immense resources and fluence. He aggrandized the group’s
weekly marches in the Loop, which had béen steadily declining in
participation since October, with no plan for moving beyond
stale form, And he promised that ifplaced under CJP control, the
encampment would receive a massive infusion of resources and
bodies in the coming days.

As he spoke, sighs and murmurs echoed throughout the assembled
crowd.” A quartet of women in hijabs shook their heads and
whispered among themselves; it was not their first run-in with
this organizer, and they were not impressed. Multiple attendees,
who had braved the miserable weather to have a discussion, spoké
out against the lack of transparency on display and the shameless
attempts of the Surrender Faction, who had been fighting
democracy within the general assembly since day one, to pass of
the camp to a third party, since they were themselves clearly out of
‘momentum. If the powet should belong to the people, why is it so
difficult for some’ organizers to relinquish control? Tired and
wanting to go home, these organizers preferred to install a new
sovereign rather than let the camp govern itself. This decision was
unpopular, but they successfully maneuvered to end the meetin
taking advantage of everyone’s tiredness from listening to the C
organizer’s rant as midnight approached. We left with enhanced
division and discontent, high tensions, and no sense of the way
forward for the camp.

It is worth reflecting on the sad fact that the careerists and CJP
found so many people in the encampment willing to take their

roclamations as commands and to help them resist calls for

emocratizing decision-making. A lack of collective political
experience petvading US society has produced a kind of activist
who relates to_polifical movements as some combination of
consumer and low-level employee, following the directives of
whoever represents themselves s in charge, especially if they can
pass themselves off as the representative delegate of an oppressed
group of people. Despite noble efforts by individuals and crews who
erelou on pre- existing political connections and were eventually
badjacketed for their troubles, no militant and serious opposition
bloc appeared capable of reversing the performative, reformist
strategic horizon set by the careerists.

We have since concluded that we erred by assuming all of Core was
a monolithic bloc that handed down agreed-upon diktats to the
mass of participants. We would later learn that Core was, in fact, so
internally divided that its meetings primarily served to wear down
and alienate its radical bloc, who then avoided the charade of the
general assemblies. Identifying and building ties with these more
Fadical organizers could have completely altered the face of the
encampment, especially given we ascribe no profound social or
political intelligence, or even charisma, to the careerists who kept
control of the camp. Instead, their success demonstrated a low
level of politcal literacy amdng the camp’s rank-and-file, who
most often simply did what Core Said; a ackof organization among
radical participants; our self-marginalized inability to consider
that we had more potential allies than we realized; and, above all,
the insufficiency of all radical participants to build an aiternative
bloc and political vision with which we might have contested
leadership of the camp.

Even if Core was more amenable to radical proposals, the ve
nature of the group as an informal, invite-only shadow council
would curtail ifs attempts at creating effective decision-making
rocesses. Even though such a sttucture could successfull

elegate tasks during the planning stages, its overworke
persannel could not manage and deferid the 247 on-the-ground
ogistical operation that is an encampment when secrecy and
security were paramount. Between drawn-out difficult meetings
where émotions ran high and fearful sleepless nights spent waitiny
for fascist violence, the organizers failed to see that the muc
larger community that had gathered around them had a direct
intérest in the perpetuation of the camp and the skills to
accomplish that task in a democratic and accountable manner,
without extraneous layers of “leadership.”

On _the other hand, the proposed models to “decentralize”
decision-making failed to escape their birth conditions. As
discussed above, radicals designed effectively the decentralized
ur%amzauonal models of the 1990s to” separate tactical
deliberation from any discussion of the movement's disparate
strategic horizons. In our case, the creation of a variety of working
gioups separated radicals, furfher preventing s from altering the
camp’s trajectory with surgical precision: careerists sidelined
disputes over their conservative vision for the camp or at least
confined them to communities of like-minded but provincial
militants, such as the Popular University’s “camp defense”
working group. Thus, the careerists were left to shape the broader
identity and aims of the camp. Ultimately, the same problems of
the camp's “periphery” bedeviled its “core,” but with fewer
avenues to resolve them since one tendency within UCUP could at
least make the camp in its image.

Working groups and spoles-councils, which we helped popularize,
allowed militants to find each other and laid the foundations for
relationships that would outlive the camp. However, movements
should be udged at amigimum by whether ey achiete theirends,
and the “decentralizing” organizational models proposed by well~
‘meaning radicals in the camp brought us no closer to changing the
trajectory of the encampment. Rather than well-meaning gestures
at democracy, which assume that those deliberating sharé a shared
strategic intelligence and political will, ong( rarely %lu_'n sed at the
encampment, it may benefit movement radicals to build their own

broader constituencies of like-minded and skilled militants who
can_intervene at opportune moments, connected to extant
organizations but not beholden to' the in-the-moment
conservatism of full-time activists. At the outset of further long-
term actions, we should also remember that an established
organization is difficult to meaningfully alter and push against
formalizing what initial secrecy measures may prove necessary to
get off the ground any substantial action. Abolish Core!

This point brings us back to the importance of coordination
between what ~radical _elements of official, aboveground
organizations exist and the larger, more spontaneously radical
raitk-and-file of any given ~movement—as thankless and
frustrating as this work may be. Radicalization of any movement
cannot _confine itself to_flashy (and, for many, alienating)
confrontations with organizers, symbolic escalations at protests,
or retreats into self-imposed exlles de-linked from the movement,
“Escalatory” actions can only become radical if they retain a crowd
to win over. This necessary step to politicizing any struggle
requires the long-tem establishment oftrust and shared strategic
ends; if leveraged correctly, gpportune moments may prolferate
to infroduce new, more radical tactics to more sympathetic crowds.
As the Palestine movement returns to campuses in the fall, this is a
question we and others will have to find new ways to answer.

VI. A Bang and a Whimper

Friday. Word spread around camp that some combination of
UChicago fraternities and the usual pro-Israel fascists had been
planning a large counter-demonstration around noon under the
fuise of 2 “pichic.” UCPD had removed the Palestinian flag flown
5nd protected on Wednesday without confrontation. Perhaps too
fate, "Core began asking campers to avoid asking others about
university affiliation, supposedly as a measure of protection for
non-students. The careerists were no longer concerned about
nefarious outside agitators since they now courted activists from
all over the city to rally to counteract the counter-protesters. This
dynamic is frequent in social movements, in which top-down
olganizers are willing to Use “anarchists” as shock troops and
cannon fodder, onclly to turn around and denounce them at the first
opportunity. This day was no exception.

Calls went out across the city to mobilize against the counter-
protesters on the quad, Unfortunately, alarmed messages had
already emanated from the camp and other Chicago encampments
several times, barraging outside supporters with frenzied demands
for action that most often simply petered out and were never again
remarked upon. Like in 2020, when constant breathless accounts
of “Proud Boys” who never seemed to materialize (and who
antifascists would have easily defeated if they had) inundated
Chicago activist platforms, these undisciplined, near-daily calls of
impending invasion served to desensitize people to the reality of

vigilante violence and, we experienced, kept some conflict-averse
people away from the camp when nothing was happening.

This time, however, there was substance to the rumor. As noon
approachéd, two groups gathered on the far side of the quad under
American and Israeli flags. The America camp was louder and more
belligerent, blasting racist songs like “Sweet Home Alabama,” as
the Zlonists did thefr best job of ignoring the fact that the only real
anti-semites on the quad were the men organized to march
alongside them. Once the combined counterprotest numbered
abou fifty, Team America led a march directly toward the camp’s
Eastern flank, led by prominent right-wing provocateur Arthur
Long, dressed in a cowboy hat and smoking a cigar. They did not
get In. Spotting their approach, many campers whom the careerists
and their faculty allies were already vilifying as “horizontalists”
and “insurrectionary anarchists” sprang into action and
confronted the vigilantes head-on. These courageous comrades
formed a shield wall that stopped the march and then, in a
disciplined maneuver practiced over the previous week, advanced
and pushed the fascists back one step at a time.

In the middle of this confrontation, key careerist members of Core
suddenly popped up in the ranks of the fascists, their backs turned
{o the men attacking the camp, demanding that the shield wall
backup and disperse: One would later appear in a viral video widel
celebrated for his courageous words outside the evicte
encampment. Thankfully, In the thick of the action, nobody
listened to him.

The shield wall and he willingness of some of the campers to
physically stand up for themselves proved to be too much for the
Invaders, and they were forced back and slowly dispersed.
Meanwhile, at the exact moment of this retreat, Chicago cops
began to appear on the camp’s Western flank Dozéns of tie same
pedple who had just defended the camp against one threat sprang
Into action, forming another shield wall around the rear perimeter.
The energy was electric. Campers distributed water and plastic
goggles 16 anvone holding a shield. Defiant lines formed on the

astern and Western flanks as Core’s rally began, where they could
give their usual speeches.

We cannot emphasize enough the excitement in the encampment
following this display of collective courage We saw s numbers
swell to fhe laxgest they had ever been, and a collective buzz of
enerey and entfiusiasm was palpable. We had seen what it could
look Tike to mobilize to defend the camp, and many people were on
board. Sensing this growing tactical militancy, several Surrender
Factionists would later try to vilify the people'who had defended
the camp, saying they had engaged in violence and had put
vulnerablé peoplé in danger, n a classic case of Orwellian
doublespeak At the same timé, we could not shake one scene in
particular: leaders of the camp’s self-proclaimed governing body

standing in a sea of vigilantes, turning their backs toward the men
who wished to attack the camp. When fascists and antifascists
square off in large demonstrations, police turn their backs on the
side they feel more affinity with.

saturday. The morning light revealed the growing fortifications of
the camp. The Surrender Factionists, forced to soften their anti-
radical sentiments by popular support for the previous day's
confrontation, stopped trying to tear down the additional fencin

and wooden barriers. While fegotiations and rallies continued ai
UChicago’s camp, elsewhere in the city, students of other
universities planned thelr actions and encampments, That
‘morning, students from the School of the Art Institute of Chicago
set up their encampment on the lawn of the Art Institute itself.
Their encampment quickly drew a sizable presence of CPD and an
armed SWAT team, and when rafded only Hours after being set up,
faced a brutal police response that never fully materialized at
UChicago.

At that evening’s general assembly at the UChicago encampment,
a representative from CJP, who had yet to muster virtually
anything in the way of the promised resources or bodies for the
camp, managed nonetheless to put in the hard work of reading a
grepared statement denouncing the SAIC students who had faced

own brutality and arrest just hours earlir. The, CJP statement
condemned them for following principles of “horizontalist”
organizing instead of putting CJPin charge of their action. In these
saine remarks, CJP promised the UChicago encamprment that as
long as they followed CJP leadership, assistance in_terms of
“community support” (CJP’s ability to mobilize crowds) and a CJP
“efense specialist” would protect them from facing a similar
response from CPD or UCPD. While speakers at UChicago rallies
earlier in the day had invoked the Haymarket martyrs and Kent
State shootings while condemning state violence against
protestors, there was no sympathy or solidarity for the 68 students
arrested at SAIC among the careerists and their allies. While many
campers were disgusted by this and made it known, other
participants in the hight’s “reportback” leveraged the arfests to
push_their provincial claims to_political authority—from CJP
Tepresentatives to a few local radicals who jumped on the story,
and amplified CJP’s denunciation of “horizontalists” just like
them, simply to settle old scores.

Despite_all this nonsense, the large crowd gathered for this
assembly called a vote on the futtire of the camp and voted
overwhelmingly to stay and defend it in the face of a police raid.
That evening, as negotiations on the Gaza_Scholars at Risk
program between Core organizers and the university continued,
new metal and wooden barricade materials appeared in the camp.
Following its pattern of appropriating the language of rank-and-
file opposition (and redefining it to the point of meaninglessness),
Core began to claim to be “horizontalizing” the camp. They
backtracked, clarifying they were not sharing “leadership” with
other organizations. Surrender Faction made this hierarchy very
clear when they cleverly redefined the meaning of the popular
notion that we ought to “defend the camp.”

Sunday marning. The morning assembly focused on two questions
Will we defend the encampment? If so, how? Although an
overwhelming number of participants had voted to “defend the
camp” rather than leeing in the face of police the previous night,
the Surrender Faction fad repackaged this resolution by thé
morning to mean: We will defend the camp by fleeing it in such a
way that press films a small number of our arrests while holding
(but not using) shields. As a participant would later note, this
traded defense plans for efforts at “the symbolic appeararice of
efense.”

The meeting started with an update on negotiations. Core
organizers claimed they had stalled the university's negotiatin
team to gain time. The university had asked which of the Jiste
demands of the ercampment was the easiest to fulfill, to find a
small concession they could hand over. The negotiators Stated this
was in good faith, However, it was unclear whether the university
negotiators saw it as such or believed they could bargain an
Coricession from the university in exchange for pledging to pul
down the camp. Under pressure, key careerists dismissed the idea
of ending the éncampment in éxchange for symbolic gains and
“rejected” any outcome other than a serious win. After this report,
the general assembly body as awhole intended t0 splt ntg groups
to discuss as small groups how people felt about defending the
camp, along with preferred methods.

At this time, a r;presentative of FJP arrived to give an imposition
from the “Red acult‘ll" §mup, who had previously touted their
willingness to be involved in peaceful, photo-op arrests. Some of
these Same professors had tried to run in front of the shieid wall on
Friday to stop the fascist counterprotest, armed with nothing but
middle-class respectability and vibes, until the real threat of
physically violent, drunken frat boys forced them to retreat. Two
days latet, they proclaimed they would not be involved if campers
used shields to defend the ‘encampment like Friday’s raid.
Furthermore, they announced that Chicago Teachers’ Union (CTU)
union membérs were ready and willing to defend the encampment
but would likely be unwilling if campers used shields. (They further
clarified that CTU members would also be unable to assist the
encampment late on school nights, which was somewhat stnkm%,
considering that they brought this up as a considerable
consideration on a_Sunday.} These announcements heavil
influenced the flow of conversation and opinion within the smal
group discussions that followed immediately after.

After the announcement from the FJP representative, the breakout
group discussions began in earnest. In these groups, attendees
broadly discussed, in small part, the question of what they would
be willing to accept in exchange for conceding the encampment
and, in lafge part, the methods people wished (5 pursue to protect
it. Several “Red Faculty” pushed hard against campers using any
form of shield during those meetings. After group sessions,
everyone returned to the G to report back, with 3 representative
chosen bX each group to summarize their discussion. The reports
roughly displayed a mood of hesitance about any kind of action
much concern’about provoking cops and much hope that “Red
Faculty” would be able to defend the encampment alongside large
groups of rallied protesters. Faculty practically uninvolved in the
Camp's life and invested in nothing more than a televised video of
their willing arrest were thus ablé to derail serious discussions
among thosé who wanted to defend the camp.

In practice, the breakout group structure precluded any effective
decision-making, After three-plus hours, Core did not hold a vote,
nor was any other conclusive means of moying forward offered,
and they actively sequestered dissent and discussion away from
decision-making processes. We noticed a consistent pattern in
which the careerists would identify a person advocating for
strategy and tactics to the left of their own, surround them, and
lead them away from large groups. Following this general
assembly, a small group split Off to discuss a defense plan,
primarily consisting of Coré organizers, Core postponed moré
comprehensive defénse plans until the afternoon. They also
officially announced the Gaza Scholars at Risk program to the
public. However, those negotiations quickly broke down without
the administration’s concrete commitment to the program.
Meanwhile, rumors of an impending eviction spread and the
careerists once more shed their fear of Gutside agitators, calling for
a community “mobilization” to descend on the camp.

Sunday evening. After all the encampment’s rallies and speeches
bold declarationis and rhetorical gestures toward the possibility o
another world, and tokens of Courage large and small, what
happened next strikes us as the peerless apex of the’entire
UChicago encampment experience. ‘After the Surrender Faction
organizers had successfully recast the vote to “defend the camp”
as a retreat, replete with photo-op arrests for them and their
faculty pals, they vanished into another of their elite meetings to
fine-tune the conditions of our surrender. With no visible
representatives of the camp’s power structure and with the buzz of
a potential post-midnight police raid in the air, someone with no
authority to tell anyone to do anything began to pick up chairs,
pallets, and other stray wood, linking it all fogether to fortify the
camp's weak and largely symbolic barricade.

Slowly, others joined in. Dozens of people, many of whom had not
participated iri any of the sham decision-making at the general
assembly, much less talked to each other beforé this moment,
joined together to repurpose an impressive array of supplies to
build a genuinely defensible wall. Tables, chairs, wood scraps, and
two-by-fours began to vanish from nearby university buildings.
Five twelve-foot panels of chain link fencing, destinéd for some
pointless construction project or another, bécame a solid flank
along the likeliest entry point for a police raid. As the fortifications
around our encampment grew, some of the careerists watched
uneasily; we overheard some commenting bitterly to each other
that, in case of a police raid, there would be hours and hours of
motie, as the cops would ot $imply drop (rom the sky. Others tried
to dissuade rank-and-filers from building barricades with
alternating threats"and pleas, most of wiiich were politely
acknowledged and summarily brushed aside. Despite their
disapproval, the many people who wished to preserve the camp
and its powér worked on, wordlessly cooperating to place as many
obstacles between a futtire police raid and the camp interior as
possible. As the walls grew higher, campers taking power into their
own hands intelligently fortified the camp for the first time since
its establishment.

Atmidnight, the forces of the encampment and the swelling crowd
that had answered the call to defend the camp gathered in the
northwest corner of the quad in groups parceled Sut by personal
sk, assessment. Core Had inittally’ designated a thibe-color
gradation of riskc according to the defense plan, Red was for those

eople whowould stay as afinal layer until the efd and get arrested

v the pigs; Yellow was for those who would remain in front of the
Reds until the “final arrest warning,” then would leave; and Greens
were those who would leave at the order of dispersal. People were
encouraged to break out into their groups and speak with each
other, then wait to gather in their positions when the cops arrived.
One of the problems with this color-based safety grouping was its
fatalistic nature, with the Reds blurring the liné between wanting
to be arrested and willing but not preferring to be arrested. And by
more or less intending to get uneventfully arrested, many of the
Reds proved to be the most useless.

‘The color system’s rigidity also discouraged thinking about what
actions camipers could take to defend the camp that would be risky
butwould not automatically lead to arrest. We who are comfortable
breaking the law but want fo get away with it struggled to relate to
people, €specially the Red factlty, who seemed overly eager to don

ex cuffs. As the encampment broke out into color groups and
began fo talk and plan, many realized heip risk assessments did
not fully map onto this three-color system. The organic creation of
the “Orange” role and the organizers’ concession to the crowd by
‘making it an “official” category revealed the willingness of many
people within the crowd to take Tisks without a fatalistic attitude of
sacrificial arrest, Meetings were then held with the four new color
roles, as organizers went over the plan for evacuation of the
Greens, the fallback plans of the Yellows and Oranges, and the final
“defense” of the Reds.
At this juncture, the stunning naivety of the camp’s self-styled
leaders became obvious. Their clever plan for evacuating Greens
hinged on the Greens making their way to the camp’s Welcome
tent, where graduate students would escort them through the line
of rlot cops and into “safe” buildings. The rationale? These
graduate students were unionized and thus had contractual
Workplace protections, which the architects o this plan imagined
the police’ would recognize and would magically encompass
escorted non-GSU campers. Furthermore, we would eventually
learn_that the administration’s threat model placed building
occupations and all attempts at initiating such an action at the top
of their escalation ladder. Any attempt toenter buildings, even just
to “pass through” them, would have been understood by police as
the beginning of a building occupation and would have prompted
violent escaldtion from campus or city police, As those moving
through the buildings in this scenario would've been the most
risk-averse individuals during an active and chaotic raid, this
approach would likely have restlted in myriad casualties.

A& this time, nobody was sure whethe the raiding patty would be
UCPD or thé regular Chicago cops, who openly delight in tuning
their clubs on activists’ heads. We had seeri the Tmages from
Columbia, UCLA, and other campuses; we believed we ought to
prepare for that level of aggression. In a heated exchange, sormeone
asked a large group of carcerists if any of them had any experience
dealing with “actual riot cops. To their credit, they answered
honestly: no.

Monday morning. No_ police raid materialized. In the hours
between the defense planning meeting and the dispersal of the
crowd around 3 a.m,, campers held varlous meetings intended to
iron out the details. These changed and evolved as péople began to
think of different ways to defend the camp, intluding staying
behind the barricades. In the Orange meeting, some participants
pushed against the notion that abandonifg the camp was
preserving it. The facilitator promptly shut this down. When
another Orange spoke up, demanding a vote on the matter,
someone said, ' Look, another white man asking for a vote.” Thesé
interventions were too little, too late. And it was sad to see. Many
campers had built the barricades and reconsidered what it meant to
defend the camp, talking of possibilities of resisting from within
the walls we had built inctead of a slow abandonmekt, which now
seemed all but certain.

‘The improvised Orange category was the only silver lining in this
sad spectacle. While Red faculty prepared to upload new default
Facebook photos of their righteous brushes with the law, Oranges
openly discussed the tactic of “de-arfest,” in which they planned
to grab arrestees and pull them away from police. Regrettably, this
escalation was promising but did not generalize to defending the
whole camp.

Students and faculty arrived at the Main Quad in the morning to
find the encampment fortified with materials appropriated from
across campus: it was a beautiful sight! However, as campers tried
to reinforce them throughout the day, cops grew more aggressive
toward people bringing wood toward the barricades, leading
campers to suspend ‘such efforts. One incident was patticularly
illuminating. After a comrade was stopped and namechecked by
cops simply for moving a two-by-four about five inches over the
‘mesh fencing, he decided that the best use of his time was to show
us how to tape books around our torsos and avoid internal organ
damage before he left. Exhausted from the late nishl, oon edge, and
stresséd, the Monday crowd was much smaller and quiieter, though
there was still some talk of defense. From nightfall onwards, cops
systematically entered and swept through every building, from top
to_bottom, around the encampment. Coupled with the pigs’
renewed and intensified aggression towards anyone who came
within a few inches of the barricades with material, it was clear to
us that whatever directive from the top brass that previously had
kept the cops in check was no longer in play.

Monday evening, At 10:58 pm, a public announcement from a local
journalist broke the tension: a “well-placed source [told him] the

niversity of Chicago will attempt to clear the [encampment] at
3AM tonight” This announcement immediately kicked off a
panicked firestorm of activity, and people began heading back
towards the encampment. The raid tip-off had forced the self-
declared leadership and the various camp defenders to lurch out of
the day’s inertia for something like a last stand. Our ranks,
however, looked quite spindly; the encampment was down ir
terms of personnel in general, but specifically and critically, most
of lhec})eople ‘who had both the experience for and commitment to
defending the camp were not there. Those most personally
involved in the camp’s defense had returned to their various homes
and jobs due to the start of the work week and the exhaustion of
having prepared for acomplete defense the previous night when no
threat materialized. Also, they had gotten sick of being red-baited
and insulted bg the careerists and their faculty allies, especially
after the shield wall had saved the day on FndaK. ‘While we al
vowed to stay until the end, we can’t fatlt those who had taken or
were prepared to take significant risks to protect the camp only to
be thrown under the bus by the opportunists who now, once more,
cried for help.

The actual raid’s threatening imminence, compared to_the
interminable vap sessions of the weekend’s general assemblies,
forced the differing factions to attempt to collaborate in earnest.
Comrades who had pushed for a clear and practiced defense
strategy without conceding to mass arrests and clearance as an
inevitability suddenly found themselves consulting with marshals
and leadership, who had previously-railioaded them out of
meetings, to formulate a last-minute defense protocol. After
frenetic discussions over whether to take the tip-off seriously, an
announcement was posted to the UCUP Telegram channel at 12:03
AM that they had “received credible information that police WILL
be carrying out a raid against the UChicago encampment in the
coming hours.” At 2:03 AM, a penultimate update before the go-
home Signal went out on the channel: all buildings were locked:

In those two hours, sympathetic Core members and a prominent
camp defender began to coordinate a defense plan with three main
points_of action. First, all valuables and “Greens” were to be
immediately evacuated from the encampment via cars. Second,
barricade materials were to be staged near the Western flank of the
camp so that defenders could control the Western routes to the
quad when the time came. Third, organizers were to announce and
coordinate amass mobilization, marking the climactic action of an
orderly retreat on Ellis Avenué. With community members with
defense experience largely absent and with no_practicable
practical, and pre-existing plan for defense, a successful defense of
the camp appeared implausible. The careerists had wasted so much
time with their filibusters and silly little games that all actual
preparations for a potentially dangerous encounter with the police
‘were now improvised ad hoc, absenit many of the people who would
have given us a fighting chance. A relocation to Ellis and march
away from the encampient site would at least offer the possibili
of a strategic retreat that could preserve the equipment an
capacity necessary to continue the struggle.

Initially, Core organizers proceeded with these suggestions with
total and immediate cooperation; however, this only lasted a little
more than an hour and a half before the gridlock of the previous
days soaked into the plans and undermined the on-the-fly camp
defense strategy. Of the plan’s three points, the first happenied, the
second did not, and they bungled the third. A considerable amount
of valuable equipment (construction tools, sound systems, etc.)
and uinerable peaple did. escape, having been whisked away
shortly after, midnight. When caripers and sympathetic Core
members at the encampment moved to relocate the barricades,
resistance against physical defense from the Surrender Faction
stonewalled this effort, Lastly, instead of the proposed strategic
retreat and rally on Eliis, for which UCUP had begun to put out
mobilization messages, these Core members changed their minds,
choosing to mobilize oh the quad, which provided much more risk
of encirclement and no practical direction of retreat.

‘The proposed joint plan for evacus
settled back into the careerists’ i
those who craved it and uncoordinated scattering for others, as no
one was certain where the rally was supposed to occur. After this
point,coordination between camp defenders and Core organizers
roke down, not resuming until the raid earnestly began around
530 AM. The proposed strategy did supplant Core’s complete
fantasy of miraculous graduate Students leading Greens through
buildings to safety, which was the backbone of Core’s initial
defense plans. Unsuccessful attempts to meaningfully coordinate
between Core and camp defenders on Tuesday morning likely
helped to avert a much worse clusterfuck.

Tuesday. At 3:30 in_the morning, notable members of Core
announced that a raid was not imminent, and everyone who had
shown up for defense could go home. By this point, however, it was
a fait accompli that “defense” really just meant handing thé camp
over to the cops and maybe watching a few professors and student
movement bureaucrats get cuffed G camera in the process. S0
most people had stayed Rome in the firstplace. And why wouldn't
they?

Around 4:30 AM, after the all-clear signal had already gone out on
Telegram, two UCPD SUVs blazed onto the Quad, steps away from
the éncamipment’s Eastern flank. In an unpredicted turn of events
in all defense discussions, the cops did not give ample warning of
their arrival: they did not Stage en masse, nor did they slowly creep
upon the encampment: Insiead, they uilized the extteme mobility
of cars and armored personnel carriers: they drove directly to the
front of the encampment, and kitted-out riot cops unloaded en
masse on_the doorstep of the camp. Within seconds, they were
already within the walls of the largely undefended encamfment
before anyone could even realize, much less put out calls for
‘mobilization. UCPD officers and Allied Security rent-a-cops
ripping apart the (unattended and unwatched) barricades roused
the few students (many of them Core organizers) and communi

embers left in their tents. One student was pushed down ang
injured by a UCPD officer as the campers were forced out of their
tents and quickly pushed off the quad.

UCPD then put up plastic barricades between one entrance to the
quad, which became the rallying point as community members and
students trickled in. The evicted campers formed a [ine against the
barricades, and there were moments when the front-line group of
thirty or so began to push against the cops, forcing them back a few
steps before reaching a stalemate. Prominent Core members who
had denounced the shield action were seen, in these heated
moments, usmgflthe plastic barricades against the cops! Perhaps
they had learned the error of their ways. Or maybe they hoped to
salvage their arrest photo-ops from an eviction designed to
prevent them.

The crowd grew slowly. News reporters rolled in, and
photographers snapped pictures of the crowd, still small in ‘the
early morning hours Eventually, the shoving match with the cops
stopped, and waves of chanting continued until a little after 7
when the police suddenly pulled back the barricades. The students
and gathered crowd broke out into cheers, but just as they marched
throtigh the entrance to the Main Quad, the last of the utility cars
rolled away, and the emptiness of the quad revealed itself. The onl
traces left of the camp were squares of raw ground and yellowef
grass. UCPD officers loitered at the entrance of Levi Hall but
otherwise had disappeared, their job done: They had cleared the
camp, arrested nobody, and averted the potential for spectacle.
UChicago beat the student and faculty organizers, who thought
themselves astute practitioners of social movement realpolitik, at
their own game; the university knew they wanted symbolic arrests
and deprived them of even this little victory.

At this, the crowd of about a hundred people that had built over the
‘morning gathered in front of the steps to Levi, as students and
campers Stood in front of the steps, arms and hands locked
together in the manner lhe}‘]had learned over the past week. But it
was too late. There was nothing left to defend. Student organizers
led the same old chants and gave a few short speeches, but the
(threat of) rain swgpt the scene clear of people. The encampment
was over. As of writing, CJP’s promised Tesources and cavalry in
exchange for the encampment renouncing some of its most
dedicated activists have yet to arrive. Even when eviction had
loomed as a matter of mere hours, CJP’s leadership and its
imaginary battalions stayed home.

VII. In The Aftermath

Two attempts to harness the movement’s energy, or whatever
remained of it, illustrate the crossroads we face moving forward.
On the Saturday following the camp’s eviction, UChicago Students
for Justice in’ Palestine called for an action to disrupt the
university’s Alymni Weekend. After predictable litany of concen
trolling from the careerists, the action amounted to little more
than red handprints on someé beer tents alumni were drinking in—
which the Surrender Faction scrambled to help clean up.
Meanwhile, another crowd had gathered on the Midway Plaisance.
The rally began with the usdal-chanting, but as it futned into a
march, the composition of this crowd—which brought genuine
efforts to protect identities and a lack of campus Careerists—
promised something different from the morning’s art project. As
the crowd advanced down Woodlawn, the leaders drew the crowd
to the Institute of Poltics, where a group of people dressed in bloc
quickly moved up e steps and Into the building, As the rest of the
crowd either milled on the sidewalk or rushed excitedly to the
poich, the militants inside got to'work blocking entrances and

anging banners from the roof. No longer the Institute of Politics,
now the Casbah Bassel Al-Araj, the occupiers declared: ‘1. Fre¢
Palestine 2. Abolish the University 3. Land Back 4. Fuck
Gentrification 5. Fuck 12.”

‘The occupiers held the building for about half an hour before the
cops broke_through. The pigs didn’t arrest anybody as_the
occupiers climbed out the front windows and into the safety of the
crowd below. Meanwhile, a festive vibe continued outside the
building well intg the night, The militants who carried out the
occupation have their productive critiques of how the action went.
For those on the outside, it impressed upon us what could be
accomplished by those willing to simply ignore the bureaucratic
Tachihations of the movemekts self styled leaders and seize an
opportunity to do something.

This autonomous action also visibly invigorated the crowd.
Throughout the evening, protestors demonstrated a willingness to
ress Up against the cops and move against them as a crowd, even
eginning to surround them with improvised barricades of patio
furhiture and pushing them out of the Casbah’s backyard. The
careerist Core members left out of the planning for this action
arrived Jate and immediately attempted to co-opt and “de-
escalate? by standing between cops and protestors, a5 well as
preventing efforts to remove cops from the Casbah grounds. At one
oint, they tried to convince the crowd to move onto the Main
uad! the crowd summarily ignored them. While they had to be
publicly supportive of the occupation, lest they lose face, their
actions on the ground and commentary after the fact made clear
their disapproval of an action occurring on campus outside their
purview, without their structure of marshalls, police liaisons, and
other elements of safety theater.

‘The Casbah educated the campus’ Palestine movement in practice
where the encampment had tried—with thornier results—to raise
political consciousness. A group of militants unatfilited with any
aboveground organization had pulled off an attack on a building
that routinely hosted the University of Chicago’s political allies,
from Lori Lightfoot to Anthony Blinien. They had done so without
arrests and Rad demonstrated to non-occupying participants that
a sufficiently brave and intelligent crew could take decisive action
against the university without UCUP sanction. A degree of
coordination and militancy relegated to distant Columbia and Cal
Poly Humboldt occupiers suddenly arrived at the University of
Chicago—and the window of what campus militants considered
possible shifted as a result.

Who were they? These occupiers had left the camp early, as we
were digging n for a protracied (and losing) struggle to siape s
outcomg, and had simply invested their energy elsewhere. As in our
failure t0 establish contact with the radical bloc of Core, we had
been operating largely ignorant of their existence, leading us to
mistakenly consider ourselves an insignificant minority in the
‘movement's rank-and-file. The Casbah action taught us that this
way of thinking was misguided—that numerical minorities can
practically shiff what seerns possible to the majorities in which
they move.

As the genocide in Palestine continues and the movement opposing
it deepens in the coming year, we ought to take note of the
newfound ability shown by these comrades to model the leading
edge of the struggle. To'that end, we can only benefit from
coordinating our actions to test and éxpand the bounds of what the
moverment considers possible. The next leg of the struggle will not
be without similar opportunities—and “when radical moments
come around, we must grasp them with both hands.”

By contrast, at the University of Chicago’s graduation, a small
group of dedicated militants had decided to use a crowd gathered
uring a walkout to facilitate an interruption of a graduation
ceremony nearby. UCPD responded with rfelatively-
uncharacteristic force: not only was the planned site of the post-
walkout rally barricaded off, but the members of the crowd who
threw themselves at the police barriers were summarily pepper
sprayed, taking many out of commission for the rest of the day.

As the confrontation escalated, those willing to stand at the
barricades dwindled, and the militancy of the crowd’s response
lessened; eventually, g sixty-year old Palestinian mother of a
graduate was picked off, pulled over the barricade, pinned to the
ground, and arrested. The remaining crowd shied away from
Confronting the police, chanting instead: “We are the Intifada, we
are the revolution.” We can’t think of a better visualization of the
careerists’ politics than this. Meanwhile, the various blocs of the
Chicago organizing crowd revealed themselves under stress: vocal
liberals juriiped on the moment with calls to disperse, while others
seized the opportunity to yell at police; aspiring movement leaders
(thankfully kept from positions of authority in this instance) gave
speeches to an inattentive crowd, as UCPD and CPD vans rolfed up
t0 block the path between the barricades and our target.

After this first battery of speeches, a particularly visible careerist
from the encampment began to march the crowd in the opposite
direction of the site where organizers slated an interruption to
occur, a decision thankfully reversed by action leadership, who
proved sympathetic to the militant edge of the crowd. Once the
march had reached the site of the planned intervention, organizers
had to coax the careerists into bringing the crowd up to the stage,
where a dozen or so of CJP-action attehdees lingered—too few to
pull off the planned disruption, But this last-ditch effort to secure
avictory in defeat was delayed by more speeches. Ultimately, when
the crowd declined to follow one militant over a set of red velvet
ropes suEgesting Froleslurs no{jgass, this too was stymied, leaving
them to Bounce off a couple of UCPD officers.

Vlll¢sefgee Palestine, Free

Where to %fl after the encampments? We consider this an open
1uesuon that we should debate honestly, free from pleasing

illusions and clichés, among the sizable mass of activists mobilizes

by the encampment wave. Answering this question requires clear-
ejed assessments of the limits ach encampment ran into,
considered alongside the most promising political developments
they brought info being, We hope that our efforts to outline the

contours of the UChicago encampment will help broaden such a
discussion, and we encourage others to similarly reflect and
respond toour assessment of our own experiences. The lessons of
the encampment wave are not readily apparent; we must draw
them from collective thinking and debate, ideally outside toxic and
superficial discourse found on social media, Now that the
encampments are mostly gone, the energy and hope conjured b
these bold actions of building commons, no matter how limited,
can either be folded back into'a dull and failing reformism or elsé
can_point toward a new chapter in anti-imperialist and anti-
capitalist politics. On the most basic level, this necessitates the
hard work of defining what the camps were and what the post-
encampment moment could be.

As encampments across the country have come under fire from the
political right and experienced repression_from _university
administrations and_police forces alike, many progressive
commentators have defended them as legally valid exercises in
“free speech.” In a particularly nuanced analysis, UChicago history
professor Gabriel ‘Winant argued that our encampment was
acceptable within, the standards of the Kalven Report, a 1967
document prescribing the university adopt broad politica
neutrality, according fo the so-called Chicago Principles, and
permit_all manner of free expression. Claiming that the
“encampment embodies only free expression and modest
inconvenience,” Winant accidentally underscored the trap set by
well-meaning movement supporters who were desperate to keep
them within' the bounds of respectable liberal democratic
perticipation. And it is precisely hese bounds that the Pro-
alestine movement must escape if it is ever to be anything besides
afutile exercise in “speaking truth to power.”

‘The UChicago Popular University for Gaza’s material power was
not its righteous speech. Tt was bold, collective action against rules,
order, respectability, and sometimes laws. The Core members who
understood the encampment as a lawful exercise in speaking truth
to power were the camF"s ‘most conservative voices and spent far
‘more time attacking leftists and undercutting the encampment’s

ability to sustain itself than they did fighting to free Palestine.

iThere is no doubt that the state is taking us seriously,” Don
Hamerquist wrote in the Anti-Racist Action Research Bulletin in
May 2001

We should also take ourselves seriously. Playing the innocent
victim is not serious. Treating IEKIESSIVE policies as if they were
reflexive reactions of idiots and thugs is not serious. Much of the
content of movement talk about ‘criminalizing dissent,’ about
mass and pre-emptive arrests, about police britality and ‘non-
lethal weaponry’ substitutes a liberal public relations stance, and
an ineffectual one at that, for an analysis. We won't get anywhere
or gain anything by reacting to inciderits of repression with appeals
to civil libertarian rights to protest. The state isn’t committed to
these ‘rules of the game,’ and the movement isn’t either—or at
least it shouldn’t be.

Campers widely mocked University of Chicago President Paul
Alivisatos when he wrote: “I believe the protesters should also
consider that an encampment, with all the etymological
connections of the word to military origins, is a way of using force
of akind rather than reason to persuade others.” Laughing off this
observation as the words of a bookish administrator created a
missed opportunity. After all, was he wror:fi:]Was the purpose of
the camp to use reason to persuade others? Why did those claiming
their actions would “Globalize the Intifada” react derisively to the
idea that they were considered partisans in a military operation?
‘The activists who sought to laugfi off Alivisatos told us more about
their sense of the encampmient’s political importance than
anything,

When our activities are all in good fun within the rules of capitalist
hegemony, this is a critical flaw to redress immediately. The notion
that the camps were “just expressive conduct” played into the
dead-end strategy that understood them as efforts to
communicate witlr tniversity elites rather than the basis for taking
space and exerting political will as an end in itself. Rather than beg
for respectability and egitimacy i the eves of the very institutions
we seek to destroy, we must instead strive to become the menace
our enemies already believe us to be.

To this effect, a curious slogan brought great promise to the
encampment, which it largely squandered: “Globalize the
Intifada!” Few sentiments we Eave heard capture the fundamental
interconnectedness of the struggle for Palestinian self-
determination with the global fight against capitalism and the
crises it wreaks, however unevenly, throughout all societies and
struggles for Self-determination. The Palestinian_resistance
représents some of the bravest and most innovative tactical
incursions against the repressive might of global capital, and to
place ourselves as an of that struggle is both enlivening and
Sobering in terms of what it may call Uipon us to do. After alf, why
were we out in the streets at all, marching beneath the Palestinian
flag if not because of the bold, unsafe, and illegal action taken on
October 7th, 20237

It was thus profoundly absurd to witness the self-styled leaders of
the 'camp, in between baiting ‘outside agliators”
“horizontalists,” and all the other bogeymen, Situatiny

themselves in the most militant expression of antiracist globa
resistance, all the while shutting down proposals that wotild be
inoffensivé to Greenpeace. One might imagine that in Hyde Park, a
flagrantly colonial outpost, intelligent analyses of race would be
the ground floor for thinking politically. This imagining would
assurne that the stars of the University of Chicago’s activist scene

were interested in thinking politically. But many of the
encampment’s loudest voices Were only willing to bring up racial
politics so far_as it bolstered their conservative tactical
preferences—going home, listening to the police, actively
Intervening against confrontations with racists.

To this end, the careerists within Core bludgeoned proponents of
any tactical response to the encampment’s many threats with the
promise hat self-defense would invite brutality on the camp's

lack and Brown partcipants. Toelng this line, set by the Coaliion
for Justice in Palestine’s affiliates and “defensé specialist,” did not
provide the security it promised. When the raid did come, they were
nowhere to be seen: a CJP affiliate had called off the camp’s
defense, and the night watch had broken down, leaving the door
gpen to racialized police violence. But when students took to the
barricades against UCPD the following morning, the only injuries
were from batons—which would have been prevented by more
generalized shield training. By refusing to dignify the political
Hilitancy, which they had professed, with any commensurate
action or analysis, these movement bureaucrats-in-training had
added nothing of value to the struggle over which they claimed
unearned leadership.

It would be cheap to settle on the inadequacy of our activist fellow
travelers or to belabor the reticence of CJP crowds to confront the
police uniformly. All struggle develops unevenly, and Chicago
crowds are sim%ly scarce In the necessary Emctical expertise to
make large-scale confrontations imaginable or advisable. The
graduation action’s failure points us t6 its parts, which had the
Potential to add up to a more successful conclusion’ (1) our relation
to the various blocs of this campus’ pro-Palestine movement, (2)
our understanding of UCPD’s tactics and penchant for violehce,
and (3) the way the two might combine to open opportunities for
tactics more adequate to our strategic ends.

First, the division of Core between the Surrender Factionists and
disparate radicals largely determines their willingness to work
with movement radicals. The likelihood of successful, non-
allenatm% escalation at any action depends partly on whether the
action’s leadership will jump to condemn and isolate its more
ambitious participants. However, we should not see this
dependency as a static fact. At certain moments, the willingness of
the more conservative or undecided segments of the public-facing

Core to condone more radical tactics widens: during the standof

with UCPD at the barricades during graduation or in the immediate
aftermath of the raid, confronting the police was a real (if missed)
possibility. The near-willingness of Core to rely on movement
Tadicals in the lead-up to the raid also opens a question for us: to
what degree can we rely on the cooperation of conservatives within
the student movement, especially as they become aware that it is
necessary to defend themselves against police and fascists? This
question is unresolved, but it suggests the nascent radical bloc
within_this movement may expand as police confrontations
become_more common. We must sharpen our discernment
concerning our participation in these movements; we should be
ready to conclude, for example, that some public-facing actions,
especially ones led by careerists, are not worth our time; we should
also be able to identify actions that are sufficiently disruptive,
tactically advantageous, and populated by the right blocs of activist
paticipants as Belng' worth, our time. Navigating betueen

urnout-inducing pliability and over-conservativé abstention will
have to be hashed out practically.

Moreover, at every step of the encampment and ensuing actions,
any received wisdom about campus police-the ubiquity of arrest
warnings, the usefulness of police liaisons, the relative
unwillinighess of UCPD to harm protestors, the risks of self-
defense, etc.—was made obsolete by shifting police responses to
student radicalism. As the Palestine movement's actions drew in
more community members, including non-UChicago participants,
UCPD practices commonplace during prior ~actions = were
abandoned. It is not clear whether the Tesults trend uniformly
towards violence and away from “soft” counterinsurgency, but the
rank-and-file officers demonstrated a good deal of anger and
distress during camp dispersal and graduation; pepper spray and
violent arrest were new for many at the barricades. With increased
police violence against protestors has come a broader recognition
of the importance of “crowd safety” and self-defense—as this
realization continues to spread through the more conservative
elements of Core, it may be possible to close the gap between their
aims and ours at crucial moments.

Lastly, as self-defense increasingly becomes the order of the day,
we couild stand to isolate ourselves less. Promoting best practices,
in light of an observed track record of increased brutality against
students by UCPD, could bring these two tendencies into a

roductive whole: ¢rowds that know how to defend themselves

ave at least one fequisite component of belng brave when the
‘moment demands it. Opening the door for unlikely militants to act
out their political commitments is tactically advantageous for the
entire movement. As before, this will teach us that certain crowds
are not worth our limited energy to help “skill up”; this uneven
development of struggle, however, also extends to’ anyone who
arrives willing to employ riskier tactics.

The main obstacle facing any campus organizing project is the
contradiction between those whose interésts are limited to the
parochial matters of managerial campus politics and those who see
the campus as one (small) part of a much larger terrain of struggle
The presence of people with no affliation to the University of
Chicago was the primary strength of its encampment. They helped
us expand our horizons beyond bureaucratic jockeying within a
single intractably evil and elite institution and orient outward
instead to the struggles unfolding all around the globe. Ultimately,
a dead-end alternative to this necessary vision won out, for the
same reason the encampment ended with a whimper: we didn’t
have enough outside agitators!

Itbears repeating that none of this implies, s common narrative
of recent strug%es runs, that an impetus toward the correct
strategy emerged spontaneously, or that we offered one, only for
the “counterinsurgents” in Core to somehow sideline a vital and
focused fighting force. Instead, one of the most alarming products
of our colfective reflection on the encampment movengent is the
absolute shortage of strategic insights on the part of most
participants, including ourselves. Looking back, it is quite frankly
alarming how the dentands of the encampment imposed a stifling
political horizon on our thinking and limited all collective thinking
to narrow questions of tactics. When a comrade recently asked us
why none of us had proposed a strike of graduate workers to
coincide with the encampment, for example, obody could answer
except to say that we were probably debating how to expand the
physical footprint of the camp twenty feet in one direction or
another when we should have been drafting that proposal
Ultimately, the push for “escalation,” absent a broader strategic
horizon, amounted to a more militant version of the careerists’
plan to use the encampment to speak truth to power, as opposed to
the deliberate cultivation of counter-power capable of existing for
itself.

‘The conflicts around “escalation” in the day-to-day narrative of
the camp also reveal the limits of the term as it became memeified.
Campers ‘occupied. Hind's Hall on Day 2 of the Uchicago
encampment; hashtags like #EscalateforGaza, accounts like
Escalate Network, and zines entitled “We Don’t Need Safety — We
Need To Escalatel” meant we were responding to the idea within
the encampment wave. The phrase passed around the camp and
came to mean anything from moving a plywood wall, spray
painting a statue, occupying a building, or just remaining on the

uad. From the beginning, we wanted to catch up to other camps
that “escalated” to avoid becoming another Northwestern. Tf?e
camp was an attempt to get leverage over the administration,
intended to cause enough of a disturbance to force concessions.
Once inside the camp, however, escalation became limited by the
form of the camp. It bécame difficult to see beyond the day-to-day
conflicts over what “escalation” meant and the proliferating
images of escalation clouded real-time analysis of our particulat
possibilities, Some may have been calling to move “from the
campus to the streets,” but what was on people’s minds was
moving from the lawn'to the buildings. It was either escalate or
surrender, but our discussions of “escalation” never moved
towards what a long-term escalation strategy might look like
coming out of the camip.

This experience is not unique to the encampment but instead
represents a common experience we have shared in moments of
upsurge when abstract thinking is a luxury and issues that take up
a tremendous amount of time, Such as whether someone ought to
have knocked over a garbage can, seem in retrospect fo be
ridiculous. We have concluded that, just as we must improve
organizational capacity before the next wave, we must also
inCrease our capacity to think in common. Collective exercises like
this document are an attempt in that direction. As we write, the
tactical and strategic horizon of the Palestine solidarity movernent
and the broader struggle against capitalism remain woefully
inder-defined; instead: Tar tGo many intelligent comrades waste
their days debating bourgeois electoral politics in bad_faith
exchanges with total strangers on social media. A reevaluation of
priorities is long overdue.

Which brings us back to the fecund phraseology: “Globalize the
Intifada.” Saying the phrase exceeded the content in the case of the
UChicago encamiipment is as colossal an understatement as they
come. But we understand it as a challenge. It raises the question:
how can we engineer a situation where’the content exceeds the
phrase?

See you in the Fall!